Rev M0.02 - Mechanical Schedules & Details.pdf
PDF 352 KB Posted
- Solicitation number
- S-P03012-00012402
- Issued by
- Clackamas County, Oregon
About this file
This mechanical drawing document contains chilled water and heating water piping schematics for the Rex Putnam High School Chiller Replacement Project in Clackamas County, Oregon. The detailed technical drawings show the complete layout of both the chilled water system and heating water system, including piping configurations, valves, boilers, and associated mechanical components.
The drawings (labeled M0.2) illustrate a comprehensive mechanical system design with two main schematics. The chilled water piping schematic shows connections to outdoor equipment, while the heating water piping schematic depicts a dual-boiler system (Boiler 1 and Boiler 2) with associated circulation pumps and control valves. The drawings include detailed notes regarding piping requirements and system specifications, which would be essential for contractors bidding on the chiller replacement project.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .