This is an Independent Cost Estimate (ICE) guidance document prepared by the Orange County Transportation Authority (OCTA) for estimating project costs across three service categories: professional services, goods/equipment, and construction. The document outlines the specific line items and supporting documentation requirements for developing accurate cost estimates within each category. For professional services (architects, engineers, designers), estimators must document tasks to be performed, personnel types and positions needed, estimated hours by position, applicable salary or billing rates, profit/fee markups, overhead rates, direct expenses, and completion schedules, supported by current or past similar contracts, historical pricing data, and work performed by other departments. For goods and equipment, the estimate must include product specifications, quantities, unit prices, applicable markups and overhead, delivery schedules, and warranty information, supported by vendor surveys, market research, current or past contracts for identical or similar products, historical cost data, and published price indices. For construction projects, estimators must account for product specifications, labor costs using Davis Bacon wage rates or prevailing wages, material costs, bonds, insurance, mobilization, equipment, applicable markups and fringes, and completion schedules, supported by industry references such as the Means Book and Blue Book, Davis Bacon wage schedules, current or past contracts, and historical pricing data.
The guidance document emphasizes that all cost estimates should be based on average rates from positions listed on prior contracts, specifically referencing contract C-2-1513 and document FA-CAMM--006.docm dated September 25, 2015. This ICE template is intended to support the OCTA's Electronic Toll and Traffic Management System Technical Support/Oversight Services project, a fifteen-month engagement with a total budget of $480,000. The document serves as a standardized framework to ensure comprehensive and defensible cost estimation across all procurement categories undertaken by the Authority.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENT COST ESTIMATE (ICE)
OCTA
Estimate Type Items to Include Where to Find Supporting Information
Architects, Engineers, 1. Tasks you want done 1. Current or past contracts for similar Designers
2. Types of people needed (i.e., services engineers, administrative 2. Other properties / departments doing assistant, other) similar work
3. Positions (Project Manager, 3. Historical price and cost data Deputy PM, Senior Engineer I Planner, other)
4. Estimated hours by position
5. Salary I billing rates applied
6. Profit / applied fee
7. Overhead rate (%)
8. Direct expenses
9. Completion schedule
Goods/Equipment 1. Product needed 1. Vendor survey / market survey
2. Quantity 2. Current or past contracts for the same
3. Unit price or similar product
4. Markups, overhead, profit
3. Historical price and cost data
5. Delivery schedule desired
4. Various published indices
6. Warranty
Construction 1. Product needed 1. "Means Book"
2. Labor (at a minimum use 2. "Blue Book" Davis Bacon)
3. Davis Bacon wage rates / prevailing
3. Materials wages
4. Bonds 4. Current or past contracts for the same
5. Insurance project
6. Mobilization
5. Historical price and cost data
7. Equipment
8. Markups, fringes, overheads, profit
9. Completion schedule
Additional Information: Rates based upon average rates of position listed on prior contracts (C-2-1513).
FA-CAMM--006.docm (09/25/15) Page 2 of 3