Exhibit_N_-_HEAVY_Wage_Determination.pdf

PDF 2 MB Posted

Attached to
CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction
Solicitation number
26-B-20KW
Issued by
Volusia County, Florida

About this file

This is a Heavy Wage Determination exhibit prepared by the U.S. Department of Labor for the City of New Smyrna Beach Corbin Park Stormwater Improvements Construction project in Volusia County, Florida, a CDBG-DR funded initiative. The document establishes prevailing wage rates applicable to laborers and mechanics employed on this federally assisted construction project in accordance with the Davis-Bacon Act. The project involves stormwater management infrastructure improvements including installation of storm drainage pipes ranging from 12 to 48 inches in diameter, storm structures, inlets, and manholes across approximately 8,600 linear feet of Corbin Park Road and interconnected local roadways. The non-mandatory pre-bid meeting is scheduled for December 1, 2025, at 3:00 pm with virtual attendance available via Microsoft Teams. Bidders must submit questions electronically through the County's eProcurement Portal by December 9, 2025, at 11:59 pm, with bid submissions due December 23, 2025, at 3:01 pm. The project requires substantial completion within 600 days with final completion 30 days thereafter.

The wage determination establishes the minimum hourly rates that must be paid to workers on this project, enforced under federal labor standards. The estimated total construction cost is $8,451,220, to be awarded to the lowest responsive and responsible bidder. Contractors must comply with Section 3 requirements, allocating 25 percent of total labor hours to Section 3 workers and 5 percent to Targeted Section 3 workers. A 5 percent bid bond is required, along with Payment and Performance Bonds equal to 100 percent of the contract price. Additional mandatory requirements include E-Verify registration, comprehensive insurance coverage, weekly certified payroll reporting, and Copeland Act anti-kickback compliance. Liquidated damages are assessed at $3,813 per day for delays beyond the substantial completion date, with the prime contractor held responsible for wage compliance enforcement and potential liability for wage restitution throughout the project duration.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Project_Sign.pdf PDF
Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
Corbin_Park_-_Bid_Form.xlsx XLSX spreadsheet
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .