Rev M0.01 - Mechanical Schedules & Details.pdf

PDF 996 KB Posted

Attached to
ITB-2425-111 Rex Putnam High School Chiller Replacement Project
Solicitation number
S-P03012-00012402
Issued by
Clackamas County, Oregon

About this file

This mechanical schedules and details document is part of the Rex Putnam High School Chiller Replacement Project in Clackamas County, Oregon. The document contains detailed technical drawings and specifications for the chiller system installation, including mechanical legends, pump schedules, and control diagrams for the heating water pump, air cooled chiller, and chilled water pump systems.

The drawing sheet (M0.1) provides comprehensive mechanical details showing base mounted and inline mounted pump configurations, along with their associated control diagrams. A chiller schedule and pump schedule are included, specifying equipment parameters and performance requirements. The mechanical legend defines symbols for various components including heating/cooling supply lines, valves, thermostats, and control elements. Detailed control diagram symbols and abbreviations are also provided to ensure proper interpretation of the technical drawings.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .