This document is the Instructions for Preparing Certified Reports issued by the State of Ohio for prevailing wage compliance in 2024. The file serves as guidance for contractors and construction professionals working on public works projects in Ohio, detailing the requirements and procedures for documenting and certifying prevailing wage payments to workers. The instructions establish the format, content, and submission standards for certified payroll reports that must accompany payment requests on state-funded or state-regulated construction projects. These instructions apply to all contractors and subcontractors engaged in public works activities within Ohio's jurisdiction and are mandatory for project compliance and payment processing.

The certified reports must document worker classifications, hourly wage rates, hours worked, and fringe benefits paid in accordance with Ohio's prevailing wage requirements. Contractors must submit these reports according to specified timelines and formats to verify compliance with prevailing wage laws before payment can be released. The instructions provide detailed procedures for record-keeping, calculation methodologies, and documentation standards to ensure transparency and accountability in wage compliance. Failure to submit accurate and timely certified reports can result in payment delays, penalties, and potential disqualification from future public works projects in Ohio. These requirements apply to the Rockefeller Greenhouse Campus CM-R Improvements project in Cleveland and any subcontractors or design-build partners engaged in construction activities on this project.

View the file

Other files

File Type Posted
Rockefeller_Greenhouse_Campus_CM-R_Improvements.pdf PDF
24_PW_RATES_-_COVER_LETTER_(2024.12.27).pdf PDF
15_PART_D_-_DETAIL_SPECIFICATIONS_JM.doc DOC document
14_PART_C_-_SUPPLEMENTAL_GENERAL_CONDITIONS.pdf PDF
09_017419_CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL.pdf PDF
10_FORM_CWM-7_DEMOLITION_WASTE.pdf PDF
16_PW_NOTICE_-Valerie_Harvey_(2024.12.27).pdf PDF
21_PW_THRESHOLD_LEVELS_-_OHIO_(2024.01.01).pdf PDF
035_Wage_Theft_PDF_Version.pdf PDF
010_Cleveland_City-Wide_Asbestos_Policy_(2017.05.19).pdf PDF
23_PW_CERTIFIED_PAYROLL_REPORT_-_OHIO_(2024.12.27).pdf PDF
08_City_of_Cleveland_Sustainable_Building_Policy_2013-04.pdf PDF
19_PW_NOTIFICATION_TO_EMPLOYEE_-_OHIO_(2024.12.27).pdf PDF
13_PART_B_-_General_Conditions_(final_8-28-25).pdf PDF
07_Cleveland_City-Wide_Asbestos_Policy_(2017.05.19).doc DOC document
17_Prev_Wage_Notification_(2024.12.27).pdf PDF
20_PW_AFFIDAVIT_OF_COMPLIANCE_-_OHIO_(2025.09.10).pdf PDF
05B_Design-Build_Agreement_Sample_for_MOCAP.pdf PDF
18_PW_CONTRACTOR_RESPONSIBILITY_-_OHIO_(2024.12.27).pdf PDF
11_FORM_CWM-8_CONSTRUCTION_WASTE.pdf PDF
06_2023_Reimbursables_Policy.pdf PDF
Phase_3_CLE_Greenhouse_Solar_Criteria_Documents.pdf PDF
Phase_2_Rockefeller_Greenhouse_Building_Permit-Bid_Project_Manual.pdf PDF
Phase_2_Rockefeller_Greenhouse_Building_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Admin_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Garage_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Forestry_Permit-Bid_Drawings.pdf PDF
Phase_1_Rockefeller_Campus_Buildings_Permit-Bid_Project_Manual.pdf PDF
04_DASD_Minimum_Deliverables_(2025.04.01).pdf PDF
03_Subcontractor_Addition_and_Subtraction_Policy.pdf PDF
02_Chap_187_2022-05-05.pdf PDF
01.1_NORTHERN_IRELAND_DISCLOSURE.pdf PDF
01_NORTHERN_IRELAND_NOTICE_(2024.12.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Employee Name, Address and Social Security number: This information must be provided for all employees that perform physical labor on the project. Corporate officers, partners, and salaried employees are considered employees and must be paid the prevailing rate. Individual sole proprietors do not have to pay themselves prevailing rate but must report their hours on the project.

2. Work Class: List classification of work actually performed by employee. If unsure of work classification, consult the Ohio department of Commerce, Wage and Hour Bureau. Employees working more than one classification should have separate line entries for each classification.

Indicate what year/level for Apprentices. Be specific when using laborer and operator classifications; for example, Backhoe Operator or Asphalt Laborer.

3. Hours Worked, Day & Date: In the first row of column 3 enter days of pay period example; M T W TH F S S. The second row is for the date that corresponds with each day for the pay period.

In the employee information section enter the number of hours worked on the prevailing wage project and which day the hours were worked. Separate rows are labeled for (ST) straight time hours and (OT) overtime hours. All hours worked after 40, must be paid at the appropriate overtime rate.

4. Project Total Hours : Total the hours entered for pay period.

5. Base Rate: Enter actual rate per hour paid to the employee. The overtime hourly rate is time and one half the base rate listed in the prevailing wage schedule plus fringe benefits at straight time rate. The prevailing wage schedule lists the base rate plus fringe benefit amounts. These

General

Contractors and subcontractors are required by law to submit certified payroll reports for work on projects covered by Ohio's Prevailing Wage Law. This form meets the reporting requirements established by Ohio Revised Code Chapter 4115. The use of this form is not mandatory, employers may submit their own forms provided that all of the required information is included. This form may be reproduced, or additional copies obtained from:

Ohio Department of Commerce Division of Industrial Compliance and Labor Bureau of Wage & Hour Administration 6606 Tussing Rd. P. O. Box 4009 Reynoldsburg, OH 43068 9009 Phone: (614) 644 2239

Certified Payroll Heading

Employer name and address: Company's full name and address. Indicate if the company is a subcontractor, if so list the name of the General or Prime. Project: Name and location of the project, including county. Contracting Public Authority: Name and address of the contracting public authority.

Week Ending: Month, day, and year for last day of reporting period. Payroll # : Indicates first, second, third, etc. payroll filed by the company for the project. Page indicator: number of pages included in the report. Project Number: Determined by the public authority. If there is no number leave blank.

Information by Column amounts added together equal the total prevailing wage rate. Employers must pay this total amount in one of three ways.

o Total rate may be paid in entirety in the base rate to the employee; in which case, the cash designation will be checked for fringe benefits.

o Total rate may be paid as listed in prevailing wage rate schedule with total fringe amounts paid approved plans.

o Total rate may be paid with a combination of base rate and fringe payments to approved plans in amounts other than those listed in schedule.

6. Project Gross: Enter total gross wages earned on the project for straight time and overtime.

Project hours X base rate should equal project gross.

7. Fringes: If fringe benefits are paid in the hourly base rate, indicate this by marking the cash space. If fringe benefits are paid to approved plans as listed in the prevailing wage rate schedule, mark the space Approved Plans. If fringe benefits are paid partially in the base rate and partially to approved plans, mark the space Cash & Approved plans. List the hourly amount paid to approved plans for each fringe. If payments are not made on a per hour basis, calculate the hourly fringe credit by dividing the yearly employer contribution by the lesser of: hours actually worked in the year (these must be documented) or 2080. Fringe benefits include: Employer's share of health insurance, life insurance, retirement plan, bonus/profit sharing, sick pay, holiday pay, personal leave, vacation, and education/training programs.

8. Total Hours All Jobs: Total all hours worked during the pay period including non prevailing wage jobs.

9. Total Gross All Jobs: Gross amount earned in the pay period for all hours worked.

10. Self explanatory.

11. Self explanatory.

12. Self explanatory.