Project_Sign.pdf

PDF 420 KB Posted

Attached to
CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction
Solicitation number
26-B-20KW
Issued by
Volusia County, Florida

About this file

This is a project description document for Volusia County's Office of Recovery and Resiliency involving the Daytona Beach Lift Station 15 Replacement, a federally-funded infrastructure improvement project. The project is part of Volusia County's recovery efforts following Hurricane Ian damage in September 2022. The construction work involves replacing a critical wastewater lift station, with specific construction services and materials required to complete the facility upgrade.

The project is funded through a Community Development Block Grant for Disaster Recovery (CDBG-DR) from the U.S. Department of Housing and Urban Development (HUD), with total project costs of $2,616,500.00 and Transform386 funding allocated at $1,925,000.00. As a federally-assisted project, the work is subject to Davis-Bacon Act prevailing wage requirements, Copeland Act anti-kickback provisions, bonding requirements under 24 CFR 85.36, and Section 3 and Minority/Women-Owned Business Enterprise (M/WBE) compliance. The prime contractor is responsible for enforcing wage compliance throughout the project duration and maintaining support documentation, with potential liability for wage restitution if violations occur.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
Corbin_Park_-_Bid_Form.xlsx XLSX spreadsheet
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRENGTHENING VOLUSIA’S FUTURE

TRANSFORM386

Working together to improve the resilience of our communities.

Daytona Beach Lift Station 15 Replacement Total Transform386 Funding: $1,925,000.00

Total Project Cost: $2,616,500.00

File details come from the government source that posted it. Updated .