Part 7 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf

PDF 8 MB Posted

Attached to
Project # 962CM3003 | Cemetery Improvement Project at Mare Island Naval Cemetery
Solicitation number
36C78626R0059_1
Issued by

About this file

These are Bid Documents for civil construction work at Mare Island Naval Cemetery in Vallejo, California, issued by the U.S. Department of Veterans Affairs, Office of Design and Construction Services. The project number is 962-003 and the documents were issued on May 4, 2026, with the architect/engineer of record being Anderson Engineering of Minnesota, LLC.

The bid documents contain comprehensive grading plans, section drawings, utility plans, erosion and sediment control specifications, and construction details for cemetery renovation work. Key project elements include: overall cemetery grading and drainage design across multiple sections (A through F) with detailed spot elevations and grade change lines; new fence installation with specifications for both level and sloped terrain; flower watering stations with pressure-reducing regulators and 3/4-inch copper supply lines; storm and sanitary sewer connections including 6-inch HDPE piping, drain tile systems with slopes ranging from 0.8% to 9.4%, and cleanout details; concrete pads for equipment and trash receptacles; pedestrian ramps and pavement specifications; riprap installation details for pipe ends; erosion control measures including silt fencing, bio-rolls, inlet protection, and construction entrance requirements with limits on disturbed acreage (0.20 acres maximum at any time); landscape restoration with specified tree and shrub plantings including roses and ornamental trees; and monument, vault, and headstone protection requirements with minimum 1-foot grade disturbance buffers. The documents reference related sheets for electrical details, specifications sections, and additional construction details. The project involves phased construction with restoration of turf areas using topsoil, erosion control blankets, and seed per the restoration plan.

View the file

Other files

File Type Posted
Revision_Log_ 962-003_Mare Island_ADD 005.pdf PDF
36C78626R0059 0004 - Amendment.pdf PDF
RFI_Log_ 962-003_Mare Island_ADD 005.pdf PDF
Part 5 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
962-003_Mare Island_SPEC_ADD 005_06-04-2026.pdf PDF
Part 4 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
Part 1 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
Part 3 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
Part 2 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
36C78626R0059 0003 - Amendment.pdf PDF
Site Visit Attendance Sheet.jpeg JPEG file
SF24_Bid Bond.pdf PDF
36C78626R0059 0002 - Amendment.pdf PDF
RFI_Form_rev1.pdf PDF
Mare Island NC Construction SCOPE OF WORK.pdf PDF
36C78626R0059 0001 - Amendment.pdf PDF
RFI_Form.pdf PDF
Attachment_Project_Sample_Template.docx DOCX document
Part 4 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Wage Determination_Solano County CA.txt TXT text file
962-003_Mare Island_Geotechnical Report_2025-05-12.pdf PDF
36C78626R0059_1_Solicitation.pdf PDF
DOL Certified Payroll Form.pdf PDF
Part 9 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
SF1413.pdf PDF
962-003_Mare Island_SPEC FULL_BD_05-04-2026.pdf PDF
Part 1 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 6 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 3 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 8 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 5 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Past Performance Questionnaire.docx DOCX document
Part 2 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Price Proposal Breakdown.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMHOFF ROAD

5.

0%

5.0%

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

SECTION DSECTION E SECTION C SECTION B

SECTION A

SECTION F

SECTION A

SECTION E

SECTION D SECTION B

SECTION C

SECTION F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ gr ad in g.

dw g ed it:

dv an cu ra s av ed

:5 /4

/2

2:

P

M p lo t:5

/4 /2

2:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

N

0 20' 40'

1. NEW SPOT ELEVATIONS ARE TO TOP OF FINISHED SURFACE

UNLESS OTHERWISE NOTED IN LEGEND.

2. TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING

UTILITIES. LOCATIONS OF UTILITIES SHOWN BASED ON SURVEY

AND AS-BUILT INFORMATION AND MAY NOT REPRESENT ACTUAL

CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR UTILIZING

UTILITY LOCATES PRIOR TO STARTING ANY WORK.

3. SEE SHEET CE101 FOR EROSION CONTROL PLAN.

GRADING NOTES

OVERALL CEMETERY

GRADING PLAN

CG101

LEGEND

PROP LINE

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

NEW MAJOR CONTOUR

NEW MINOR CONTOUR

BURIAL AREA

GRADE CHANGE LINE

NEW FENCE

FLOWER WATERING STATION

M

AT

C H

LI

N

E

- S

H

EE

T C

G

CG102

CG104

CG103

BF DV

1/CG104

SECTION F SECTION E SECTION D SECTION C SECTION B

SECTION A

CO

CO

CO

CO

CO SECTION C SECTION B

SECTION BSECTION C

.3

.1

.3

.9

.4

.4

.7

.8

9.

6%

.8

7.

7%

.4

.3

.4

GC 43.69

GC 44.04

GC 45.21

GC 53.87

GC 59.37

GC 67.91

GC 68.20

GC 59.08

GC 53.57

GC 44.92

GC 44.40

GC 52.02

GC 58.64GC 57.68

GC 54.03

GC 50.45

GC 43.44

GC 63.08 GC 64.04

GC 68.57

GC 68.07

BW (ME) 69.28± BW (ME) 69.53±

BW (ME) 68.97±

TW (ME) 68.72±TW (ME) 70.89±TW (ME) 71.00±

GC 48.72

GC 44.23

GC 42.72

GC 52.02

GC 54.78

GC 58.07

GC 63.25

GC 67.58

GC 69.75

GC 69.75 BW (ME) 69.51±

TW (ME) 70.60 HP 71.66

G 39.67± G 40.12±

G 38.77± G 38.81±

TP 39.72

GC 55.29

GC 48.79

GC 49.76

GC 60.36GC 59.40

GC 65.93

GC 66.04

GC 62.07GC 61.11

GC 50.47

TW (ME) 69.94±

BL 66.20GC 65.91

.0

TP 39.59

TP 39.74

TP 39.69

TP 39.53

TP 39.56

TP 47.26

TP 47.28

TP 46.95

TP 46.93

TP 41.19

TP 41.03

TP 56.91

TP 56.97

TP 56.57

TP 56.51

TP 70.38

TP 70.32

TP 69.69

BW (ME) 69.55±

GC 71.09

FG 54.43±

FG 54.25±

FG 53.37±FG 53.20±

FG 61.11± FG 61.10±

FG 60.72±

FG 60.73±

GC 65.33

TP 69.76

7.

7%

GC 50.66GC 49.60

.1

7.

7%

.1

.5

.0

.3

.3

.3

.3

.0

.3

.3

.3

.1

.0

.3

.3

.1

.0

9.

2%

.0

.2

.0

.3

.3

.3

.5

.4

6.

9%

6.

9%

.1

.7

.0

.0

.7

.3

.5

.8

7.

8%

.0

.5

.0

FG 64.64

FG 65.04

FG 64.46

FG 64.95

FG 65.96

FG 67.41

FG 67.13

FG 62.22

FG 64.49

FG 62.06

FG 63.42 ±

FG 63.54±

FG 63.83

FG 62.61

FG 62.52

GC 58.55

GC 58.32

FG 60.68

FG 60.91

FG 58.81

FG 58.71

FG 60.02

FG 60.16

FG 66.73

FG 62.84 ±

FG 62.91 ±

FG 64.09

FG 62.67

GC 66.04

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ gr ad in g.

dw dv an av ed

:5 /4

/2

2:

lo t:5

/4 /2

2:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

N

0 10' 20'

LEGEND

PROP LINE

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

NEW MAJOR CONTOUR

NEW MINOR CONTOUR

BURIAL AREA

BREAK LINE

EXISTING FENCE

FLOWER WATERING STATION

1. NEW SPOT ELEVATIONS ARE TO TOP OF FINISHED SURFACE

UNLESS OTHERWISE NOTED IN LEGEND.

2. TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING

UTILITIES. LOCATIONS OF UTILITIES SHOWN BASED ON SURVEY

AND AS-BUILT INFORMATION AND MAY NOT REPRESENT ACTUAL

CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR UTILIZING

UTILITY LOCATES PRIOR TO STARTING ANY WORK.

3. SEE SHEET CE101 FOR EROSION CONTROL PLAN.

GRADING NOTES

SPOT ELEVATION KEY

EXISTING GRADE

GUTTER FLOW LINE

TOP OF CURB

TOP OF PAVEMENT

HIGH POINT ELEVATION

GRADE CHANGE

FINISHED GRADE

RIM ELEVATION

EMERGENCY OVERFLOW ELEVATION

TOP WALL ELEVATION

BOTTOM WALL ELEVATION

MATCH EXISTING

G

TC

TP

HP

GC

FG

R

EOF

TW

BW

(ME)

WALL ELEVATIONS REFERENCE FINISHED

GRADE ADJACENT TO WALL.

GRADING - SECTION B-C

CG102

M

AT

C H

LI

N

E

- S

H

EE

T C

G

MATCHLINE - SHEET CG104

BF DV

KEY NOTES

1 MONUMENT TO REMAIN IN PLACE. DO NOT DISTURB GRADE

AT LEAST 1' FROM MONUMENT.

HEADSTONE TO REMAIN IN PLACE. DO NOT DISTURB GRADE

AT LEAST 1' FROM HEADSTONE.

1 GRADING ENLARGEMENT

1" = 5'

1/CG102 SECTION B

SECTION C

SECTION C

SE

C

TI

O

N D

SECTION A SECTION A

.8

.3

.0

.7

.0

9.4%

.6

.8

11.2%

11.2%

13.5%

14.7%

.7

.9

11.1%

.1

10.5% 12.3%

.9

.7

.4

.0

GC 57.68

GC 54.03

GC 50.45

GC 43.44

GC 63.08

GC 68.07

GC 48.72

GC 44.23

GC 42.72GC 40.64

GC 41.84

GC 46.33

GC 49.63

GC 52.02

GC 54.78

GC 52.39

GC 55.68

GC 58.07

GC 63.25GC 60.86GC 58.25

GC 53.08

GC 50.19

GC 47.43

GC 44.13

BL 39.65

GC 42.69GC 40.23

43.65

GC 46.11

GC 52.33GC 49.87

GC 53.25 GC 55.71

GC 61.61GC 59.15

GC 62.59

GC 65.20

GC 67.58

GC 69.75

GC 67.42

GC 64.20

GC 69.75

G 38.77± G 38.81±

TP 39.72

G 36.56±

G 36.37±

TP 38.31

GC 48.79

GC 59.40

GC 65.93

GC 61.11

GC 50.47GC 48.58

TP 39.59

TP 39.74

TP 39.69

TP 39.53

TP 39.56

TP 47.26

TP 47.28

TP 46.95

TP 46.93

TP 50.08

TP 50.43

TP 50.59

TP 50.95

TP 38.11

TP 43.37

TP 43.37

TP 70.38

TP 70.32

TP 69.69

TP 43.29

TP 43.29

GC 71.09

FG 54.25±

FG 53.20±

FG 61.11±

FG 60.72±

FG 64.74± FG 65.10±

FG 65.93±

FG 66.29±

.3

.3

GC 62.95

GC 65.33

BL 64.59

BL 66.84

TP 69.76

GC 49.60

.0

.2

.0

.3

.3

.3

.5

.4

6.

9%

6.

9%

.1

.7

.0

.0

.7

.3

.5

.8

7.

8%

.0

.5

.0

.0

.0

.7

.3

.5

.0

.0

.0

.0

.7

.5

.5

.0

.0

.0

.7

.1

9.

1%

.0

.7

.1

9.

1%

.1

.4

.0

.0

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ gr ad in g.

dw dv an av ed

:5 /4

/2

2:

lo t:5

/4 /2

2:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

N

0 10' 20'

GRADING - SECTION D-F

CG103

M

AT

C H

LI

N

E

- S

H

EE

T C

G

MATCHLINE - SHEET CG104

M

AT

C H

LI

N

E

- S

H

EE

T C

G

BF DV

LEGEND

PROP LINE

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

NEW MAJOR CONTOUR

NEW MINOR CONTOUR

BURIAL AREA

GRADE CHANGE LINE

EXISTING FENCE

FLOWER WATERING STATION

1. NEW SPOT ELEVATIONS ARE TO TOP OF FINISHED SURFACE

UNLESS OTHERWISE NOTED IN LEGEND.

2. TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING

UTILITIES. LOCATIONS OF UTILITIES SHOWN BASED ON SURVEY

AND AS-BUILT INFORMATION AND MAY NOT REPRESENT ACTUAL

CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR UTILIZING

UTILITY LOCATES PRIOR TO STARTING ANY WORK.

3. SEE SHEET CE101 FOR EROSION CONTROL PLAN.

GRADING NOTES

SPOT ELEVATION KEY

EXISTING GRADE

GUTTER FLOW LINE

TOP OF CURB

TOP OF PAVEMENT

HIGH POINT ELEVATION

GRADE CHANGE

FINISHED GRADE

RIM ELEVATION

EMERGENCY OVERFLOW ELEVATION

TOP WALL ELEVATION

BOTTOM WALL ELEVATION

MATCH EXISTING

G

TC

TP

HP

GC

FG

R

EOF

TW

BW

(ME)

WALL ELEVATIONS REFERENCE FINISHED

GRADE ADJACENT TO WALL.

KEY NOTES

1 MONUMENT TO REMAIN IN PLACE. DO NOT DISTURB GRADE

AT LEAST 1' FROM MONUMENT.

SECTION DSECTION ESECTION F

SE

C

TI

O

N C

CO

CO

CO

.3

.9

7.

6%

.6

.8

11.1%

.1

.4

.0

.0

.3

.5

BW (ME) 69.28± BW (ME) 69.53±

BW (ME) 68.97±

TW (ME) 68.72±TW (ME) 70.89±TW (ME) 71.00±

GC 69.75

GC 67.42

GC 64.20

GC 72.15

GC 75.35

GC 77.90

TW (ME) 73.93±

BW (ME) 72.68±

GC 69.75

GC 74.06

GC 75.76

GC 71.92

GC 74.62

GC 76.31

GC 73.29

GC 69.96

GC 70.95

GC 77.62

GC 76.17

GC 73.62

GC 70.42

BW (ME) 69.51±

TW (ME) 70.60 HP 71.66

FG 74.84±FG 75.29±

TW (ME) 74.54±

BW (ME) 72.95±

TW (ME) 73.27±

FG 78.36

TW/BW (ME) 71.85±

BW (ME) 70.97±

BW ME 71.09±

GC 71.08

TW (ME) 69.94±

.3

TP 70.38

TP 70.32

TP 69.69

FG 78.87

FG 78.36

BW (ME) 69.55±

GC 71.09

.0

FG 66.29±

BW (ME) 72.95±

FG 71.90±

FG 71.98±

FG 71.37±

FG 71.26±

14.3%

8.3%

GC 74.74GC 75.64

GC 77.43 16

.7

FG 74.77±

FG 74.74±

FG 72.76±FG 72.70±

GC 74.41

GC 76.96

TP 69.76

.0

.7

.1

.4

.6

.7

.2

.3

.0

.0

.0

.0

.0

.0

.0

.2

6.

3%

CO

SECTION F

TP 61.84

FG 61.49

FG 61.55

TP 61.90

TP 62.01

TP 61.95

TP 69.03

TP 69.14

FG 69.49

FG 69.38

TP 69.00

TP 69.11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ gr ad in g.

dw dv an av ed

:5 /4

/2

2:

lo t:5

/4 /2

4:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

N

0 10' 20'

GRADING - SECTION A

CG104

MATCHLINE - SHEET CG102MATCHLINE - SHEET CG103

BF DV

42" MIN.

CLEARANCE

IRRIGATION

PUMP PAD

2:1

2.0%

2:1

10%

1 IRRIGATION PUMP & SECURITY CABINET PAD GRADING

1" = 10'

2:1

42" MIN.

CLEARANCE10%

2.0%

SECURITY

CABINET PAD

LEGEND

PROP LINE

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

NEW MAJOR CONTOUR

NEW MINOR CONTOUR

BURIAL AREA

GRADE CHANGE LINE

EXISTING FENCE

FLOWER WATERING STATION

1. NEW SPOT ELEVATIONS ARE TO TOP OF FINISHED SURFACE

UNLESS OTHERWISE NOTED IN LEGEND.

2. TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING

UTILITIES. LOCATIONS OF UTILITIES SHOWN BASED ON SURVEY

AND AS-BUILT INFORMATION AND MAY NOT REPRESENT ACTUAL

CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR UTILIZING

UTILITY LOCATES PRIOR TO STARTING ANY WORK.

3. SEE SHEET CE101 FOR EROSION CONTROL PLAN.

GRADING NOTES

SPOT ELEVATION KEY

EXISTING GRADE

GUTTER FLOW LINE

TOP OF CURB

TOP OF PAVEMENT

HIGH POINT ELEVATION

GRADE CHANGE

FINISHED GRADE

RIM ELEVATION

EMERGENCY OVERFLOW ELEVATION

TOP WALL ELEVATION

BOTTOM WALL ELEVATION

MATCH EXISTING

G

TC

TP

HP

GC

FG

R

EOF

TW

BW

(ME)

WALL ELEVATIONS REFERENCE FINISHED

GRADE ADJACENT TO WALL.

KEY NOTES

1 VAULTS TO REMAIN IN PLACE. DO NOT DISTURB GRADE

AROUND VAULTS AND EXISTING RETAINING WALL.

MONUMENT TO REMAIN IN PLACE. DO NOT DISTURB GRADE

AT LEAST 1' FROM MONUMENT.

VAULT TO REMAIN IN PLACE. DO NOT DISTURB GRADE AT

LEAST 1' FROM VAULT.

SECTION A

SECTION A

SECTION BSECTION CSECTION DSECTION E

0+00

.4

.5

.9

.9 1+00

.9

.0

.9

.0

2+00

.3

.4

3+00 3+05

.3

0+00

.7

.8

.4

.9

1+00

.0

.0

.8

.3

2+00

.5

.7

.8

.6

3+00

.7

3+12

.6

0+00

.5

.8

.6

1+00

.9

.7

.0

.8

2+00

.1

.8

.2

.1

3+00

.0

3+12

0+00 1+00 2+00 3+00 3+12

.7

0+00

.6

.1

.2

.2

1+00

.7

.1

.9

.5

2+00

.9

.9

.4

.3

3+00

.5

3+07

.4

0+00

.2

.0

.3

1+00

.1

.0

.5

.9

2+00

.5

.3

.6

2+94

.9

0+00

.6

.0

.9 1+00

.9

.5

.3

.7

2+00

.5

.3

.3

2+75

1 SECTION B

SCALE V/: 1" = 8' H: 1" = 20'

2 SECTION C

SCALE V/: 1" = 8' H: 1" = 20'

3 CENTER PATH

SCALE V/: 1" = 8' H: 1" = 20'

4 SECTION D

SCALE V/: 1" = 8' H: 1" = 20'

5 SECTION E

SCALE V/: 1" = 8' H: 1" = 20'

6 SECTION F

SCALE V/: 1" = 8' H: 1" = 20'

LEGEND

NEW GRADE

EXISTING GRADE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ pr of -s ec tio ns .d w dv an av ed :5

/4 /2

:2

AM

lo t:5 /4

/2

2:

P

M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

SECTION GRADING PROFILES

CG401

BF DV

BACK OF

CURB LINE

BACK OF

CURB LINE

BACK OF

CURB LINE

BACK OF

CURB LINE

BACK OF

CURB LINE

BACK OF

CURB LINE

NEW

FENCE

NEW

FENCE

EXISTING

RETAINING WALL

TO REMAIN

DRAIN TILE

DRAIN TILE

NEW

FENCE

DRAIN TILE

NEW

FENCE

DRAIN TILE

NEW

FENCE

DRAIN TILE

NEW

FENCE

DRAIN TILE

NEW

FENCE

DRAIN TILE

NEW

FENCE

NEW

FENCE

NEW

FENCE

NEW

FENCE

NEW

FENCE

FLAG POLE

DRAIN TILE

DRAIN TILE

DRAIN TILE

DRAIN TILE

EXISTING

RETAINING WALL

TO REMAIN

EXISTING

RETAINING WALL

TO REMAIN

PROPERTY

LINE

PROPERTY

LINE

PROPERTY

LINE

SECTION DSECTION E SECTION C SECTION B

SECTION A

SECTION F

SECTION A

SECTION E

SECTION D SECTION B

SECTION C

SECTION F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ er os io n.

dw dv an av ed

:5 /4

/2

:5 lo t:5

/4 /2

2:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

N

0 20' 40'

LEGEND

PROPERTY LIMITS

CONSTRUCTION LIMITS

EXISTING MINOR CONTOUR

EXISTING MAJOR CONTOUR

PROPOSED MINOR CONTOUR

PROPOSED MAJOR CONTOUR

EXISTING SPOT ELEVATION

DRAINAGE ARROW

SILT FENCE

INLET PROTECTION

CONSTRUCTION ENTRANCE

BIO ROLL

KEY NOTES

INSTALL AND MAINTAIN SILTFENCE PERIMETER SEDIMENT

PROTECTION IN TURF AREAS. USE BIO-ROLLS AS NEED IN

PAVED AREA. SEE DETAIL 1/C-501.

INSTALL AND MAINTAIN INLET SEDIMENT PROTECTION.

SEE DETAIL 2/C-501.

INSTALL TEMP ROCK ENTRANCE OR HARD SURFACE

ASPHALT/CONCRETE AT CONSTRUCTION INGRESS &

EGRESS LOCATION PRIOR TO EXCAVATION. MAINTAIN

THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS.

SEE DETAIL 3/C-501.

INSTALL TEMPORARY BIO-ROLL EROSION PROTECTION

FOR PHASED DISTURBED SECTIONS WITHIN THE BURIAL

LIMITS. SEE DETAIL 4/C-501.

INSTALL MIN. 6 CUBIC YARDS OF PERMANENT RIPRAP AT

CONCRETE SWALE ENDS. SEE DETAIL 16/C-502.

INSTALL MIN. 5 CUBIC YARDS OF PERMANENT RIPRAP AT

8" HDPE FLARED END PIPE. SEE DETAIL 17/C-502.

EROSION & SEDIMENT

CONTROL PLAN

CE101

GENERAL NOTES

1. CONTRACTOR TO PHASE CONSTRUCTION AS TO NOT

DISTURB MORE THAN 0.20 ACRES OF SOIL AT ANY TIME.

2. DISTURBED AREAS TO RECEIVE TOPSOIL, EROSION

CONTROL BLANKET, AND SEED PER RESTORATION PLAN.

BF DV

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

SECTION DSECTION E SECTION C SECTION B

SECTION A

SECTION F

SECTION A

SECTION E

SECTION D SECTION B

SECTION C

SECTION F

R. 68.60 I. 67.27

R. 58.00

I. 56.50 6" SE

I. 48.70 8" NE

R. 36.00 I. 34.50 6" E

I. 32.00 8" SW

I. 32.00 8" N

R. 41.70 I. 40.20

I. 31.00 8" S

R. 39.63 I. 38.13R. 38.80

I. 37.30

R. 36.52 I. 35.02

100 LF 6" DT @ 0.8%

70 LF 4" DT @ 3.2%100 LF 6" DT @ 3.5%81 LF 6" DT @ 8.6%

167 LF 8" HDPE @ 10.0%

(SOLID)

45 LF 8" HDPE @ 2.2%

(SOLID)

R. 40.00 I. 34.60

R. 62.80 I. 61.30 6" (N)

I. 59.90 9" (NE) EX

R. 71.33 I. 70.00

78 LF 6" HDPE @ 9.4%

(SOLID)

