8. M1.0 - Mechanical Plan Demo and New Work - 12.24.24.pdf

PDF 275 KB Posted

Attached to
ITB-2425-111 Rex Putnam High School Chiller Replacement Project
Solicitation number
S-P03012-00012402
Issued by
Clackamas County, Oregon

About this file

This is a mechanical floor plan sheet showing demolition and new work plans for a chiller replacement project at a high school in Oregon. The plans detail the removal of an existing chiller, chilled water pump, heating water pump, and inline heating water pump, along with their associated concrete housekeeping pads and piping connections in the boiler room (G31) and adjacent storage room (G32).

The new work plan shows the installation of a new air-cooled high efficiency chiller with the same or smaller footprint as the existing unit, new base-mounted chilled water pump with VFD, new base-mounted heating water pump with VFD, and new inline heating water pump with VFD. All new equipment must be tied into the existing DDC system and installed according to 2021 Oregon Mechanical Specialty Code and 2019 Oregon Energy Efficiency Specialty Code requirements. The plans include piping modifications for chilled water and heating water systems, with all new piping to be insulated as required by Oregon Energy Code.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

PROVIDE STRUCTURAL BRACING ON ALL NEW EQUIPMENT AS REQUIRED BY THE

STRUCTURAL ENGINEER

REFERENCED CODES INCLUDE 2021 OREGON MECHANICAL SPECIALTY CODE AND 2019

OREGON ENERGY EFFICIENCY SPECIALTY CODE (ASHRAE 90.1-2019)

INSULATE ALL NEW CHILLED WATER PIPING AND HEATING WATER PIPING AS REQUIRED BY

2021 OREGON ENERGY CODE.

SHEET NOTES:

1 DEMO EXISTING CHILLER. DEMO PIPING BACK TO P.O.C. SHOWN. REFERENCE DETAIL 1 ON

SHEET M0.2.

DEMO EXISTING CHILLED WATER PUMP. REFER TO DETAIL 1 ON SHEET M0.2. DEMO

EXISTING 4" CONCRETE HOUSEKEEPING PAD.

DEMO EXISTING HEATING WATER PUMP. REFER TO DETAIL 2 ON SHEET M0.2. DEMO

EXISTING 4" CONCRETE HOUSEKEEPING PAD.

DEMO EXISTING INLINE HEATING WATER PUMP. REFER TO DETAIL 2 ON SHEET M0.2.

PROVIDE NEW AIR COOLED, HIGH EFFICIENCY CHILLER. FOOT PRINT OF CHILLER TO BE

THE SAME OR LESS THAN EXISTING CHILLER. REFERENCE EQUIPMENT SCHEDULEON

SHEET M0.1. MAINTAIN REQUIRED SERVICE ACCESS AREAS.

PROVIDE NEW BASE MOUNTED CHILLED WATER PUMP. INSTALL ON NEW 4" CONCRETE

HOUSEKEEPING PAD. PROVIDE WITH NEW VARIABLE FREQUENCY DRIVE. TIE NEW PUMP

INTO EXISTING DDC SYSTEM. REFERENCE CHILLED WATER PUMP CONTROL DIAGRAM ON

SHEET M0.1. REFERENCE EQUIPMENT SCHEDULE ON SHEET M0.1.

PROVIDE NEW BASE MOUNTED HEATING WATER PUMP. INSTALL ON NEW 4" CONCRETE

HOUSEKEEPING PAD. PROVIDE WITH NEW VARIABLE FREQUENCY DRIVE. TIE NEW PUMP

INTO EXISTING DDC SYSTEM. REFERENCE HEATING WATER PUMP CONTROL DIAGRAM ON

SHEET M0.1. REFERENCE EQUIPMENT SCHEDULE ON SHEET M0.1.

PROVIDE NEW INLINE HEATING WATER PUMP. PROVIDE WITH NEW VFD. COORDINATE WITH

NCSD IF EXISTING VFD CAN BE REUSED. TIE NEW PUMP INTO EXISTING DDC SYSTEM.

REFERENCE HEATING WATER PUMP CONTROL DIAGRAM ON SHEET M0.1. REFERENCE

EQUIPMENT SCHEDULE.

PROVIDE NEW CHILLED WATER SUPPLY AND RETURN PIPING FROM CHILLER TO POINT OF

CONNECTION. INSULATE PIPE AS REQUIRED BY OREGON ENERGY CODE.

BOILER

ROOM

G31

STORAGE

G32

EE

HWP-2

6" CHWR

HEAT EXCHANGER /

BOILER-1

BOILER-2

HW STORAGE TANK

CHWP-1

E

E

E

E

6" CHWS

E

6" HWS

6" HWR

E

6" HWR

2-1/2" HWR

HWP-1

E

E

E

EXISTING

EXPANSION

TANK

OUTDOOR

CHILLER

COURTYARD

E

E

E

E

EXISTING

CHILLER

6" HWS

6" HWR

HWP-1

6" CHWR

HEAT EXCHANGER /

BOILER-1

BOILER-2

HW STORAGE TANK

CHWP-1

E

E

EE

6" CHWS

BOILER

ROOM

G31

STORAGE

G32

E

E

E

E

HWP-2

6" HWR

2-1/2" HWR

EXISTING

EXPANSION

TANK

OUTDOOR

CHILLER

COURTYARD

E

E

E

E

E

E

E

E

MAINTENANCE

ACCESS AREA

CH-1

M1.0

JF

MECHANICAL FLOOR

PLAN

REVISIONS:

ISSUE DATE:

SDC JOB #:

DESIGNED BY:

CHECKED BY:

DRAWN BY:

SET TYPE:

R

EX

P U

TN

A

M H

IG

H

S C

H O

O L

C H

IL

LE

R R

EP

LA

C

EM

EN

T

N O

R

TH

C

LA

C K

A M

A S

SC

H

O O

L D

IS

T.

S E

R O

ET

H

E R

D M

IL

W

A U

K

IE

, O R

EG

O

N

SYSTEM DESIGN CONSULTANTS INC.

333 SE SECOND AVE

SUITE 100

PORTLAND OR

97214

503-248-0227

NCS2401

12/24/2024

SCALE: 1/4"=1'-0"

MECHANICAL SYSTEM DEMO PLAN1

M1.0

NORTH

59898

OREGON

EXPIRES: 12/31/25

PROFESS IONAL

DERETSIGER

NEERIGNE

9, 2 0 0 2

YLUJ

D. F A R L E Y

NHOJ

SCALE: 1/4"=1'-0"

MECHANICAL SYSTEM NEW WORK PLAN2

M1.0

NORTH

NB

NB

File details come from the government source that posted it. Updated .