Rev E2.0 - FP New.pdf

PDF 230 KB Posted

Attached to
ITB-2425-111 Rex Putnam High School Chiller Replacement Project
Solicitation number
S-P03012-00012402
Issued by
Clackamas County, Oregon

About this file

This is an electrical floor plan (drawing E2.0) for the Rex Putnam High School Chiller Replacement Project in Clackamas County, Oregon. The drawing shows a partial floor plan at 1/4"=1'-0" scale depicting the boiler room (G31), storage room (G32), team room (G26), coaches room (G25), and an outdoor chiller courtyard with maintenance access area. The plan details the locations of key mechanical equipment including heat exchangers, boilers (Boiler-1 and Boiler-2), hot water storage tank, and various pumps (HWP-1, HWP-2, CHWP-1) with their associated VFD controllers.

The drawing includes technical details for electrical equipment installation, with specific notes about verifying connection locations with equipment suppliers prior to rough-in and sealing around conduits. Electrical equipment is shown located on a mezzanine level, and the plan includes coordinate routing instructions and general notes regarding electrical contractor requirements. The drawing appears to be part of a larger set of construction documents, indicated by the professional engineering stamp and revision information in the title block.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HWP-1

HEAT EXCHANGER /

BOILER-1

BOILER-2

HW STORAGE TANK

CHWP-1

EECC

TEAM ROOM

G26

COACHES

G25

BOILER

ROOM

G31

STORAGE

G32

HWP-2

OUTDOOR

CHILLER

COURTYARD

MAINTENANCE

ACCESS AREA

CH-1

C-B

N

LINE OF MEZZANINE

SD-EN

E

V F

D

F

F

(P-13)

(SMALL PUMP)

(P-12)

VFD - CHWP-1

(P-13)

VFD - HWP-2

SMALL PUMP

VFD - HWP-1

(P-12)

V F

D

V F

D

VERIFY CONNECTION LOCATION

WITH EQUIPMENT SUPPLIER,

PRIOR TO ROUGH-IN

SEAL AROUND CONDUITS,

COORDINATE ROUTING

WP

2-EC-8

LINE OF MEZZANINE

2-EC

E

1/4"=1'-0"

PARTIAL FLOOR PLAN - ELECTRICAL1

E2.0

N O

R T

H

DS

DS DS

F

DS

ELECTRICAL EQUIPMENT

LOCATED ON MEZZANINE

GENERAL NOTES:

1. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO REFERENCE

CURRENT EDITION OF THE NATIONAL ELECTRICAL CODE

FOR CONDUIT FILL FOR THE EXACT TYPE OF CONDUCTOR

BEING INSTALLED AND SIZE THE CONDUIT AS REQUIRED BY

CODE.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO VERIFY

VOLTAGE DROP FOR EXACT ROUTING AND LENGTH OF ALL

CONDUCTORS.

3. VERIFY AND CONFIRM ALL DIMENSIONS AND CONDITIONS

PRIOR TO START OF WORK. NOTIFY ARCHITECT OF ANY

DISCREPANCIES PRIOR TO START OF WORK.

4. MECHANICAL UNITS HEAVY DUTY DISCONNECTS WILL BE

MOUNTED STRUCTURALLY AND INDEPENDENT OF THE

MECHANICAL UNITS.

5. ELECTRICAL DEDICATED SPACES: NO PIPING, DUCTS,

EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE

PERMITTED WITHIN THE DEDICATED SPACE ABOVE THE

ELECTRICAL EQUIPMENT.

6. SEE MECHANICAL DRAWINGS AND DETAILS FOR

ADDITIONAL ELECTRICAL EQUIPMENT CONNECTION,

INFORMATION AND CLARIFICATIONS. PROVIDE ALL LABOR

AND MATERIAL INCLUDING BUT NOT BE LIMITED TO

CONDUIT, SUPPORTS, CONDUCTORS, AND JUNCTION

BOXES, CONNECT COMPLETE.

7. FIRE / SMOKE DAMPERS (SD/FLD) DUCT DETECTORS:

ADDRESSABLE DETECTORS WITH INTEGRAL CONTACTS

WILL BE PROVIDED BY DIV 28, INSTALLED BY DIV 23, POWER

WIRING BY DIV 26 AND CONTROL WIRING BY DIV 28.

PROVIDE POWER AND FA CONTROL CONNECTION TO EACH

FIRE / SMOKE DAMPERS. (SD/FLD). ELECTRICAL

CONTRACTOR WILL PROVIDE A 120 VOLT CONNECTION

ADJACENT EACH SD/FLD AND CONNECT. NO MORE THAN

FIVE (5) DAMPERS ON A DEDICATED CIRCUIT WITH HLO.

SEE MECHANICAL PLANS FOR LOCATIONS OF FIRE

DAMPERS (SD/FLD) AND SHAFT LOCATIONS. CONNECT ALL

DUCT DETECTORS IN DUCTS TO FIRE DAMPERS AND FIRE

ALARM PANEL AS REQUIRED. PROVIDE ALL LABOR AND

MATERIAL INCLUDING BUT NOT BE LIMITED TO CONDUIT,

SUPPORTS, CONDUCTORS, AND JUNCTION BOXES,

CONNECT COMPLETE.

8. DEVICE LOCATIONS ARE APPROXIMATE. SPACE PER NFPA

72 AND AS APPROVED BY THE ARCHITECT.

E2.0

JFR

FLOOR PLAN -

ELECTRICAL

REVISIONS:

ISSUE DATE:

SDC JOB #:

DESIGNED BY:

CHECKED BY:

DRAWN BY:

SET TYPE:

R

EX

P U

TN

A

M H

IG

H

S C

H O

O L

C H

IL

LE

R R

EP

LA

C

EM

EN

T

N O

R

TH

C

LA

C K

A M

A S

SC

H

O O

L D

IS

T.

S E

R O

ET

H

E R

D M

IL

W

A U

K

IE

, O R

EG

O

N

SYSTEM DESIGN CONSULTANTS INC.

333 SE SECOND AVE

SUITE 100

PORTLAND OR

97214

503-248-0227

NCS2401

12/24/2024

BID ADDENDUM #1

01/16/2025

JJD

JJD

O EH

18197

OREGON

C.ED 5991,6

ENGI REEN

N F R A GRKN

LA

NOISSEFORPDE

R

RETSIGE

EXPIRES 12/31/26

O RJ S

CONTACT: JEFFREY DAVIS

File details come from the government source that posted it. Updated .