Exhibit_B_-_Prime_Sub_Form.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-20KW
- Issued by
- Volusia County, Florida
About this file
This is an Exhibit B Prime/Subcontractor Form for Volusia County, Florida's CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction project, issued under ITB No. 26-B-20KW with Contract No. C-2059. The form requires bidders to identify all proposed subcontractors for the construction project and specify the dollar value and percentage of work each entity will perform. The project involves stormwater improvements for the City of New Smyrna Beach as part of Hurricane Ian disaster recovery efforts. Bidders must complete the form and return it with their bid submission, as failure to do so may result in a non-responsive bid designation. The anticipated subcontractor disciplines include landscaping/sod, asphalt paving, concrete placement, underground utility/stormwater construction, erosion control/silt fence, site grading and earthwork, temporary traffic control, and dewatering, among others.
The form requires bidders to allocate all bid pricing across the prime contractor and subcontractors, with the total bid amount matching the amount submitted on Exhibit F—Bid Price Sheet. All monetary entries and work percentages must be completed in the green-shaded cells, while other cells auto-calculate to ensure the total work allocation equals 100 percent. The prime contractor bears responsibility for ensuring all subcontractors hold appropriate licenses and must obtain prior approval from the County Project Manager for any subcontractor changes during project execution. The County will not permit changes to the total submitted base bid pricing. This federally funded project is subject to Davis-Bacon Act prevailing wage requirements, Copeland Act anti-kickback provisions, bonding requirements under 24 CFR 85.36, and Section 3 and Minority/Women-Owned Business Enterprise (M/WBE) compliance. The form will also be used to determine local preference scoring in accordance with the solicitation requirements.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2059 | ITB No. 26-B-20KW | ||||
| EXHIBIT B - PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit F - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| Landscaping/Sod | $ - 0 | 0.00% | ||||
| Asphalt Paving | $ - 0 | 0.00% | ||||
| Concrete Placement | $ - 0 | 0.00% | ||||
| Underground Utility/Stormwater Construction | $ - 0 | 0.00% | ||||
| Erosiion Control/Silt Fence | $ - 0 | 0.00% | ||||
| Site Grading and Earthwork | $ - 0 | 0.00% | ||||
| Temporary Traffic Control | $ - 0 | 0.00% | ||||
| Dewatering | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .