Bid_Price_Sheet.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction
Solicitation number
26-B-20KW
Issued by
Volusia County, Florida

About this file

Bid Price Sheet Summary

This is a bid price sheet for construction services submitted to Volusia County's Office of Recovery and Resiliency on behalf of the City of New Smyrna Beach for the Corbin Park Stormwater Improvements project. The project encompasses comprehensive stormwater infrastructure improvements funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR) to aid recovery from Hurricane Ian damage. The scope of work is organized into four primary parts: General Requirements including mobilization, survey, public meetings, and site preparation; Paving and Driveway Restoration involving removal and replacement of various surface types totaling approximately 10,700 linear feet of restoration work; Stormwater System improvements including demolition and installation of pipes, inlets, manholes, and flap gate valves across multiple sizes; and Utility Improvements due to stormwater installation requiring transitions, insertion valves, wet taps, and water main installations. The project contains 81 line items with specified quantities, plus five bid alternates for optional work including excavatable flowable fill and linestop services of varying diameters.

The bid price sheet establishes pricing on a unit price basis with line item quantities specified for competitive bidding. The total contract price submitted is $130,000.00, comprised of $50,000.00 for General Requirements, $30,000.00 for Paving and Driveway Restoration, $0 for Stormwater System items (indicating prices to be determined), and $50,000.00 for Utility Improvements. The project is subject to Federal Labor Standards including the Davis-Bacon Act requiring prevailing wage rates, the Copeland Act requiring anti-kickback compliance and weekly certified payroll reporting, and federal bonding requirements under 24 CFR 85.36. Section 3 and Minority/Women Business Enterprise (M/WBE) provisions apply to this federally assisted project, and the prime contractor is responsible for wage compliance enforcement and supporting documentation throughout construction.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Project_Sign.pdf PDF
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
Corbin_Park_-_Bid_Form.xlsx XLSX spreadsheet
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Corbin Park - Bid Form

EXHIBIT F - BID PRICE SHEET
26-B-20KW, NEW SMYRNA BEACH CORBIN PARK STORMWATER IMPROVEMENTS
FIRM NAME
PART A: GENERAL REQUIREMENTS
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
GENERAL REQUIREMENTS
1Mobilization and Demobilization (Maximum 5.0% of the total Contract Price)1LS$ - 0
2General Requirements, Bonds, and Permits1LS$ - 0
3Indemnification1LS$ - 0
4Maintenance of Traffic1LS$ - 0
5Layout Survey, Utility Locates, and As-Built Survey1LS$ - 0
6Semi-Annual Public Meetings6EA$ - 0
7Clearing and Grubbing1LS$ - 0
8Erosion Control and Stormwater Pollution Prevention1LS$ - 0
9Utility Clearance1LS$ - 0
10Civil Allowance1ALL$ 50,000.00$ 50,000.00
Subtotal Part A: General Requirements$ 50,000.00

BID FORM

PART B: PAVING & DRIVEWAY RESTORATION

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
PAVING AND DRIVEWAY RESTORATION
11Remove and Replace Gravel Driveway160SY$ - 0
12Remove and Replace Concrete Driveway2,200SY$ - 0
13Remove and Replace Brick/Stamped Driveway150SY$ - 0
14Remove and Replace Ribbon Curb4,810LF$ - 0
15Remove and Replace Drop Curb110LF$ - 0
16Remove and Replace Asphalt Pavement – City Right-of-Way330SY$ - 0
17Remove and Replace Asphalt Pavement – County Right-of-Way3,510SY$ - 0
18Mill and Resurface – City Right-of-Way230SY$ - 0
19Mill and Resurface – County Right-of-Way4,310SY$ - 0
20Remove and Replace Shell Road130SY$ - 0
21Restoration10,700LF$ - 0
22Geotechnical/Material Testing1ALL$ 30,000.00$ 30,000.00
Subtotal Part B: Paving and Driveway Restoration$ 30,000.00

BID FORM

PART C: STORMWATER SYSTEM

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
STORMWATER SYSTEM
23Inlet Demolition12EA$ - 0
24Mitered End Section (MES) Demolition6EA$ - 0
2518" Headwall Demolition2EA$ - 0
2612" Pipe Demolition350LF$ - 0
2718"x12" Pipe Demoltion140LF$ - 0
2823"x14" Pipe Demoltion270LF$ - 0
2915" Pipe Demolition670LF$ - 0
3018" Pipe Demolition820LF$ - 0
3124" Pipe Demolition500LF$ - 0
3218" Pipe Grout Fill and Abandon140LF$ - 0
33Type 'C' Inlet23EA$ - 0
34Type 'E' Inlet45EA$ - 0
35Type 'G' Inlet42EA$ - 0
36Type 'H' Inlet1EA$ - 0
3712" Mitered End Section (MES)7EA$ - 0
3815" Mitered End Section (MES)3EA$ - 0
3918" Mitered End Section (MES)1EA$ - 0
4015" Concrete Endwall3EA$ - 0
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
41Storm Manhole (4' Diameter)1EA$ - 0
42Storm Manhole (5' Diameter)4EA$ - 0
4312" PVC Storm170LF$ - 0
4412" RCP Storm60LF$ - 0
4515" RCP Storm520LF$ - 0
4618" RCP Storm1,390LF$ - 0
4724" RCP Storm6,560LF$ - 0
4836" RCP Storm5,610LF$ - 0
4948" RCP Storm60LF$ - 0
5018" Corrugated Plastic Pipe (CPP)20LF$ - 0
5118"x12" ERCP130LF$ - 0
5223"x14" ERCP60LF$ - 0
5330"x19" ERCP600LF$ - 0
5438"x24" ERCP80LF$ - 0
5524-inch Flap Gate Valve1EA$ - 0
5636-inch Flap Gate Valve2EA$ - 0
5748-inch Flap Gate Valve1EA$ - 0
Subtotal Part C: Stormwater System$ - 0

BID FORM

PART D: UTILITY IMPROVEMENTS DUE TO STORMWATER INSTALLATION

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
UTILITY IMPROVEMENTS DUE TO STORMWATER INSTALLATION
58Cut and Cap, Abandon 6" Water Main, Grout and Fill100LF$ - 0
59Vertical Transition – 4” PVC Force Main
(Includes Fittings)3EA$ - 0
60Horizontal Transition – 4” PVC Force Main
(Includes Fittings)1EA$ - 0
61Vertical Transition – 6” PVC Water Main
(Includes Fittings)9EA$ - 0
62Horizontal Transition – 6” PVC Water Main
(Includes Fittings)5EA$ - 0
63Vertical Transition – 8” PVC Water Main
(Includes Fittings)16EA$ - 0
64Horizontal Transition – 8” PVC Water Main
(Includes Fittings)6EA$ - 0
65Vertical Transition – 8” PVC Force Main
(Includes Fittings)2EA$ - 0
66Vertical Transition – 12” PVC Water Main
(Includes Fittings)2EA$ - 0
67Horizontal Transition – 12” PVC Water Main
(Includes Fittings)1EA$ - 0
68Vertical Transition – 20” PVC Water Main
(Includes Fittings)2EA$ - 0
69Vertical Transition – 20” PVC Reclaimed Water Main
(Includes Fittings)1EA$ - 0
706" Insertion Valve2EA$ - 0
718" Insertion Valve3EA$ - 0
7212" Insertion Valve3EA$ - 0
7320" Insertion Valve4EA$ - 0
746”x8” Wet Tap and Valve2EA$ - 0
754” Plug Valve1EA$ - 0
761” Water Service – Short Side6EA$ - 0
771” Water Service – Long Side6EA$ - 0
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
786” PVC Water Main (Includes Fittings)390LF$ - 0
798” PVC Water Main (Includes Fittings)170LF$ - 0
804” PVC Force Main (Includes Fittings)1,060LF$ - 0
81Fire Hydrant Assembly1EA$ - 0
82Utility Allowance1ALL$ 50,000.00$ 50,000.00
Subtotal Part D: Utility Improvements Due to Stormwater Installation$ 50,000.00

SUMMARY OF COSTS

Subtotal Part A: General Requirements$ 50,000.00
Subtotal Part B: Paving and Driveway Restoration$ 30,000.00
Subtotal Part C: Stormwater System$ - 0
Subtotal Part D: Utility Improvements Due to Stormwater Installation$ 50,000.00
Payment and Performance Bond$ - 0
Total Price (Inclusive of Performance and Payment Bond)$ 130,000.00
Bid Alternates
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
ALT-1Excavatable Flowable Fill40CY$ - 0
ALT-26" Linestop2EA$ - 0
ALT-38" Linestop3EA$ - 0
ALT-412" Linestop3EA$ - 0
ALT-520" Linestop4EA$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; EA= Each

File details come from the government source that posted it. Updated .