About this file

This is a project summary document for a stormwater infrastructure improvement initiative involving Volusia County's Office of Recovery and Resiliency in Florida. The project encompasses the construction of comprehensive stormwater management improvements along Corbin Park Road and interconnected local roadways in New Smyrna Beach, including installation of storm drainage pipes ranging from 12 to 48 inches in diameter, storm structures, inlets, manholes, utility relocations, and pavement restoration across approximately 8,600 linear feet. The non-mandatory pre-bid meeting is scheduled for December 1, 2025, at 3:00 pm with a virtual attendance option via Microsoft Teams. Potential bidders must submit questions electronically through the County's eProcurement Portal by December 9, 2025, at 11:59 pm, with bid submissions due by December 23, 2025, at 3:01 pm. The project has a substantial completion period of 600 days, with final completion required 30 days thereafter.

The estimated total construction cost is $8,451,220, and the contract will be awarded to the lowest responsive and responsible bidder. The project is funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR), intended to aid in Volusia County's recovery from Hurricane Ian damage sustained in September 2022. Federal labor standards are stringently enforced, including Davis-Bacon Act prevailing wage requirements and Copeland Act anti-kickback provisions requiring weekly certified payroll reporting. Section 3 and Minority/Women-Owned Business Enterprise (M/WBE) participation requirements mandate that 25 percent of total labor hours be performed by Section 3 workers and 5 percent by Targeted Section 3 workers. Bidders must provide a 5 percent bid bond and obtain Payment and Performance Bonds equal to 100 percent of the contract price, register with E-Verify, and maintain comprehensive insurance coverage. Liquidated damages are established at $3,813 per day for delays beyond the substantial completion date.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Project_Sign.pdf PDF
Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
Corbin_Park_-_Bid_Form.xlsx XLSX spreadsheet
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRENGTHENING VOLUSIA’S FUTURE

TRANSFORM386

Working together to improve the resilience of our communities.

Daytona Beach Lift Station 15 Replacement Total Transform386 Funding: $1,925,000.00

Total Project Cost: $2,616,500.00

File details come from the government source that posted it. Updated .