Rev E2.0 - FP New.pdf
PDF 230 KB Posted
- Solicitation number
- S-P03012-00012402
- Issued by
- Clackamas County, Oregon
About this file
This is an electrical floor plan (drawing E2.0) for the Rex Putnam High School Chiller Replacement Project in Clackamas County, Oregon. The drawing shows a partial floor plan at 1/4"=1'-0" scale depicting the boiler room (G31), storage room (G32), team room (G26), coaches room (G25), and an outdoor chiller courtyard with maintenance access area. The plan details the locations of key mechanical equipment including heat exchangers, boilers (Boiler-1 and Boiler-2), hot water storage tank, and various pumps (HWP-1, HWP-2, CHWP-1) with their associated VFD controllers.
The drawing includes technical details for electrical equipment installation, with specific notes about verifying connection locations with equipment suppliers prior to rough-in and sealing around conduits. Electrical equipment is shown located on a mezzanine level, and the plan includes coordinate routing instructions and general notes regarding electrical contractor requirements. The drawing appears to be part of a larger set of construction documents, indicated by the professional engineering stamp and revision information in the title block.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HWP-1
HEAT EXCHANGER /
BOILER-1
BOILER-2
HW STORAGE TANK
CHWP-1
EECC
TEAM ROOM
G26
COACHES
G25
BOILER
ROOM
G31
STORAGE
G32
HWP-2
OUTDOOR
CHILLER
COURTYARD
MAINTENANCE
ACCESS AREA
CH-1
C-B
N
LINE OF MEZZANINE
SD-EN
E
V F
D
F
F
(P-13)
(SMALL PUMP)
(P-12)
VFD - CHWP-1
(P-13)
VFD - HWP-2
SMALL PUMP
VFD - HWP-1
(P-12)
V F
D
V F
D
VERIFY CONNECTION LOCATION
WITH EQUIPMENT SUPPLIER,
PRIOR TO ROUGH-IN
SEAL AROUND CONDUITS,
COORDINATE ROUTING
WP
2-EC-8
LINE OF MEZZANINE
2-EC
E
1/4"=1'-0"
PARTIAL FLOOR PLAN - ELECTRICAL1
E2.0
N O
R T
H
DS
DS DS
F
DS
ELECTRICAL EQUIPMENT
LOCATED ON MEZZANINE
GENERAL NOTES:
1. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO REFERENCE
CURRENT EDITION OF THE NATIONAL ELECTRICAL CODE
FOR CONDUIT FILL FOR THE EXACT TYPE OF CONDUCTOR
BEING INSTALLED AND SIZE THE CONDUIT AS REQUIRED BY
CODE.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO VERIFY
VOLTAGE DROP FOR EXACT ROUTING AND LENGTH OF ALL
CONDUCTORS.
3. VERIFY AND CONFIRM ALL DIMENSIONS AND CONDITIONS
PRIOR TO START OF WORK. NOTIFY ARCHITECT OF ANY
DISCREPANCIES PRIOR TO START OF WORK.
4. MECHANICAL UNITS HEAVY DUTY DISCONNECTS WILL BE
MOUNTED STRUCTURALLY AND INDEPENDENT OF THE
MECHANICAL UNITS.
5. ELECTRICAL DEDICATED SPACES: NO PIPING, DUCTS,
EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE
PERMITTED WITHIN THE DEDICATED SPACE ABOVE THE
ELECTRICAL EQUIPMENT.
6. SEE MECHANICAL DRAWINGS AND DETAILS FOR
ADDITIONAL ELECTRICAL EQUIPMENT CONNECTION,
INFORMATION AND CLARIFICATIONS. PROVIDE ALL LABOR
AND MATERIAL INCLUDING BUT NOT BE LIMITED TO
CONDUIT, SUPPORTS, CONDUCTORS, AND JUNCTION
BOXES, CONNECT COMPLETE.
7. FIRE / SMOKE DAMPERS (SD/FLD) DUCT DETECTORS:
ADDRESSABLE DETECTORS WITH INTEGRAL CONTACTS
WILL BE PROVIDED BY DIV 28, INSTALLED BY DIV 23, POWER
WIRING BY DIV 26 AND CONTROL WIRING BY DIV 28.
PROVIDE POWER AND FA CONTROL CONNECTION TO EACH
FIRE / SMOKE DAMPERS. (SD/FLD). ELECTRICAL
CONTRACTOR WILL PROVIDE A 120 VOLT CONNECTION
ADJACENT EACH SD/FLD AND CONNECT. NO MORE THAN
FIVE (5) DAMPERS ON A DEDICATED CIRCUIT WITH HLO.
SEE MECHANICAL PLANS FOR LOCATIONS OF FIRE
DAMPERS (SD/FLD) AND SHAFT LOCATIONS. CONNECT ALL
DUCT DETECTORS IN DUCTS TO FIRE DAMPERS AND FIRE
ALARM PANEL AS REQUIRED. PROVIDE ALL LABOR AND
MATERIAL INCLUDING BUT NOT BE LIMITED TO CONDUIT,
SUPPORTS, CONDUCTORS, AND JUNCTION BOXES,
CONNECT COMPLETE.
8. DEVICE LOCATIONS ARE APPROXIMATE. SPACE PER NFPA
72 AND AS APPROVED BY THE ARCHITECT.
E2.0
JFR
FLOOR PLAN -
ELECTRICAL
REVISIONS:
ISSUE DATE:
SDC JOB #:
DESIGNED BY:
CHECKED BY:
DRAWN BY:
SET TYPE:
R
EX
P U
TN
A
M H
IG
H
S C
H O
O L
C H
IL
LE
R R
EP
LA
C
EM
EN
T
N O
R
TH
C
LA
C K
A M
A S
SC
H
O O
L D
IS
T.
S E
R O
ET
H
E R
D M
IL
W
A U
K
IE
, O R
EG
O
N
SYSTEM DESIGN CONSULTANTS INC.
333 SE SECOND AVE
SUITE 100
PORTLAND OR
97214
503-248-0227
NCS2401
12/24/2024
BID ADDENDUM #1
01/16/2025
JJD
JJD
O EH
18197
OREGON
C.ED 5991,6
ENGI REEN
N F R A GRKN
LA
NOISSEFORPDE
R
RETSIGE
EXPIRES 12/31/26
O RJ S
CONTACT: JEFFREY DAVIS
File details come from the government source that posted it. Updated .