11_FORM_CWM-8_CONSTRUCTION_WASTE.pdf

PDF 105 KB Posted

Attached to
Rockefeller Greenhouse Campus CM-R Improvements
Solicitation number
AR2547
Issued by
Cuyahoga County, Ohio

About this file

This is a Construction Waste Management form (CWM-8) for the City of Cleveland's Rockefeller Greenhouse Campus CM-R Improvements project, managed by the Mayor's Office of Capital Projects through the Division of Architecture and Site Development. The project encompasses three distinct components: a Traditional Design-Build for the Rockefeller Greenhouse Admin Building, Forestry Garage, and Historic Brick Garage (Project 1); a Traditional Design-Build for the Rockefeller Main Greenhouse General Improvements (Project 2); and a Progressive Design Build project for the Rockefeller Main Greenhouse solar glazing with a full project allowance (Project 3). The construction waste management requirements outlined in this form establish the procedures and specifications for waste handling, disposal, and documentation throughout the construction phases of these greenhouse campus improvements.

The form establishes mandatory construction waste management protocols that contractors must follow to ensure environmental compliance and proper material handling during all phases of the project. Contractors are required to implement waste reduction strategies, segregate recyclable materials, document waste streams, and report disposal methods according to City of Cleveland standards and applicable Ohio regulations. This documentation form serves as both a planning tool and a compliance verification mechanism, requiring contractors to detail their waste management procedures, identify designated disposal facilities, and maintain records of waste quantities and types throughout the project duration.

View the file

Other files

File Type Posted
Rockefeller_Greenhouse_Campus_CM-R_Improvements.pdf PDF
24_PW_RATES_-_COVER_LETTER_(2024.12.27).pdf PDF
15_PART_D_-_DETAIL_SPECIFICATIONS_JM.doc DOC document
14_PART_C_-_SUPPLEMENTAL_GENERAL_CONDITIONS.pdf PDF
09_017419_CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL.pdf PDF
10_FORM_CWM-7_DEMOLITION_WASTE.pdf PDF
16_PW_NOTICE_-Valerie_Harvey_(2024.12.27).pdf PDF
21_PW_THRESHOLD_LEVELS_-_OHIO_(2024.01.01).pdf PDF
035_Wage_Theft_PDF_Version.pdf PDF
010_Cleveland_City-Wide_Asbestos_Policy_(2017.05.19).pdf PDF
23_PW_CERTIFIED_PAYROLL_REPORT_-_OHIO_(2024.12.27).pdf PDF
22_PW_INSTRUCTIONS_FOR_PREPARING_CERTIFIED_REPORTS_-_OHIO_(2024.12.27).pdf PDF
08_City_of_Cleveland_Sustainable_Building_Policy_2013-04.pdf PDF
19_PW_NOTIFICATION_TO_EMPLOYEE_-_OHIO_(2024.12.27).pdf PDF
13_PART_B_-_General_Conditions_(final_8-28-25).pdf PDF
07_Cleveland_City-Wide_Asbestos_Policy_(2017.05.19).doc DOC document
17_Prev_Wage_Notification_(2024.12.27).pdf PDF
20_PW_AFFIDAVIT_OF_COMPLIANCE_-_OHIO_(2025.09.10).pdf PDF
05B_Design-Build_Agreement_Sample_for_MOCAP.pdf PDF
18_PW_CONTRACTOR_RESPONSIBILITY_-_OHIO_(2024.12.27).pdf PDF
06_2023_Reimbursables_Policy.pdf PDF
Phase_3_CLE_Greenhouse_Solar_Criteria_Documents.pdf PDF
Phase_2_Rockefeller_Greenhouse_Building_Permit-Bid_Project_Manual.pdf PDF
Phase_2_Rockefeller_Greenhouse_Building_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Admin_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Garage_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Forestry_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Buildings_Permit-Bid_Project_Manual.pdf PDF
04_DASD_Minimum_Deliverables_(2025.04.01).pdf PDF
03_Subcontractor_Addition_and_Subtraction_Policy.pdf PDF
02_Chap_187_2022-05-05.pdf PDF
01.1_NORTHERN_IRELAND_DISCLOSURE.pdf PDF
01_NORTHERN_IRELAND_NOTICE_(2024.12.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .