About this file

This is a mechanical floor plan drawing for the Rex Putnam High School Chiller Replacement Project in Clackamas County, Oregon, prepared by System Design Consultants, Inc. The drawing shows two plans: a demolition plan and a new work plan for the mechanical systems, with particular focus on the boiler room (G31), storage room (G32), and outdoor chiller courtyard areas. The drawing is labeled as sheet M1.0 and includes both demolition and new construction details.

The plans detail the layout and specifications for replacing the existing chiller system, showing the removal of old equipment and installation of new components in the outdoor chiller courtyard. The drawing includes detailed sheet notes and general notes for contractors to follow during demolition and installation. The boiler room layout shows heat exchangers and storage tanks, while the outdoor courtyard area depicts the chiller equipment configuration. The mechanical systems' piping and connections are clearly marked with various line types and symbols, providing contractors with necessary technical information for both demolition and new installation phases of the project.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .