This is a bid drawings document for the Phase 1 Rockefeller Campus Forestry project, prepared for the City of Cleveland's Mayor's Office of Capital Projects (MOCAP) in Ohio. The drawings provide technical specifications and design details for the forestry-related improvements at the Rockefeller Greenhouse Campus, which is part of a larger capital project managed by MOCAP's Division of Architecture and Site Development. The project encompasses three distinct components: a Traditional Design-Build for the Rockefeller Greenhouse Admin Building, Forestry Garage, and Historic Brick Garage (Project 1); a Traditional Design-Build for the Rockefeller Main Greenhouse General Improvements (Project 2); and a Progressive Design Build project for solar glazing installation on the Main Greenhouse with a project allowance (Project 3). The bid drawings document serves as a critical reference for qualified Construction Management at Risk Team Partners submitting proposals, establishing the baseline design and technical requirements for competitive bidding.
The bid drawings establish the scope of work and technical specifications necessary for contractors to develop accurate cost estimates and implementation plans for the forestry components of the overall campus improvement initiative. These drawings are essential to the RFP process, ensuring all bidders have access to consistent design information and can provide comparable proposals. The project is funded through the City of Cleveland's Capital Improvement Plan (CIP) and administered by MOCAP with oversight from the Division of Architecture and Site Development, which emphasizes sustainable design and technical excellence. Contractors responding to this opportunity must review the bid drawings in conjunction with all other project documentation, including the scope of work, project descriptions, and supporting exhibits, to develop comprehensive proposals that address both the design and construction requirements for the designated forestry and greenhouse campus improvements.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B C D E F
OCCUPANCY CLASSIFICATIONS CHAPTER 3 U, UTILITY AND MISCELLANEOUS - BARN (UNCHANGED)
ALLOWABLE HEIGHT, STORIES CHAPTER 5 EXISTING CONSTRUCTION (SECTION 504, UNCHANGED)
ALLOWABLE AREA CHAPTER 5 EXISTING CONSTRUCTION (SECTION 506, UNCHANGED)
TYPE OF CONSTRUCTION CHAPTER 6 II-B, EXISTING CONSTRUCTION (UNCHANGED)
FIRE PROETECTION CHAPTER 9 WITHOUT SPRINKLER SYSTEM (UNCHANGED)
OCCUPANT LOAD CHAPTER 10 SECTION 1004
OCCUPANCIES TABLE 1004.1.2
ACCESSORY STORAGE 300 SF GROSS/OCCUPANT FIRST FLOOR 8,400 SF/ 300 = 28 OCCUPANTS
TOTAL CALCULATED OCCUPANT LOAD = 28 OCCUPANTS
TOTAL ACTUAL OCCUPANT LOAD = 0 OCCUPANTS
EXIT ACCESS TRAVEL DISTANCE CHAPTER 10 300FT - WITHOUT SPRINKLER SYSTEM (TABLE 1017.2)
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d O
H
-1
P h o n e
-2
F a x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
THE CITY OF CLEVELAND
Rockefeller Greenhouse Campus Renovation
750 E 88TH STREET
CLEVELAND, OHIO 44108
DEPARTMENT OF PUBLIC WORKS
MAY0R'S OFFICE OF CAPITAL PROJECTS
JUSTIN M. BIBB, MAYOR
CITY OF CLEVELAND
BLAINE A. GRIFFIN, COUNCIL PRESIDENT
CLEVELAND CITY COUNCIL
ANTHONY T HAIRSTON, COUNCIL MEMBER
CLEVELAND CITY COUNCIL
FRANK D. WILLIAMS, DIRECTOR
DEPARTMENT OF PUBLIC WORKS
ARCHITECT:
Division of Architecture and Site Development
Telephone: (216) 664-2374
Email: jmestnik@Clevelandohio.gov
Contact Person: Joe Mestnik, RA
ARCHITECT:
IKM Architecture
Knight & Stolar (landscape)
Finley Consulting Group (exterior envelope)
Mongomery Smith (greenhouse)
Telephone: (878) 999-2284
Email: ayaracs@ikminc.com
Contact Person: Adam Yaracs, AIA
BUILDING DEPARTMENT:
Chief Building Official, Thomas Vanover
Telephone: (216) 664-2282
Email: TVonover@Clevelandohio.gov
Contact Person: TBD
FIRE MARSHALL:
Captain David Telban
Telephone: (216) 664-6867
Email: Dtelban@Clevelandohio.gov
Call to schedule inspections
MECHANICAL, ELECTREICAL
AND PLUMBING ENGINEER:
Algebra AEC
Telephone: (248) 227-5542
Email: Shariq@algebraaec.com
Contact Person: Shariq Ali
STRUCTURAL AND CIVIL ENGINEER:
Osborn Engineering
Telephone: (216) 861-2020
Email: jpollner@osborn-eng.com dwatkins@osborn-eng.com
Contact Person: John Pollner (Structure)
David Watkins (Civil)
SHEET INDEX
BUILDING PLAN
LOCATION MAP
BUILDING CODE SUMMARY
JAMES D. DEROSA, DIRECTOR
MAYOR'S OFFICE OF CAPITAL PROJECTS
N/A
IKM, Inc
URBAN FORESTRY MAINTENANCE GARAGE
/2
/2
:4
:2
A
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d
R o c k e fe lle r
G re e n h o u s e R
/2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
R
.r v t
A0
URBAN FORESTRY
MAINTENANCE GARAGE
COVER SHEET
Adam Yaracs
Ty Juan Swanson-Sawyer
-0
R o c k e fe ll e r P a rk
G re e n h o u s e
C a m p u s
U rb a n
F o re s tr y M a in te n a n c e
G a ra g e E a s t th
S tr e e t
C le v e la n d
ARCHITECTURAL - FORESTRY MAINTENANCE
P E
R M
IT
/B
ID
S
E T
S H
E E
T N
U M
B E
R
SHEET NAME
● A0 URBAN FORESTRY MAINTENANCE GARAGE COVER SHEET
● AL100 FORESTRY GARAGE LIFE SAFETY PLAN
● A200 FORESTRY GARAGE FIRST FLOOR PLAN
● A201 FORESTRY GARAGE ROOF PLAN
● A400 FORESTRY GARAGE EXTERIOR ELEVATIONS
NORTH
ELECTRICAL
P E
R M
IT
/B
ID
S
E T
S H
E E
T N
U M
B E
R
SHEET NAME
● GE001 GENERAL ELECTRICAL, TECHNOLOGY, FIRE ALARM
● E101 FIRST FLOOR ELECTRICAL PLAN
MECHANICAL
P E
R M
IT
/B
ID
S
E T
S H
E E
T N
U M
B E
R
SHEET NAME
● GM001 GENERAL MECHANICAL
● M100 UNDERGROUND MECHANICAL
● M101 FIRST FLOOR MECHANICAL PLAN
NORTH
MARK DATE DESCRIPTION
01.05.2026 PERMIT/BID SET
4'
126'
1 HOUR FIRE BARRIER
EXIT SIGNS ( DIRECTIONAL ARROW)
SPRINKLERS
LIFE SAFETY PLAN LEGEND
SYMBOL DESCRIPTION
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
FIRE EXTINGUISHER
HORN
STROBE
MANUAL PULL STATION
FIRE ALARM CONTROL PANEL
SMOKE DETECTOR, CEILING MOUNTED
FE
FACP
PD
F
F
F
TRAVEL DISTANCE
ARCHITECTURAL PROJECT AREA
C D E FBA
EXISTING URBAN
FORESTRY
MAINTANENCE
GARAGE
8041 SF / 300 GRS
27 OCC.
EXISTING
WORKROOM
324 SF / 300 GRS
2 OCC.
POINT A
EXIT 1
4 CLOSET
30 SF / -
1 OCC.
C D E FBA
CODE INFORMATION:
PROJECT INTENT:
THE PROJECT INTENT IS TO COMPLETE MINOR MODIFICATIONS OF THE CITY OF CLEVELAND ROCKEFELLER FORESTRY BARN. THE INTENT IS TO LIMIT PRIMARY WORK TO THE PROJECT AREAS AS DEFINED BY THE CONSTRUCTION DOCUMENTS, WITH NO CHANGES IN THE USE, CONSTRUCTION, OR OCCUPANCY. NEW WORK PERFORMED SHALL COMPLY WITH CURRENT BUILDING CODES AND REGULATIONS, HOWEVER, THE PROJECT INTENT IS NOT TO BRING ALL STRUCTURES INTO COMPLIANCE WITH CURRENT BUILDING CODES WHERE NO NEW WORK IS BEING PERFORMED. THIS WORK INVOLVES ADDING GUTTERS, DOWNSPOUTS, AND A BACKUP GENERATOR AND DOES NOT
INTEND TO ADD OCCUPANT LOAD.
PROJECT SCOPE:
THE PROJECT SHALL BE LIMITED TO ALTERATION WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. ALTERATION WORK AND IMPROVEMENTS WITHIN THE PROJECT AREA MAY INCLUDE, BUT SHALL NOT BE LIMITED TO THE FOLLOWING SYSTEMS: HVAC, PLUMBING, FIRE SUPPRESSION, FIRE ALARM, NORMAL POWER, EMERGENCY POWER, DATA AND COMMUNICATION, LIGHTING, INTERIOR PARTITIONS, DOORS AND HARDWARE, AND INTERIOR FINISHES.
OCCUPANCY CLASSIFICATIONS CHAPTER 3 U, UTILITY AND MISCELLANEOUS - BARN (UNCHANGED)
ALLOWABLE HEIGHT, STORIES CHAPTER 5 EXISTING CONSTRUCTION (SECTION 504, UNCHANGED)
ALLOWABLE AREA CHAPTER 5 EXISTING CONSTRUCTION (SECTION 506, UNCHANGED)
TYPE OF CONSTRUCTION CHAPTER 6 II-B, EXISTING CONSTRUCTION (UNCHANGED)
FIRE PROETECTION CHAPTER 9 WITHOUT SPRINKLER SYSTEM (UNCHANGED)
OCCUPANT LOAD CHAPTER 10 SECTION 1004
OCCUPANCIES TABLE 1004.1.2
ACCESSORY STORAGE 300 SF GROSS/OCCUPANT FIRST FLOOR 8,400 SF/ 300 = 28 OCCUPANTS
TOTAL CALCULATED OCCUPANT LOAD = 28 OCCUPANTS
TOTAL ACTUAL OCCUPANT LOAD = 0 OCCUPANTS
EXIT ACCESS TRAVEL DISTANCE CHAPTER 10 300FT - WITHOUT SPRINKLER SYSTEM (TABLE 1017.2)
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
Project North True North
/2
/2
:4
:2
A
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d
R o c k e fe lle r
G re e n h o u s e R
/2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
R
.r v t
As indicated
AL100
FORESTRY GARAGE LIFE
SAFETY PLAN
Adam Yaracs
Ty Juan Swanson-Sawyer
IKM, Inc
-0
R o c k e fe ll e r
P a rk G re e n h o u s e
C a m p u s
U rb a n
F o re s tr y M a in te n a n c e
G a ra g e E a s t th
S tr e e t
C le v e la n d
TRAVEL DISTANCE
START POINT DISTANCE EXIT NUMBER
A 126' 1
STATE: OHIO
OHIO BUILDING CODE 2017 (INTERNATIONAL BUILDING CODE 2015 WITH OHIO AMENDMENTS)
• ICC/ANSI A117.1-2009 WITH AMENDMENTS
• EXISTING BUILDING CODE CHAPTER 34
OHIO ENERGY CODE 2017 (INTERNATIONAL ENERGY CONSERVATION CODE 2012/ASHRAE 90.1-2010 WITH OHIO
AMENDMENTS)
OHIO MECHANICAL CODE 2017 (INTERNATIONAL MECHANICAL CODE 2015 WITH OHIO AMENDMENTS)
OHIO PLUMBING CODE 2017 (INTERNATIONAL PLUMBING CODE 2015 WITH OHIO AMENDMENTS)
APPLICABLE CODES:
A L
1/8" = 1'-0"1 FIRST FLOOR LIFE SAFETY
C D E FBA A400
A400
EXISTINGTRENCH DRAIN EXISTING TRENCH DRAIN
23' - 6" +/- 24' - 0" +/- 24' - 0" +/- 24' - 0" +/- 23' - 6" +/-
119' - 0" +/-
7' - 8"
4'
" 9' - 4"
5'
NEW GENERATOR ON NEW CONCRETE PAD.
REFERENCE ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION
ARCHITECTURAL SCOPE OF WORK
ARCHITECTURAL SCOPE OF WORK
ARCHITECTURAL SCOPE OF WORK
A400
8041 SF
FORESTRY
GARAGE
324 SF
STORAGE
C D E FBA
REMOVE EXISTING HEATER UNIT AND
PROVIDE NEW HEATER UNIT. REMOVE
EXISTING ROOF VENTS AND PATCH AND
REPAIR ROOF. REFERENCE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
REMOVE EXISTING HEATER UNIT AND
PROVIDE NEW HEATER UNIT. REMOVE
EXISTING ROOF VENTS AND PATCH AND
REPAIR ROOF. REFERENCE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
REMOVE EXISTING HEATER UNIT AND
PROVIDE NEW HEATER UNIT. REMOVE
EXISTING ROOF VENTS AND PATCH AND
REPAIR ROOF. REFERENCE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
REMOVE EXISTING HEATER UNIT AND
PROVIDE NEW HEATER UNIT. REMOVE
EXISTING ROOF VENTS AND PATCH AND
REPAIR ROOF. REFERENCE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING PARTITION
DOOR - KEYED TO DOOR SCHEDULE
FLOOR PLAN LEGEND
ARCHITECTURAL PROJECT AREA
1 HOUR
2 HOUR
SMOKE
1.1A CODED NOTE - REFER TO SHEET A001
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
Project North True North
/2
/2
:4
:2
A
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d
R o c k e fe lle r
G re e n h o u s e R
/2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
R
.r v t
As indicated
A200
FORESTRY GARAGE FIRST
FLOOR PLAN
Adam Yaracs
Ty Juan Swanson-Sawyer
IKM, Inc
-0
R o c k e fe ll e r
P a rk G re e n h o u s e
C a m p u s
U rb a n
F o re s tr y M a in te n a n c e
G a ra g e E a s t th
S tr e e t
C le v e la n d
A
3/16" = 1'-0"1 FIRST FLOOR PLAN
C D E FBA A400
A400
3/
4"
1' -0
3/ 4"
1'
-0
3/
4"
1' -0
3/ 4"
1'
-0
3/
4"
1' -0
3/ 4"
1'
-0
EXISTING CLEAR POLYCARBONATE
PANEL INFILL TO REMAIN, TYP
23' - 6" +/- 24' - 0" +/- 24' - 0" +/- 24' - 0" +/- 23' - 6" +/-
119' - 0" +/-
A400
A400
ARCHITECTURAL SCOPE OF WORK
ARCHITECTURAL SCOPE OF WORK
C D E FBA
NEW GUTTERS AND DOWNSPOUTS
NEW GUTTERS AND DOWNSPOUTS
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
Project North True North
/2
/2
:4
:2
A
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d
R o c k e fe lle r
G re e n h o u s e R
/2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
R
.r v t
3/16" = 1'-0"
A201
FORESTRY GARAGE ROOF
PLAN
Adam Yaracs
Ty Juan Swanson-Sawyer
IKM, Inc
-0
R o c k e fe ll e r
P a rk G re e n h o u s e
C a m p u s
U rb a n
F o re s tr y M a in te n a n c e
G a ra g e E a s t th
S tr e e t
C le v e la n d
A
3/16" = 1'-0"1 ROOF PLAN
LEVEL 1 - EQUIPMENT BARN
0"
CDEF B A
NEW BOX GUTTER. SLOPE TOWARD
CLOSEST DOWNSPOUT.
NEW DOWNSPOUT. SEE PLUMBING
DRAWINGS FOR LOCATIONS AND SIZING NEW DOWNSPOUT. SEE PLUMBING
DRAWINGS FOR LOCATIONS AND SIZING
15' - 2" 30' - 0" 15' - 6"
PROVIDE NEW DOWNSPOUT BOOT AT
LOCATION OF EXISTING DOWNSPOUT TIE-IN
TO STORM
PROVIDE NEW DOWNSPOUT BOOT AT
LOCATION OF EXISTING DOWNSPOUT TIE-IN
TO STORM
PROVIDE NEW DOWNSPOUT BOOT AT
LOCATION OF EXISTING DOWNSPOUT TIE-IN
TO STORM
SLOPE SLOPE SLOPE SLOPE
NEW BOX GUTTER. SLOPE TOWARD
CLOSEST DOWNSPOUT.
/4
NEW DOWNSPOUT. SEE PLUMBING
DRAWINGS FOR LOCATIONS AND SIZING
A400
EXISTING CLEAR
POLYCARBONATE PANEL
INFILL TO REMAIN, TYP.
EXISTING METAL STANDING SEAM
ROOF TO REMAIN. PATCH AND
REPAIR ROOF WHERE EXISTING
ROOF VENTS WERE REMOVED.
EXISTING METAL SIDING
TO REMAIN, TYP.
LEVEL 1 - EQUIPMENT BARN
0"
C D E FBA
NEW BOX GUTTER. SLOPE
TOWARD CLOSEST DOWNSPOUTS.
NEW DOWNSPOUT. SEE PLUMBING
DRAWINGS FOR LOCATIONS AND SIZING
A400
NEW DOWNSPOUT. SEE PLUMBING
DRAWINGS FOR LOCATIONS AND SIZING
15' - 6"30' - 0"
PROVIDE NEW DOWNSPOUT BOOT AT
LOCATION OF EXISTING DOWNSPOUT TIE-IN
TO STORM
PROVIDE NEW DOWNSPOUT BOOT AT
LOCATION OF EXISTING DOWNSPOUT TIE-IN
TO STORM
SLOPE
NEW BOX GUTTER. SLOPE
TOWARD CLOSEST DOWNSPOUTS.
SLOPE SLOPE
EXISTING CLEAR
POLYCARBONATE PANEL
INFILL TO REMAIN, TYP.
EXISTING METAL STANDING SEAM
ROOF TO REMAIN. PATCH AND
REPAIR ROOF WHERE EXISTING
ROOF VENTS WERE REMOVED.
EXISTING METAL SIDING
TO REMAIN, TYP.
EXISTING CORRUGATED METAL
ROOF AND STRUCTURE TO REMAIN
NEW 7" BOX GUTTER, SLOPED TO
NEAREST DOWNSPOUT. CONFIRM
COLOR WITH ARCHITECT.
NEW 4" DOWNSPOUT TO BE TIED
INTO EXISTING STORM SYSTEM.
SEE ELEVATION FOR LOCATIONS.
EXISTING CORRUGATED METAL
SIDING TO REMAIN.
2 1/8" +/-
LOWER BOX GUTTER TO
BELOW ROOF LINE TO
PREVENT ICE BUILD UP.
FLASHING TO MATCH BOX GUTTER
ANCHOR GUTTER TO
EXISITNG EAVE STRUT
6" LINE OF EQUIPMENT MODULE 6"
M
IN
V
A R
IE
S
6" M
IN
#4 BARS @ 12" O.C.
NEW COMPACTED AGGREGATE BASE
1" CHAMFER
1" x 2" SHEER KEY
3000 PSI CONCRETE
#5 BAR
#5 BAR
#5 BENT BARS @ 12" O.C.
12" WIDE CONCRETE FOOTING.
EXTEND MINIMUM 36" BELOW GRADE.
NOTES:
1. CONCRETE SHALL BE 4000 PSI FOR 28 DAYS (MINIMUM).
2. EQUIPMENT ANCHORS: CONTRACTOR TO COORDINATE WITH EQUIPMENT
MANUFACTURER FOR LOCATIONS OF HURRICANE TIE-DOWN ANCHORS TO BE CAST
INTO NEW CONCRETE FOUNDATION FOR EQUIPMENT. ANCHORAGE TO BE DESIGNED
TO WITHSTAND WINDS UP TO 110 MPH OR AS REQUIRED BY LOCAL CODES.
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
/2
/2
:4
:2
A
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d
R o c k e fe lle r
G re e n h o u s e R
/2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
R
.r v t
As indicated
A400
FORESTRY GARAGE
EXTERIOR ELEVATIONS
Adam Yaracs
Ty Juan Swanson-Sawyer
IKM, Inc
-0
R o c k e fe ll e r
P a rk G re e n h o u s e
C a m p u s
U rb a n
F o re s tr y M a in te n a n c e
G a ra g e E a s t th
S tr e e t
C le v e la n d
BUILDING ELEVATION
A
3/16" = 1'-0"1 WEST
BUILDING ELEVATION
A
3/16" = 1'-0"2 EAST
DETAIL
A
1 1/2" = 1'-0"3 BOX GUTTER
DETAIL
A
1" = 1'-0"4 CONCRETE PAD
Duct System Legend
Supply Air
Outdoor Air
Return Air
Exhaust-Relief
Exhaust-Lab
Exhaust-Special
Exhaust-Dryer
Exhaust-Kitchen
Exhaust-Boiler
Exhaust-Water Heater
Combustion Air-Boiler
Combustion Air-Water Heater
#" OA
#" SA
#" RA
#" ER
#" EL
#" ES
#" ED
#" EK
#" EB
#" EWH
#" CA
#" CA
Symbol Description
Mechanical Symbol Legend
Ductwork
Supply duct section
Return duct section
Flexible ductwork
Connect to existing
Demolish to the point
Thermostat
CO2 sensor
Supply diffuser
Linear supply diffuser
Eggcrate return grille
Fire damper
20 x 12
Symbol Description
Transfer duct
TEquipment Control
CO2 Equipment Control
Balance damper
Exhaust duct section
TH Equipment Control
TCH Equipment Control
Thermostat combined with humidity sensor
Thermostat, CO2 and humidity combined sensor
Round, oval, or rectangular insulated duct work
Round, oval, or rectangular double wall insulated duct work.
Notes:
Certain items in this legend may not apply to this project.
Dark piping indicated new piping and light piping indicated existing.
Control Wire
Round, oval, or rectangular duct work. Uninsulated.
R
P
SYED
SHARIQ
O
E
76892
ALI
S I
F E R
S R
O
NE
AN L
N G
RE
DG
TEI S
I E
E
E
T
A
S
T H
I O
OFO
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
NOT FOR CONSTRUCTION
Project North True North
This drawing shall be printed in color
-0
-0
:2 :4
P
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
R /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
M
E P
T R
.r v t
1/8" = 1'-0"
GM001
GENERAL MECHANICAL
SSA
PDV
ALGEBRA
-0
R o c k e fe ll e r
P a rk
G re e n h o u s e C a m p u s U rb a n
F o re s tr y M a in te n a n c e G a ra g e
E a s t th
S tr e e t
C le v e la n d
CONTROLS
Natural Gas Meter:
Contractor shall install a natural gas meter on the gas line into the building. See control specifications for trending and other requirments for the natural gas meter.
Water Meter:
Contractor shall install a water meter which the BMS is able to read flow from. See control specifications for trending and other requirments for the water meter.
Electricity Metering:
Contractor shall incorporate electricity metering. See controls specifications and electrical drawings for requirments.
COORDINATION DRAWING REQUIRMENTS:
The CMR shall manage the coordination drawing process. All subcontractors shall draw all systems, and architectural elements in a 3-D program and shall be drawin in three dimensions. Two-dimensional coordination drawings shall be rejected.
All engineering system shall be drawn with constructable elements. Using the engineer's own 3-D elements and returning them as "coordination drawings" is unacceptable and shall be immediatly rejected.
Some of the elements which shall be modeled and coordinated (but not all) are listed below:
1. Rigid ductwork
2. Floor clean outs
3. Flor drains
4. Floor sinks
5. Air handlers / RTUs
6. Refrigerant piping
7. Boilers, intakes, and flues
8. Pumps
9. Plumbing and hydronic pipng
10. All plumbing elements
11. All mechanical elements
12. All electrical lighting and power elements
13. All IT /AV elements
14. All security elements
15. All fire alarm elements
MARK DATE DESCRIPTION
1 01.05.2026 PERMIT/BID SET
Mechanical General Notes 1 All exhaust and combustion intake ductwork shall be of a material which meets the manufacturer's requirments. All roof and wall openings shall be flashed and the building sealed water tight.
2 All gas piping shall be ran along the wall and above the garage doors at either end of the building.
3 The contractor shall visit the site prior to bidding and include all costs associated with accomodating the existing conditions within their base bid.
4 Contractor shall paint all exposed ductwork to match ceiling. See Architectural RCP.
5 Contractor shall seal all existing and new penetrations from gas piping and flues using Hilti Fire Caulk.
6 All rectangular duct elbows shall have turning vanes.
7 Contractor shall install balance dampers ahead of each diffuser at the trunk / main. For diffusers and ductwork which are above gyp or hard ceilings, a damper with remote access should be installed and the remote access cable should be accessible in the remote ceiling behind a white cover.
8 All cabeling in return and supply air shall be plenum rated.
C D E FBA
2" ø
N G
2" ø
N G
C D E FBA
4" ø
N G
4" ø
N G
4" ø
N G
3" ø
N G
2"ø NG
R
P
SYED
SHARIQ
O
E
76892
ALI
S I
F E R
S R
O
NE
AN L
N G
RE
DG
TEI S
I E
E
E
T
A
S
T H
I O
OFO
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
NOT FOR CONSTRUCTION
Project North True North
This drawing shall be printed in color
-0
-0
:2 :4
P
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
R /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
M
E P
T R
.r v t
1/16" = 1'-0"
M100
UNDERGROUND
MECHANICAL
SSA
PDV
ALGEBRA
-0
R o c k e fe ll e r
P a rk
G re e n h o u s e C a m p u s U rb a n
F o re s tr y M a in te n a n c e G a ra g e
E a s t th
S tr e e t
C le v e la n d
1/16" = 1'-0"
UNDERGROUND LEVEL MECHANICAL
DEMO PLAN
1/16" = 1'-0"
UNDERGROUND LEVEL MECHANICAL
PLAN
MARK DATE DESCRIPTION
1 01.05.2026 PERMIT/BID SET
Sheet Notes - M100 # Note
1 Approximate location of existing gas meter. Contractor shall coordinate the replacment of the existing gas meter with a new gas meter with the gas utility.
2 Approximate location of existing gas meter. Contractor shall coordinate the replacment of the existing gas meter with a new gas meter with the gas utility. Contractor shall install new regulator after utility gas meter.
3 Demolish and remove existing gas line below grade. The gas line shall not be abandoned in place. Prepare for the installation of new gas line below grade.
4 Install new gas line below ground from gas meter to building. Route around landscaping and planter beds. Contractor shall include avoiding obstacles on site with the gas line within their base bid.
5 Natural gas line up to GEN-1.
6 Existing gas line up out of ground at the wall of the forestry barn.
7 New gas line up out of ground at the wall of the forestry barn.
C D E FBA
6 6
UH-3
UH-1 UH-2
UH-4
1 1/2"ø NG
3"ø NG
1 1/2"ø NG
2"ø NG
1 1/2"ø NG
2 1/2"ø NG
3"ø NG
2 1/2"ø NG
1 1/2"ø NG
4"ø 4"ø
1"ø CND-LP
4"ø 4"ø
1"ø CND-LP
1"ø CND-LP 4"ø 4"ø
1"ø CND-LP 4"ø 4"ø
3" ø
N G3"ø NG
C D E FBA
1 1
EX.
UH
EX.
UH
EX.
UH
EX.
UH
2 2 2 2
2 2 2 2
1/
2" ø
N G
3"ø NG
1/
2" ø
N G
2"ø NG
1/
2" ø
N G
1 1/2"ø NG
4" ø
Notes:
1. Proper drain design and installation is critical to ensure that the unit and vent systems are properly drained.
Venting System Drip Leg and Condensate Drain Connections
Standard vent drip leg for US ONLY
Waterless trap positive pressureWaterless trap negative pressure
Drain and trap to sanitary sewer connection for condensate removal (see Note 1).
Combustion air inlet pipe connector
Unit Heater
GAS CONNECTION
NO SCALE
LEG
12" DIRT
UNION
TYPICAL NATURAL GAS
NO SCALE
PRESSURE REGULATOR EQUIPMENT CONNECTION DETAIL
TYPICAL NATURAL GAS
NO SCALE
W /C
APDIR
T LEG
PLUG V
ALVE
HVAC EQUIPMENT
REDUCER
UNIO
N
REGULATIN
G V
ALVE
GAS P
RESSURE
PLUG V
ALVE
R
P
SYED
SHARIQ
O
E
76892
ALI
S I
F E R
S R
O
NE
AN L
N G
RE
DG
TEI S
I E
E
E
T
A
S
T H
I O
OFO
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
NOT FOR CONSTRUCTION
Project North True North
This drawing shall be printed in color
-0
-0
:2 :5
P
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
R /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
M
E P
T R
.r v t
As indicated
M101
FIRST FLOOR MECHANICAL
PLAN
SSA
PDV
ALGEBRA
-0
R o c k e fe ll e r
P a rk
G re e n h o u s e C a m p u s U rb a n
F o re s tr y M a in te n a n c e G a ra g e
E a s t th
S tr e e t
C le v e la n d
3/32" = 1'-0"
LEVEL 1 - MECHANICAL PLAN
3/32" = 1'-0"
LEVEL 1 - MECHANICAL DEMO PLAN
Gas Unit Heater Schedule
Tag
Dimensions Manufacturer and
Model Number Type
Fluid Type
Air Side Heating
Input Heating Output
Electrical Data
Remarks Height Width Depth
Heating
CFM
Temp Rise Voltage FLA MCA MOCP
UH-1 22" 36" 34" Modine : PTC135 Condensing Unit Heater Natural Gas 2160 CFM 54 °F 135000 Btu/h 125500 Btu/h 120 V/1 8 10 20 All
UH-2 22" 36" 34" Modine : PTC135 Condensing Unit Heater Natural Gas 2160 CFM 54 °F 135000 Btu/h 125500 Btu/h 120 V/1 8 10 20 All
UH-3 22" 36" 34" Modine : PTC135 Condensing Unit Heater Natural Gas 2160 CFM 54 °F 135000 Btu/h 125500 Btu/h 120 V/1 8 10 20 All
UH-4 22" 36" 34" Modine : PTC135 Condensing Unit Heater Natural Gas 2160 CFM 54 °F 135000 Btu/h 125500 Btu/h 120 V/1 8 10 20 All
REMARKS:
1. PROVIDE AND INSTALL: CONDENSATE NEUTRALIZATION SYSTEM AND THERMOSTAT. ROUTE CONDENSATE OUT
SIDE OF BUILDING AFTER IT HAS BEEN NEUTRALIZED AND TERMINATE ON TOP OF A NEW SPLASH BLOCK.
2. INSTALL UNIT ON NEW STEEL AND UNISTRUT SUPPORT FROM BUILDING FRAMING AND STEEL.
3. PROVIDE UNIT WITH INTEGRAL DISCONNECT
NTS
Typical Modine (Model PTC135) Unit Heater
NTS
NATURAL GAS ALL
MARK DATE DESCRIPTION
1 01.05.2026 PERMIT/BID SET
Sheet Notes - M101 # Note
1 Demolilsh existing unit heater and vent through roof. Patch opening through roof. Disconnect gas line to unit heater and prep for reinstallation to new unit heater.
2 Install down spout boot for 6" line. Coordinate exact size needed with architectural plans and existing conditions. Connect downspout to storm line connection at grade.
3 Demolish gas line to unit heater and water heater.
4 Demolish gas line to unit heater.
5 Install natrual gas meter on main into building. See controls specifications for details.
6 Install new unit heater in this location. Hang in space at the same level as the original unit heater with unistrut from building structure. Route combustion air and exhaust air through the roof. Flash roof and seal water tight around ducts. Connect unit heater to existing gas line serving original unit heater in this location. Install a condensate neutralization kit on condensate line and drop condensate line to floor.
G
F A
C P
Electrical, Fire Alarm And Technology Legend
Symbol Description
Duplex receptacle (See key)
J
M z
DT
Quadruplex receptacle (See key)
Fire alarm manual pull station
Fire alarm audio/visual device - Wall mounted (candelas as indicated)
Fire alarm control panel
Smoke detector
Wall switch (See key)
Ceiling-mounted occupancy sensor (dual technology)
Junction box
Disconnect switch (non-fusible)
Grounding Bar
Grounding Rod
Disconnect switch (fusible)
Electrical panelboard - 208/120V
Electrical panelboard - 480/277V
Duct smoke detector
Electrical Circuiting Guide
3/4"C,1#12,#12N,#12G
R4:2
Circuit tag indicates the panel of the fixture, followed by the circuit number. If panel name is omitted, then assume circuit home run is to a typical panel for the given view (see notes for specifics).
Wire sizing tag indicates the trade size of conduit, followed by the number and gauge of (hot) phase conductors, followed by the gauge of neutral conductor, followed by gauge of ground conductor. See specifications for default conductor sizing.
18" AFF
Elevation to device centerline. If omitted, assume standard elevation.
Lighting Fixture Tag xy
PNL:1L1
Light fixture tag (see lighting fixture schedule). An 'E' prefix indicates a controlled emergency fixture
Electrical circuit (see Electrical Circuiting Guide above).
Switching zone (corresponds to superscript of the switch symbol).
149" AFF
Elevation to bottom of fixture. Elevation is typical for all fixtures within a room which share a Lighting Fixture Tag.
R
P
SYED
SHARIQ
O
E
76892
ALI
S I
F E R
S R
O
NE
AN L
N G
RE
DG
TEI S
I E
E
E
T
A
S
T H
I O
OFO
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
NOT FOR CONSTRUCTIONThis drawing shall be printed in color
-0
-0
:2 :5
P
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
R /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
M
E P
T R
.r v t
NTS
GE001
GENERAL ELECTRICAL,
TECHNOLOGY, FIRE
ALARM
ARH
ARR
ALGEBRA
-0
R o c k e fe ll e r
P a rk
G re e n h o u s e C a m p u s U rb a n
F o re s tr y M a in te n a n c e G a ra g e
E a s t th
S tr e e t
C le v e la n d
COORDINATION DRAWING REQUIRMENTS:
The CMR shall manage the coordination drawing process. All subcontractors shall draw all systems, and architectural elements in a 3-D program and shall be drawin in three dimensions. Two-dimensional coordination drawings shall be rejected.
All engineering system shall be drawn with constructable elements. Using the engineer's own 3-D elements and returning them as "coordination drawings" is unacceptable and shall be immediatly rejected.
Some of the elements which shall be modeled and coordinated (but not all) are listed below:
1. Rigid ductwork
2. Floor clean outs
3. Flor drains
4. Floor sinks
5. Air handlers / RTUs
6. Refrigerant piping
7. Boilers, intakes, and flues
8. Pumps
9. Plumbing and hydronic pipng
10. All plumbing elements
11. All mechanical elements
12. All electrical lighting and power elements
13. All IT /AV elements
14. All security elements
15. All fire alarm elements
Electrical Receptacle Key Label Type Mounting Height (to Centerline) (none) Standard receptacle 1'6" AFF
DC Display case 1' 6" AFF (must be accessible)
E Emergency receptacle (red) 1' 6" AFF
GFCI GFCI receptacle 1' 6" AFF
TV Television Within backbox
USB Standard receptacle w/ USB Aligned with top of bench
WP Weather protective 1'6" AFF
Electrical Wall Switch Key Label Type Mounting Height (to Centerline) (none) SPST 3' 6" AFF
D Dimmer wall pod capable of controlling all zones in given space.
3' 6" AFF
DT
Dimmer wall pod with integral dual technology vacancy sensor.
3' 6" AFF
E Emergency pushbutton 3' 6" AFF
A ADA Paddle Actuator Switch 4' AFF
WS Roller shade 3' 6" AFF
JA Jamb-Mounted Actuator Switch 4' AFF
Data Drop Key Label Type Mounting Height (none) Standard data drop 1'6" AFF
TV Television Within backbox
MARK DATE DESCRIPTION
1 01.05.2026 PERMIT/BID SET
Power General Notes 1 The electrical trades shall coordinate with all other trades to maintain required electrical clearances in front of equipment and required dedicated space above equipment per NEC.
2 Circuit wiring is only a schematic representation, and the actual wiring and conduit paths are not shown. All devices connected to a home run bearing the same circuit number shall be connected to that same circuit. Fixture positions on electrical plans are a schematic representation only for the purpose of circuiting. Unless explicitly dimensioned in these drawings, the exact dimensioned placement of fixtures shall be taken from architectural plans, elevations, and details.
3 Contractor shall provide each panelboard with at least as many slots as are shown in the corresponding panel schedule. All panels shall be fully bussed. Panel schedules do not show spare breakers. For each new panelboard, unless otherwise noted, provide single-pole 20A circuit breakers in all panelboard slots.
4 Unless noted otherwise, all circuits are served by phase conductor(s), a neutral conductor, and an equipment grounding conductor each having a gauge not smaller than AWG #12. Derate multiple conductors in raceways & wireways per requirements for 75°C-rated copper conductors in Article 310 of NEC.
5 Exposed conduit shall be routed tight to underside of deck above. Coordinate with mechanical piping and ductwork. Coordinate ceiling layering and conduit routing with other trades prior to installation.
6 Perform work and coordination as indicated in specifications for items provided by mechanical trades and requiring installation of branch circuiting. Refer to plans and specifications for extent of work.
7 Coordinate all relevant work with audio/visual contractor, security system contractor, and/or IT contractor.
8 Where practicable, power, feeder and branch circuit conduit and wiring shall be separated from raceway systems intended for routing voice or data wiring by no less than 3' 6". Where this separation cannot be achieved due to work of other trades, obstructions or interference, contractor shall route conduits/raceways at their own discretion in an effort to achieve as much separation as practicable.
9 Seal raceway systems at boundary of building interior/exterior to mitigate condensation in raceways. Contractor shall cut/patch/repair and fire-caulk all penetrations into building made to run electrical conduit.
10 Provide lock-on devices for circuit breakers serving loads which are part of the fire alarm system.
11 Coordinate power for VAV and terminal boxes with mechanical trades. Circuit shall be to a central control unit which distributes 24 V power to each individual box. This circuiting is not indicated in electrical floorplans.
12 Contractor shall provide custom color wall plates for all wiring devices on non-white walls. The contractor shall review the architectural finish plans for locations and include all cost associated with the custom color plates in their base bid.
Lighting General Notes 1 Circuit wiring is only a schematic representation, and the actual wiring and conduit paths are not shown. All luminaires connected to a power pack shall be powered, switched, and dimmed via that power pack. Wall pod switches shown connected to a power pack shall provide local zoned control of the luminaires on that power pack. Some zones may require an additional power pack for emergency lighting.
2 All luminaire finish and trim options shall be selected by architect. Coordinate all luminaire mounting heights with architect.
3 A prefix of "E" shall indicate emergency type lighting device or fixture, which shall be identical to the non-emergency variant in every way except for switching to emergency mode upon detection of main power loss (regardless of local control setting). A prefix of "N" shall indicate a nite-light type fixture, which shall be identical to the non-emergency variant in every way except it shall be circuited to an emergency panel and not be switched.
4 Where new lighting circuits and controls are not shown, luminaire power and control shall be existing to remain. Where new lighting controls are shown for a given group of luminaires, the existing controls cabling shall be demolished and replaced by new plenum-rated controls cabling.
Where existing power packs are being re-used, they may be re-located nearer luminaires when convenient.
5 Furnish all required power packs and accessories to satisfy requirements for switching zones as indicated.
Technology General Notes 1 Voice and/or data connections to mechanical, electrical, or other equipment provided by others shall be verified with the manufacturers prior to installation. Installations as indicated on the drawings shall be adapted to accommodate manufacturer required or suggested installation practices but shall be done to allow all required testing and certification. Installation as indicated on drawings shall also be completed in compliance with all codes and requirements of the authority having jurisdiction.
2 Contractor shall ensure technology fixtures are procured, furnished, roughed-in, and installed separately from electrical fixtures. Note that data outlet boxes are usually deeper than electrical boxes.
3 If not otherwise specified, the final locations for visible items shall be vertically and horizontally aligned with existing similar items and devices. Contractor shall similarly coordinate device locations of other trades whenever possible. This may include, but is not limited to, coordination with any device having a faceplate such as receptacles, switches, technology outlets, etc.
4 All cable and terminations for IT shall be plenum rated and shall be by the contractor. The contractor shall provide verified testing results that each cable has connectivity.
Fire Alarm General Notes 1 Fire alarm system design is a delegated design. The contractor shall hire a NICET-certified fire-alarm technician, Level III, to design the upgrades to the fire alarm system to bring it into code compliance. The design shown on the drawings herein is for reference only. See fire alarm specifications for additional details.
2 Contractor must provide and place adequate number of audio/visual horn and strobe devices to meet requirements of NFPA 72.
3 Flash rate for new audio/visual appliances must be synchronized with existing system. Contractor shall upgrade fire alarm control panel if necessary to accommodate synchronized stobe.
4 Contractor shall field-adjust audio device levels to provide 15 dBA above ambient noise level or 5 dBA above maximum noise level to meet requirements of NFPA 72.
5 Contractor shall perform a battery load calculation and a voltage drop calculation for entire system.
6 Prior to new work, hold a pre-installation conference with owner and architect to clarify appliance placement.
GG
G
100.B
100.B
100.B
100.B
C D E FBA
GEN-1
UH-3
UH-1 UH-2
UH-4
ATS-1
MDP
SD
:1:2
:3 :4
#4G
GEN-1
30 kW 120/208V
SD
MDP
MLO
120/208V
ATS-1
Forestry Barn First FloorGenerator Pad
M
Existing Utility Transformer 120/208V
1-1/4"C, 3#2, #2N, #8G
Feeder Schedule
R
P
SYED
SHARIQ
O
E
76892
ALI
S I
F E R
S R
O
NE
AN L
N G
RE
DG
TEI S
I E
E
E
T
A
S
T H
I O
OFO
C
IT
Y O
F C
LE
V E
LA
N D
SHEET NO:
CHECKED BY:
DESIGNED BY:
SCALE:
DELINEATED BY:
PROJECT NAME:
D E
P A
R T M
E N
T O
F P
U B
L
IC
W O
R K
S
C it y o f C le ve la n d
M a yo r' s O ff ic e o f C a p it a l P ro je c ts
D iv is io n o f A rc h it e c tu re
C le ve la n d
C it y H a ll
L a k e si d e A ve n u e
R o o m
A C le ve la n d
-1
P h o n e
-2 x:
-4 a n d S it e
D e ve lo p m e n t
TITLE:
NOT FOR CONSTRUCTION
Project North True North
This drawing shall be printed in color
-0
-0
:2 :5
P
M A u to d e s k D o c s /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
R /2
-0
C it y o f C le v e la n d R o c k e fe lle r
G re e n h o u s e
F o re s tr y B a rn
M
E P
T R
.r v t
As indicated
E101
FIRST FLOOR ELECTRICAL
PLAN
ARH
ARR
ALGEBRA
-0
R o c k e fe ll e r
P a rk
G re e n h o u s e C a m p u s U rb a n
F o re s tr y M a in te n a n c e G a ra g e
E a s t th
S tr e e t
C le v e la n d
1/8" = 1'-0"
ELECTRICAL POWER NEW WORK
NTS
Electrical Riser Diagram
MARK DATE DESCRIPTION
1 01.05.2026 PERMIT/BID SET
Sheet Notes - E101 # Note
1 Disconnect existing unit heater from its power feed. Leave pathways and conductors intact and protected in-place. Re-use this feed to power new unit heater. Coordinate with HVAC contractor.
2 Electrical equipment in this location is existing-to remain.
3 Generator air intake shall overhang the edge of concrete pad as required by manufacturer.
4 The EC shall provide an additional (non-utility-owned) electrical meter on the main service entrance. This meter shall provide communicate to the DDC System controller via Modbus. The meter shall provide data points for amperage, voltage and power factor for each phase, total power factor, power for each phase and total power (all in kW, kVA and kVAR) on an interval basis, and accumulative consumption (in kWh and kVARh) based on current day, previous day, previous week, previous month, and previous year, and monthly peak demand and associated date and time it occurred.
| Sheets |
| A0 - URBAN FORESTRY MAINTENANCE GARAGE COVER SHEET |
| A200 - FORESTRY GARAGE FIRST FLOOR PLAN |
| A201 - FORESTRY GARAGE ROOF PLAN |
| A400 - FORESTRY GARAGE EXTERIOR ELEVATIONS |
| AL100 - FORESTRY GARAGE LIFE SAFETY PLAN |
File details come from the government source that posted it. Updated .