Corbin_Park_-_Bid_Form.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction
Solicitation number
26-B-20KW
Issued by
Volusia County, Florida

About this file

This is a bid form for construction services related to the City of New Smyrna Beach's Corbin Park stormwater improvements project, administered by Volusia County's Office of Recovery and Resiliency as a CDBG-DR funded recovery effort from Hurricane Ian damage. The project encompasses four primary scope categories: general requirements including mobilization, permits, traffic maintenance, and surveys; paving and driveway restoration involving removal and replacement of various surface types across 10,700 linear feet and multiple square yard quantities; stormwater system installation including demolition and installation of pipes ranging from 12 inches to 48 inches in diameter, inlet systems, endwalls, manholes, and flap gate valves; and utility improvements necessitated by stormwater installation, including water main transitions, insertion valves, wet taps, and water service connections across multiple pipe diameters. The bid form does not specify response deadlines, site visit requirements, bidder conferences, or award dates.

The bid form reflects a total contract value of $130,100.00, composed of Part A General Requirements at $50,100.00, Part B Paving and Driveway Restoration at $30,000.00, Part C Stormwater System at $0.00 (pricing to be supplied by bidder), and Part D Utility Improvements at $50,000.00. Specific line items include fixed allowances for Civil Allowance ($50,000.00) and Utility Allowance ($50,000.00), with all other items requiring unit pricing from bidders. The bid form includes four optional bid alternates for excavatable flowable fill and linestop services at various diameters. As a federally funded project under HUD's CDBG-DR program, the contract is subject to Davis-Bacon Act prevailing wage requirements, Copeland Act anti-kickback provisions, federal bonding requirements under 24 CFR 85.36, and Section 3 and M/WBE compliance provisions. The prime contractor bears responsibility for wage compliance enforcement and documentation throughout the project duration.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Project_Sign.pdf PDF
Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Corbin Park - Bid Form

BID FORM

PART A: GENERAL REQUIREMENTS

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
GENERAL REQUIREMENTS
1Mobilization and Demobilization (Maximum 5.0% of the total Contract Price)1LS$ - 0
2General Requirements, Bonds, and Permits1LS$ - 0
3Indemnification1LS$ 100.00$ 100.00
4Maintenance of Traffic1LS$ - 0
5Layout Survey, Utility Locates, and As-Built Survey1LS$ - 0
6Semi-Annual Public Meetings6EA$ - 0
7Clearing and Grubbing1LS$ - 0
8Erosion Control and Stormwater Pollution Prevention1LS$ - 0
9Utility Clearance1LS$ - 0
10Civil Allowance1ALL$ 50,000.00$ 50,000.00
Subtotal Part A: General Requirements$ 50,100.00

BID FORM

PART B: PAVING & DRIVEWAY RESTORATION

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
PAVING AND DRIVEWAY RESTORATION
11Remove and Replace Gravel Driveway160SY$ - 0
12Remove and Replace Concrete Driveway2,200SY$ - 0
13Remove and Replace Brick/Stamped Driveway150SY$ - 0
14Remove and Replace Ribbon Curb4,810LF$ - 0
15Remove and Replace Drop Curb110LF$ - 0
16Remove and Replace Asphalt Pavement – City Right-of-Way330SY$ - 0
17Remove and Replace Asphalt Pavement – County Right-of-Way3,510SY$ - 0
18Mill and Resurface – City Right-of-Way230SY$ - 0
19Mill and Resurface – County Right-of-Way4,310SY$ - 0
20Remove and Replace Shell Road130SY$ - 0
21Restoration10,700LF$ - 0
22Geotechnical/Material Testing1ALL$ 30,000.00$ 30,000.00
Subtotal Part B: Paving and Driveway Restoration$ 30,000.00

BID FORM

PART C: STORMWATER SYSTEM

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
STORMWATER SYSTEM
23Inlet Demolition12EA$ - 0
24Mitered End Section (MES) Demolition6EA$ - 0
2518" Headwall Demolition2EA$ - 0
2612" Pipe Demolition350LF$ - 0
2718"x12" Pipe Demoltion140LF$ - 0
2823"x14" Pipe Demoltion270LF$ - 0
2915" Pipe Demolition670LF$ - 0
3018" Pipe Demolition820LF$ - 0
3124" Pipe Demolition500LF$ - 0
3218" Pipe Grout Fill and Abandon140LF$ - 0
33Type 'C' Inlet23EA$ - 0
34Type 'E' Inlet45EA$ - 0
35Type 'G' Inlet42EA$ - 0
36Type 'H' Inlet1EA$ - 0
3712" Mitered End Section (MES)7EA$ - 0
3815" Mitered End Section (MES)3EA$ - 0
3918" Mitered End Section (MES)1EA$ - 0
4015" Concrete Endwall3EA$ - 0
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
41Storm Manhole (4' Diameter)1EA$ - 0
42Storm Manhole (5' Diameter)4EA$ - 0
4312" PVC Storm170LF$ - 0
4412" RCP Storm60LF$ - 0
4515" RCP Storm520LF$ - 0
4618" RCP Storm1,390LF$ - 0
4724" RCP Storm6,560LF$ - 0
4836" RCP Storm5,610LF$ - 0
4948" RCP Storm60LF$ - 0
5018" Corrugated Plastic Pipe (CPP)20LF$ - 0
5118"x12" ERCP130LF$ - 0
5223"x14" ERCP60LF$ - 0
5330"x19" ERCP600LF$ - 0
5438"x24" ERCP80LF$ - 0
5524-inch Flap Gate Valve1EA$ - 0
5636-inch Flap Gate Valve2EA$ - 0
5748-inch Flap Gate Valve1EA$ - 0
Subtotal Part C: Stormwater System$ - 0

BID FORM

PART D: UTILITY IMPROVEMENTS DUE TO STORMWATER INSTALLATION

ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
UTILITY IMPROVEMENTS DUE TO STORMWATER INSTALLATION
58Cut and Cap, Abandon 6" Water Main, Grout and Fill100LF$ - 0
59Vertical Transition – 4” PVC Force Main
(Includes Fittings)3EA$ - 0
60Horizontal Transition – 4” PVC Force Main
(Includes Fittings)1EA$ - 0
61Vertical Transition – 6” PVC Water Main
(Includes Fittings)9EA$ - 0
62Horizontal Transition – 6” PVC Water Main
(Includes Fittings)5EA$ - 0
63Vertical Transition – 8” PVC Water Main
(Includes Fittings)16EA$ - 0
64Horizontal Transition – 8” PVC Water Main
(Includes Fittings)6EA$ - 0
65Vertical Transition – 8” PVC Force Main
(Includes Fittings)2EA$ - 0
66Vertical Transition – 12” PVC Water Main
(Includes Fittings)2EA$ - 0
67Horizontal Transition – 12” PVC Water Main
(Includes Fittings)1EA$ - 0
68Vertical Transition – 20” PVC Water Main
(Includes Fittings)2EA$ - 0
69Vertical Transition – 20” PVC Reclaimed Water Main
(Includes Fittings)1EA$ - 0
706" Insertion Valve2EA$ - 0
718" Insertion Valve3EA$ - 0
7212" Insertion Valve3EA$ - 0
7320" Insertion Valve4EA$ - 0
746”x8” Wet Tap and Valve2EA$ - 0
754” Plug Valve1EA$ - 0
761” Water Service – Short Side6EA$ - 0
771” Water Service – Long Side6EA$ - 0
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
786” PVC Water Main (Includes Fittings)390LF$ - 0
798” PVC Water Main (Includes Fittings)170LF$ - 0
804” PVC Force Main (Includes Fittings)1,060LF$ - 0
81Fire Hydrant Assembly1EA$ - 0
82Utility Allowance1ALL$ 50,000.00$ 50,000.00
Subtotal Part D: Utility Improvements Due to Stormwater Installation$ 50,000.00

SUMMARY OF COSTS

Subtotal Part A: General Requirements$ 50,100.00
Subtotal Part B: Paving and Driveway Restoration$ 30,000.00
Subtotal Part C: Stormwater System$ - 0
Subtotal Part D: Utility Improvements Due to Stormwater Installation$ 50,000.00
Total Cost$ 130,100.00
Total Bid (Use Words)
Total Bid (Figures)
Bid Alternates
ItemItem Name & CategoryTotal QuantityUnitUnit PriceItem Price
ALT-1Excavatable Flowable Fill40CY$ - 0
ALT-26" Linestop2EA$ - 0
ALT-38" Linestop3EA$ - 0
ALT-412" Linestop3EA$ - 0
ALT-520" Linestop4EA$ - 0

File details come from the government source that posted it. Updated .