This scope of work document pertains to the City of New Smyrna Beach's Corbin Park Stormwater Improvements Construction project, which is being managed by Volusia County's Office of Recovery and Resiliency in partnership with HUD. The project encompasses extensive drainage infrastructure improvements including the installation of several thousand feet of conveyance pipe, numerous inlet structures, manholes, treatment swales, and outfall structures equipped with backflow preventors. The scope also includes required utility relocates and roadway replacement necessary to support the drainage system installation. The design and permitting phase is expected to conclude by December 2024, with a three-year construction period commencing in spring 2025.
This project is funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR) to aid Volusia County's recovery from Hurricane Ian damage sustained in September 2022. As a federally assisted project, it is subject to Federal Labor Standards including the Davis-Bacon Act prevailing wage requirements and the Copeland Act anti-kickback provisions. Contractors and subcontractors must comply with weekly certified payroll report submissions, bonding requirements under 24 CFR 85.36, and Section 3 and Minority/Women-Owned Business Enterprise (M/WBE) provisions. The prime contractor is responsible for enforcing wage compliance and maintaining supporting documentation throughout the project duration and may be held liable for wage restitution non-compliance.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The project entails installation of extensive drainage improvements including several thousand feet of conveyance pipe, numerous inlet structures and manholes to redirect the stormwater away from properties as well as treatment swales, additional outfall structures equipped with backflow preventors along with the required utility relocates and roadway replacement needed to install the drainage improvements. The design and permitting expected phase to be completed by December 2024. With a 3-year construction commencing in the spring of 2025.