CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction
Solicitation number
26-B-20KW
Issued by
Volusia County, Florida

About this file

Bid Price Sheet Summary

This is a bid price sheet for the CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction project, a federally-funded infrastructure initiative managed by Volusia County's Office of Recovery and Resiliency and the City of New Smyrna Beach. The project encompasses comprehensive stormwater system improvements including installation of storm drainage pipes (12 to 48 inches in diameter), storm structures, inlets, and manholes; utility relocations and transitions for water mains and force mains; and pavement restoration across approximately 8,600 linear feet of Corbin Park Road and interconnected local roadways. The scope of work is divided into four primary parts: General Requirements (including mobilization, bonds, permits, and traffic maintenance), Paving and Driveway Restoration (covering 2,200 square yards of concrete driveway removal and replacement, 8,120 linear feet of curb work, and 8,040 square yards of asphalt pavement work), Stormwater System installation (featuring extensive pipe work ranging from 12 to 48 inches in diameter totaling over 15,000 linear feet, inlet and manhole installation, and three flap gate valves), and Utility Improvements (including water main transitions, insertion valves, and water service installations). The non-mandatory pre-bid meeting was scheduled for December 1, 2025, at 3:00 pm with virtual options available. Bid submissions were due December 23, 2025, at 3:01 pm, with a substantial completion period of 600 days plus 30 days for final completion.

The bid price sheet establishes a total contract price of $130,000.00, comprised of $50,000.00 for General Requirements, $30,000.00 for Paving and Driveway Restoration, $0 for Stormwater System items (bidders must provide unit pricing), and $50,000.00 for Utility Improvements, with all amounts inclusive of Payment and Performance Bonds. The estimated total construction cost for the project is $8,451,220. All bidders must comply with Davis-Bacon Act prevailing wage requirements and federal labor standards, including Section 3 compliance requiring 25 percent of total labor hours performed by Section 3 workers and 5 percent by Targeted Section 3 workers. Contractors are required to provide a 5 percent bid bond and obtain Payment and Performance Bonds equal to 100 percent of the contract price. The project is funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR) to support recovery from Hurricane Ian damage sustained in September 2022. Bid alternates are included for Excavatable Flowable Fill, and various Linestop sizes (6, 8, 12, and 20 inches). Liquidated damages are assessed at $3,813 per day for delays beyond the substantial completion date, and the contract will be awarded to the lowest responsive and responsible bidder.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Project_Sign.pdf PDF
Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
Corbin_Park_-_Bid_Form.xlsx XLSX spreadsheet
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Corbin Park - Bid Form

EXHIBIT F - BID PRICE SHEET
26-B-20KW, NEW SMYRNA BEACH CORBIN PARK STORMWATER IMPROVEMENTS
FIRM NAME
PART A: GENERAL REQUIREMENTS
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
GENERAL REQUIREMENTS
1Mobilization and Demobilization (Maximum 5.0% of the total Contract Price)1LS$ - 0
2General Requirements, Bonds, and Permits1LS$ - 0
3Indemnification1LS$ - 0
4Maintenance of Traffic1LS$ - 0
5Layout Survey, Utility Locates, and As-Built Survey1LS$ - 0
6Semi-Annual Public Meetings6EA$ - 0
7Clearing and Grubbing1LS$ - 0
8Erosion Control and Stormwater Pollution Prevention1LS$ - 0
9Utility Clearance1LS$ - 0
10Civil Allowance1ALL$ 50,000.00$ 50,000.00
Subtotal Part A: General Requirements$ 50,000.00

BID FORM

PART B: PAVING & DRIVEWAY RESTORATION

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
PAVING AND DRIVEWAY RESTORATION
11Remove and Replace Gravel Driveway160SY$ - 0
12Remove and Replace Concrete Driveway2,200SY$ - 0
13Remove and Replace Brick/Stamped Driveway150SY$ - 0
14Remove and Replace Ribbon Curb4,810LF$ - 0
15Remove and Replace Drop Curb110LF$ - 0
16Remove and Replace Asphalt Pavement – City Right-of-Way330SY$ - 0
17Remove and Replace Asphalt Pavement – County Right-of-Way3,510SY$ - 0
18Mill and Resurface – City Right-of-Way230SY$ - 0
19Mill and Resurface – County Right-of-Way4,310SY$ - 0
20Remove and Replace Shell Road130SY$ - 0
21Restoration10,700LF$ - 0
22Geotechnical/Material Testing1ALL$ 30,000.00$ 30,000.00
Subtotal Part B: Paving and Driveway Restoration$ 30,000.00

BID FORM

PART C: STORMWATER SYSTEM

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
STORMWATER SYSTEM
23Inlet Demolition12EA$ - 0
24Mitered End Section (MES) Demolition6EA$ - 0
2518" Headwall Demolition2EA$ - 0
2612" Pipe Demolition350LF$ - 0
2718"x12" Pipe Demoltion140LF$ - 0
2823"x14" Pipe Demoltion270LF$ - 0
2915" Pipe Demolition670LF$ - 0
3018" Pipe Demolition820LF$ - 0
3124" Pipe Demolition500LF$ - 0
3218" Pipe Grout Fill and Abandon140LF$ - 0
33Type 'C' Inlet23EA$ - 0
34Type 'E' Inlet45EA$ - 0
35Type 'G' Inlet42EA$ - 0
36Type 'H' Inlet1EA$ - 0
3712" Mitered End Section (MES)7EA$ - 0
3815" Mitered End Section (MES)3EA$ - 0
3918" Mitered End Section (MES)1EA$ - 0
4015" Concrete Endwall3EA$ - 0
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
41Storm Manhole (4' Diameter)1EA$ - 0
42Storm Manhole (5' Diameter)4EA$ - 0
4312" PVC Storm170LF$ - 0
4412" RCP Storm60LF$ - 0
4515" RCP Storm520LF$ - 0
4618" RCP Storm1,390LF$ - 0
4724" RCP Storm6,560LF$ - 0
4836" RCP Storm5,610LF$ - 0
4948" RCP Storm60LF$ - 0
5018" Corrugated Plastic Pipe (CPP)20LF$ - 0
5118"x12" ERCP130LF$ - 0
5223"x14" ERCP60LF$ - 0
5330"x19" ERCP600LF$ - 0
5438"x24" ERCP80LF$ - 0
5524-inch Flap Gate Valve1EA$ - 0
5636-inch Flap Gate Valve2EA$ - 0
5748-inch Flap Gate Valve1EA$ - 0
Subtotal Part C: Stormwater System$ - 0

BID FORM

PART D: UTILITY IMPROVEMENTS DUE TO STORMWATER INSTALLATION

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
UTILITY IMPROVEMENTS DUE TO STORMWATER INSTALLATION
58Cut and Cap, Abandon 6" Water Main, Grout and Fill100LF$ - 0
59Vertical Transition – 4” PVC Force Main
(Includes Fittings)3EA$ - 0
60Horizontal Transition – 4” PVC Force Main
(Includes Fittings)1EA$ - 0
61Vertical Transition – 6” PVC Water Main
(Includes Fittings)9EA$ - 0
62Horizontal Transition – 6” PVC Water Main
(Includes Fittings)5EA$ - 0
63Vertical Transition – 8” PVC Water Main
(Includes Fittings)16EA$ - 0
64Horizontal Transition – 8” PVC Water Main
(Includes Fittings)6EA$ - 0
65Vertical Transition – 8” PVC Force Main
(Includes Fittings)2EA$ - 0
66Vertical Transition – 12” PVC Water Main
(Includes Fittings)2EA$ - 0
67Horizontal Transition – 12” PVC Water Main
(Includes Fittings)1EA$ - 0
68Vertical Transition – 20” PVC Water Main
(Includes Fittings)2EA$ - 0
69Vertical Transition – 20” PVC Reclaimed Water Main
(Includes Fittings)1EA$ - 0
706" Insertion Valve2EA$ - 0
718" Insertion Valve3EA$ - 0
7212" Insertion Valve3EA$ - 0
7320" Insertion Valve4EA$ - 0
746”x8” Wet Tap and Valve2EA$ - 0
754” Plug Valve1EA$ - 0
761” Water Service – Short Side6EA$ - 0
771” Water Service – Long Side6EA$ - 0
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
786” PVC Water Main (Includes Fittings)390LF$ - 0
798” PVC Water Main (Includes Fittings)170LF$ - 0
804” PVC Force Main (Includes Fittings)1,060LF$ - 0
81Fire Hydrant Assembly1EA$ - 0
82Utility Allowance1ALL$ 50,000.00$ 50,000.00
Subtotal Part D: Utility Improvements Due to Stormwater Installation$ 50,000.00

SUMMARY OF COSTS

Subtotal Part A: General Requirements$ 50,000.00
Subtotal Part B: Paving and Driveway Restoration$ 30,000.00
Subtotal Part C: Stormwater System$ - 0
Subtotal Part D: Utility Improvements Due to Stormwater Installation$ 50,000.00
Payment and Performance Bond
Total Price (Inclusive of Performance and Payment Bond)$ 130,000.00
Bid Alternates
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
ALT-1Excavatable Flowable Fill40CY$ - 0
ALT-26" Linestop2EA$ - 0
ALT-38" Linestop3EA$ - 0
ALT-412" Linestop3EA$ - 0
ALT-520" Linestop4EA$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; EA= Each