Rev E0.0 - FP Notes - Riser.pdf
PDF 169 KB Posted
- Solicitation number
- S-P03012-00012402
- Issued by
- Clackamas County, Oregon
About this file
This is an electrical schedule and demolition scope document for the Rex Putnam High School Chiller Replacement Project in Clackamas County, Oregon. The document details the mechanical equipment connection schedule for both existing and new equipment, including chillers, cooling pumps, heat circulation pumps, and associated electrical components. The scope involves removing existing chillers and selected pumps, along with their associated electrical infrastructure including conduit, conductors, junction boxes and supports.
The technical specifications include voltage requirements of 480V with 3-phase power for all equipment, load requirements ranging from 7.5 to 224 MCA/HP/FLA, and detailed electrical modifications such as replacing circuit breakers and providing new fused disconnects. Key electrical upgrades include removing existing 350A-3P & 500A-3P breakers and installing new 800A-3P circuit breakers, providing new 700 amp fuses for the new chiller in an 800A, 600V, heavy-duty NEMA 3R disconnect, and various smaller breaker replacements. The document includes detailed demolition instructions and general notes regarding code compliance, voltage drop verification, and coordination requirements between electrical, mechanical, and fire protection contractors.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL EQUIPMENT CONNECTION SCHEDULE
Designation
EXISTING
C-A
C-B
P-13
P-12
SP
NEW
CH-1
CHWP-1
HWP-1
HWP-2
General Notes :
Schedule Notes :
Description
Chiller (ex)
Chiller (ex)
Cooling Pump (exist)
Heat Circ Pump (exist)
Small Pump (exist)
Chilled Water
Chilled Water (P-13)
Heat HW (P-12)
Heat HW (Small Pump)
Provide conduit for all feeders, size as required per the current adopted edition of the NEC for conductors shown. Route from unit to panel designated
Coordinate exact locations and equipment connections with mechanical contractor and other trades prior to rough-in
Coordinate electrical requirements and installation with equipment supplier prior to rough-in
Provide insulated ground wire in all conduits not shown in conductor quantity
Connect addressable duct detectors provided by Div. 28, installed by Div. 23 and wired by Div. 26
Connect to motor starters or VFD's provided by Div. 23, installed and wired by Div. 26
Electrical contractor to verify voltage drop for actual lengths installed
SD-EA, Siemens, Type S4, S4E75ML800EBS
4EN, Siemens, Type S5, S5E75ML101ABS
Existing wire sizes are based on overcurrent protection and conduit quantity, contractor to field verify.
Provide Heavy Duty HACR Disconnect Switch for mechanical equipment. Coordinate location with equipment installer.
Disconnect will be independently mounted from equipment. WP for outdoor units
Remove existing 350A-3P & 500A-3P from 4EN, Provide new 800A-3P C/B
Provide new 700 amp fuses for new chiller in new 800A, 600v, HD NEMA 3R disconnect
Remove existing 40A-3P C/B, Provide new 30A-3P C/B
Remove existing 100A-3P C/B, Provide new 15A-3P C/B
Remove existing 20A-3P C/B, Provide new 15A-3P C/B
Remove existing starter, Provide electrical connection for new VFD, provided by Div 23, installed by Div 26. Route feeder through VFD connect complete
Provide all labor and material including but not be limited to conductors, conduit, support and junction boxes.
Remove existing VFD, Provide electrical connection for new VFD, provided by Div 23, installed by Div 26. Route feeder through VFD connect complete
Provide all labor and material including but not be limited to conductors, conduit, support and junction boxes.
Voltage
Ph
Load
7.5
23.2
11.34
9.55
Kw/Hp/Amp
MCA
MCA
HP
HP
HP
MCA
FLA
FLA
FLA
Coil
(kW) MOCP
Panel
4EN
4EN
SD-EA
SD-EA
SD-EA
4EN
SD-EA
SD-EA
SD-EA
Circuit
Qty
Feeder (CU ONLY)
Size
3#2/0, 1#3G
3#4/0, 1#3G
3#8, 1#8G
3#1, 1#6G
3#12, 1#12G
3#350, 1#1/0G
3#8, 1#8G
3#12, 1#12G
3#12, 1#12G
Conduit
Exist
Exist
Exist
Exist
Exist
3"C
Exist
3/4"
Exist
Notes
1,3,4
2,5,8
2,6,8
2,7,9
Voltage Drop
Dist
VD%
0.3%
0.4%
0.5%
0.3%
DEMOLITION SCOPE OF WORK:
SCOPE: THE SCOPE OF WORK INCLUDES THE REMOVAL OF
THE EXISTING CHILLER AND SELECTED PUMPS. THE WORK
WILL INCLUDE BUT NOT BE LIMITED TO DEMOLITION (SEE
BELOW) OF THE POWER, AND MECHANICAL EQUIPMENT
INCLUDING BUT NOT BE LIMITED TO CONDUIT, CONDUCTORS,
JUNCTION BOXES AND SUPPORTS. THE DEMOLITION OF
MECHANICAL EQUIPMENT WILL BE BY OTHERS, THE
ELECTRICAL CONTRACTOR WILL DISCONNECT THE
EQUIPMENT PRIOR TO REMOVAL.
DEMOLITION: ELECTRICAL DRAWINGS ARE DIAGRAMMATIC,
DEMOLITION INFORMATION HAS BEEN LISTED ON THE
CONSTRUCTION DRAWINGS, IN THE SPECIFICATIONS OR
INDICATED BELOW. ELECTRICAL DEVICES AND EQUIPMENT
ARE FROM PICTURES, EXISTING RECORD DRAWINGS AND / OR
SITE OBSERVATIONS. THEIR ACCURACY IS NOT GUARANTEED.
IT SHALL BE THE ELECTRICAL CONTRACTORS RESPONSIBILITY
TO VISIT THE SITE PRIOR TO BID AND VERIFY ALL EXISTING
CONDITIONS AND INCLUDE ALL LABOR AND MATERIAL
REQUIRED FOR THE WORK INDICATED IN THE CONSTRUCTION
SET.
THE PURPOSE OF THE DEMOLITION INFORMATION IS TO
OUTLINE A GENERAL DIRECTION OF WHAT NEEDS TO BE
REMOVED TO ACCOMPLISH THE RENOVATION WORK. THE
WORK IS DIAGRAMMATIC IN NATURE AND IS NOT INTENDED TO
BE ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE TO
VERIFY EXISTING CONDITIONS AT THE SITE AND INCLUDE ALL
WORK EVIDENT BY SITE INSPECTION WHETHER OR NOT
SHOWN ON THE DRAWINGS, TO ACHIEVE THE DESIRED
RESULTS INDICATED ON THE DOCUMENTS FOR THE FINISHED
SPACES.
POWER - EXISTING POWER DEVICES WILL BE REMOVED
UNLESS NOTED OTHERWISE ON DRAWINGS. REMOVE DEVICES
AND ASSOCIATED CIRCUITING INCLUDING BUT NOT BE
LIMITED TO CONDUIT, CONDUCTORS, AND SUPPORTS BACK TO
PANEL.
MECHANICAL - SEE MECHANICAL DRAWINGS FOR DEMOLITION
OF EXISTING MECHANICAL EQUIPMENT.
MECHANICAL DEMOLITION - ELECTRICAL CONTRACTOR WILL
DISCONNECT THE POWER AND ASSOCIATED CIRCUITING
INCLUDING BUT NOT BE LIMITED TO CONDUIT, CONDUCTORS,
AND SUPPORTS BACK TO PANEL
GENERAL NOTES:
1. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO REFERENCE
CURRENT EDITION OF THE NATIONAL ELECTRICAL CODE
FOR CONDUIT FILL FOR THE EXACT TYPE OF CONDUCTOR
BEING INSTALLED AND SIZE THE CONDUIT AS REQUIRED BY
CODE.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO VERIFY
VOLTAGE DROP FOR EXACT ROUTING AND LENGTH OF ALL
CONDUCTORS.
3. VERIFY AND CONFIRM ALL DIMENSIONS AND CONDITIONS
PRIOR TO START OF WORK. NOTIFY ARCHITECT OF ANY
DISCREPANCIES PRIOR TO START OF WORK.
4. MECHANICAL UNITS HEAVY DUTY DISCONNECTS WILL BE
MOUNTED STRUCTURALLY AND INDEPENDENT OF THE
MECHANICAL UNITS.
5. ELECTRICAL DEDICATED SPACES: NO PIPING, DUCTS,
EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE
PERMITTED WITHIN THE DEDICATED SPACE ABOVE THE
ELECTRICAL EQUIPMENT.
6. SEE MECHANICAL DRAWINGS AND DETAILS FOR
ADDITIONAL ELECTRICAL EQUIPMENT CONNECTION,
INFORMATION AND CLARIFICATIONS. PROVIDE ALL LABOR
AND MATERIAL INCLUDING BUT NOT BE LIMITED TO
CONDUIT, SUPPORTS, CONDUCTORS, AND JUNCTION
BOXES, CONNECT COMPLETE.
7. FIRE / SMOKE DAMPERS (SD/FLD) DUCT DETECTORS:
ADDRESSABLE DETECTORS WITH INTEGRAL CONTACTS
WILL BE PROVIDED BY DIV 28, INSTALLED BY DIV 23, POWER
WIRING BY DIV 26 AND CONTROL WIRING BY DIV 28.
PROVIDE POWER AND FA CONTROL CONNECTION TO EACH
FIRE / SMOKE DAMPERS. (SD/FLD). ELECTRICAL
CONTRACTOR WILL PROVIDE A 120 VOLT CONNECTION
ADJACENT EACH SD/FLD AND CONNECT. NO MORE THAN
FIVE (5) DAMPERS ON A DEDICATED CIRCUIT WITH HLO.
SEE MECHANICAL PLANS FOR LOCATIONS OF FIRE
DAMPERS (SD/FLD) AND SHAFT LOCATIONS. CONNECT ALL
DUCT DETECTORS IN DUCTS TO FIRE DAMPERS AND FIRE
ALARM PANEL AS REQUIRED. PROVIDE ALL LABOR AND
MATERIAL INCLUDING BUT NOT BE LIMITED TO CONDUIT,
SUPPORTS, CONDUCTORS, AND JUNCTION BOXES,
CONNECT COMPLETE.
8. DEVICE LOCATIONS ARE APPROXIMATE. SPACE PER NFPA
72 AND AS APPROVED BY THE ARCHITECT.
DISCONNECT
400A
A
P
A
SD-EN 4EN
P
A
P
A
DISCONNECT
600A
CHILLER
E
X
X
X
X
X
X X
X
X
X
EXISTING CHEILLER - ELECTRICAL - DEMO
E0.0
P
A
SD-EN
DISCONNECT
800A
CHILLER
E
EXISTING CHEILLER - ELECTRICAL
E0.0
X
FUSED
(NEW)
700A FUSES
NEMA 3R
EXTERIORINTERIOR
EXTERIORINTERIOR
REVISIONS:
ISSUE DATE:
SDC JOB #:
DESIGNED BY:
CHECKED BY:
DRAWN BY:
SET TYPE:
R
EX
P U
TN
A
M H
IG
H
S C
H O
O L
C H
IL
LE
R R
EP
LA
C
EM
EN
T
N O
R
TH
C
LA
C K
A M
A S
SC
H
O O
L D
IS
T.
S E
R O
ET
H
E R
D M
IL
W
A U
K
IE
, O R
EG
O
N
SYSTEM DESIGN CONSULTANTS INC.
333 SE SECOND AVE
SUITE 100
PORTLAND OR
97214
503-248-0227
NCS2401
12/24/2024
BID ADDENDUM #1
01/16/2025
O EH
18197
OREGON
C.ED 5991,6
ENGI REEN
N F R A GRKN
LA
NOISSEFORPDE
R
RETSIGE
EXPIRES 12/31/26
O RJ S
E0.0
JFR
ELECTRICAL
SCHEDULE & NOTES
JJD
JJD
CONTACT: JEFFREY DAVIS
File details come from the government source that posted it. Updated .