EX-H_Final.pdf

PDF 4 MB Posted

Attached to
MDA Soil Vapor Monitoring
Solicitation number
RFP-0000476
Issued by

About this file

Exhibit H Final

View the file

Other files

File Type Posted
Exhibit_D_MDA_Vapor_Monitoring_FINAL_Rev1.doc DOC document
RFP-0000476_MDA_Final_Rev._1.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc DOC document
RFP-0000476_Amendment_1_Rev_0_071619.docx DOCX document
map_19-0011-07_MDA_H_wells.pdf PDF
IMG_0173.jpg JPG image
IMG_0157.jpg JPG image
Appendix_D_2_N3B_RFI.docx DOCX document
IMG_0177.jpg JPG image
Appendix_D_5.docx DOCX document
IMG_0146.jpg JPG image
N3B-SOP-ER-2008.pdf PDF
WCSF_Vapor_Sampling_DRAFT.pdf PDF
RFP-0000476_MDA_Final.pdf PDF
IMG_0158.jpg JPG image
MDA_SVM_Training_Matrix_Rev0.docx DOCX document
IMG_0154.jpg JPG image
N3B-ER-SOP-20235.pdf PDF
IMG_0271.JPG JPG image
Certificate_of_Current_Cost_or_Pricing_Data.pdf PDF
Exhibit_C_FORM_F_Project_Organization_and_Workplan.doc DOC document
IMG_0141.jpg JPG image
IMG_0183.jpg JPG image
EX-I_Attachement_B_-_Subcontractor_Submittals__MDA_SVM.doc DOC document
IMG_0266.JPG JPG image
MDA_L_-_Periodic_Monitoring_Report_for_Vapor_Sampling_-_Second_Quarter_FY11_LA-UR-11-4246.pdf PDF
N3B-AP-ER-1001.pdf PDF
IMG_0268.JPG JPG image
IMG_0253.JPG JPG image
Insurance_Requirements_RFP-0000476.pdf PDF
IMG_0167.jpg JPG image
IMG_0138.jpg JPG image
manifold.jpg JPG image
Exhibit_C_FORM_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_G_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_SDDR_Form_2178.pdf PDF
map_19-0011-05_TA21_wells.pdf PDF
IMG_0181.jpg JPG image
Exhibit_C_Form_H_Resume_of_Key_Personnel_-_FINAL.doc DOC document
Exhibit_C_FORM_B_Construction_Plant_Equipment_List.doc DOC document
IMG_0269.JPG JPG image
switches.jpg JPG image
IMG_0151.jpg JPG image
IMG_0172.jpg JPG image
IMG_0252.JPG JPG image
Exhibit_C_FORM_C-1_Lower_Tier_Experience_Statement.doc DOC document
N3B-ER-SOP-10094.pdf PDF
Exhibit_C_Form_A_-_MDA_Vapor_Monitoring_FINAL.docx DOCX document
collecting_tritium_samples.jpg JPG image
N3B-ER-SOP-20145.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex H (Rev. 10, 2/28/18) Exhibit H Quality Assurance Requirements

Dated 08/27/2019

Preparer Note (PN):

This document contains instructions in dark red text and blue hidden text. Do not delete the dark red text or any part of sections I thru VIII of this Exhibit since it's intended to be included with the final printed/saved copy.

Asterisks highlighted in yellow (i.e.,*) have been used throughout this document as placeholders to indicate where information is to be inserted (and the* removed) by the Requester/TSME. This includes but is not limited to the header date, PR#, and total page count in the footer of page 1 and page 1 of the TOC. The Solicitation/PO or Subcontract # in the footer of this page and page 1 of the TOC will be completed by Acquisition Services Management (ASM).

Do not modify the page numbering in the footer (except for adding total page numbers as indicated by*) since it's designed to be separately numbered from page 1 thru Section VIII of the Exhibit, and then separately numbered from the Table of Contents (TOC) (re-starting with page 1) thru the end of the Exhibit. You must have the blue hidden text (starting with the Table of Contents) visible in order to effectively/correctly complete this Exhibit however, it's not intended to print. To view hidden text, click on the ",I" (Show/Hide) icon on your tool bar. Alternately, see How To Set Your Microsoft Word Application To View Hidden Text. There is no need to delete the blue hidden text instructions as they will not affect the formatting of the printed document (except for total number of pages in the footer) and will not print unless the application's default setting is changed.

Make sure that after you delete the quality clauses you don't need and retain those you do, update the TOC before releasing this document.

This boxed-in Preparer Note may either be deleted or retained as part of this Exhibit.

INSTRUCTIONS: This Exhibit is to be completed by the Technical Subject Matter Expert (TSME) and optional Quality Subject Matter Expert (QSME) (except for weapons program procurements and procurements where Subcontractor is required to have a QA Program approved by N3B, in which case QSME signature is mandatory). The completed Exhibit H is signed and converted into Adobe pdf format and attached with the Requisition.

Exhibit H is required for:

• All on-site services (with or without items), regardless of Management Level (ML).

• All ML-1/ML-2, ML-3 item and service procurements, regardless of where work is performed.

• All weapons program (WP) procurements regardless of ML (or procurement quality level; PQL).

• ML-4 item procurements involving stand-alone circuit breakers and fasteners as defined in P840-

1, Quality Assurance for Procurements.

• ML-4 item procurements involving hoisting, lifting, and rigging equipment as defined in P840-1, Quality Assurance for Procurements.

Guidance on the selection of quality clauses is included as hidden text next to each clause. As an example, the QC-27 (S/CI) clause is required for all item procurements (including services with items).

QC-22 is required, as is QC-01A and QC-25 (unless compensatory measures allow otherwise) for all ML- 1/ML-2 & WP procurements. QC-01 B is required for all on-site procurements. QC-36 is required for all Safety Software or Risk Significant Software and WP procurements of software. QC-06 is required for all purchases of hoisting, lifting, and rigging equipment.

Complete the following sections I thru VII and use this information to complete the remainder of Exhibit H, after which, sign section VIII and scan for submittal with the procurement package.

NOTE TO ASM PROCUREMENT (or WP Processing Personnel): Pages that include sections I thru VIII of the completed Exhibit H are not intended to become part of the subcontract. These sections are intended for internal planning/documentation purposes only and should be separated from the Exhibit H and retained in the ASM or WP procurement file.

PR#_* _ER-PR-19-0126____ Solicitation/PO or Subcontract # �RFP-0�00�0476---

RFP-0000476

File details come from the government source that posted it.