R. 71.00 I. 69.50

60 LF 4" DT @ 0.8%

R. 68.50 I. 67.00

R. 65.00 I. 63.50

100 LF 6" DT @ 2.1%

100 LF 6" DT @ 2.3%

22 LF 6" DT @ 2.4%

BOOSTER PUMP

PAD LOCATION

SEE IRRIGATION

FOR DETAILS

EXISTING WELL

LF

" A W

W A

C

W

AT

ER

M

AI

N

BU

R Y

3' M

IN

INSTALL

RIP RAP

INSTALL

RIP RAP

INSTALL

RIP RAP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ ut ilit y.

dw dv an av ed :5

/4 /2

:4 lo t:5 /4

/2

2:

P

M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

N

0 20' 40'

LEGENDLEGEND

PROPERTY LIMITS

EXISTING STORM SEWER

EXISTING SANITARY SEWER

EXISTING WATERMAIN

EXISTING ELECTRIC

EXISTING FENCE

EXISTING GUARD RAIL

EXISTING HYDRATE AND GV

EXISTING STORM SEWER INLET

PROPOSED FWS

PROPOSED STORM SEWER

PROPOSED SANITARY SEWER

PROPOSED WATERMAIN

PROPOSED FENCE

KEY NOTES

UTILITY PLAN - CEMETERY

CU101

NEW FLOWER WATERING STATION. SEE DETAIL 9/C-501.

WET TAP AND CONNECT TO EXISTING 12" WATER MAIN.

INSTALL WITH 4" GV.

INSTALL 45° BEND AS SHOWN.

INSTALL 22.5° BEND AS SHOWN.

LIGHT POLES. SEE ELECTRICAL DETAIL 4/E-501.

CONNECT SOLID 6" HDPE TO EXISTING MANHOLE VIA

CORE DRILL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ de ta ils

.d w dv an av ed

:5 /4

/2

1:

lo t:5

/4 /2

2:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

DETAILS

C-501

NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO

WIRE MESH WITH HOG RINGS, STEEL POSTS WITH TIE WIRES, OR

WOOD POSTS WITH STAPLES.

DIRECTION OF

RUNOFF FLOW

2' M

IN

ENGINEERING FABRIC

FABRIC ANCHORAGE TRENCH

BACKFILL WITH TAMPED

NATURAL SOILMETAL OR WOOD

POST OR STAKE

WIRE MESH

REINFORCEMENT

(OPTIONAL)

TYPICAL INSTALLATION

NATURAL SOIL

6" M

IN

6" MIN.

50' MINIMUM

AS REQUIRED

6" M

IN

IM

U M

1"-2" WASHED ROCK

1" (25 mm) REBAR

FOR BAG REMOVAL

FROM INLET

EXPANSION RESTRAINT

[1/4" (6 mm) NYLON ROPE, 2" (51 mm) FLAT

WASHERS]

2 EACH DUMP

STRAPS

DUMP STRAP

SILT SACK

1 SILT FENCE

NTS 2 INLET PROTECTION

NTS 3 CONSTRUCTION ENTRANCE

NTS

3' TO 5' ABOVE

TOE OF SLOPE

3' TO 5' BELOW

TOP OF SLOPE

TOP OF SLOPE

TOE OF SLOPE

STAGGER JOINTS

5'-0" TO 10'-0"

BIOROLL,TYP.

NOTE:

1. WHERE SLOPE LENGTH IS LESS THAN 12',

PLACE ONE BIOROLL ±24" ABOVE

MIDPOINT OF SLOPE.

2. MAINTAIN MIN. OF 3' AND MAX. OF 5'

BETWEEN BIOROLL.

4 BIO ROLL ON SLOPE

NTS

1' SPACING OF

STAPLES

EXTEND MATTING

OVER SIDES AND TOP

OF MULCHED AREA

1' SPACING OF

STAPLES

12"

MIN.

OVERLA

P

5' M

AX.6' M

IN.

OVERLA

P

5' SPACING OF

STAPLES ALONG

EACH EDGE AND

DOWN CENTER

NOTE:

1. COVER MULCH WITH JUTE

NETTING.

2. PIN JUTE NETTING TO GRADE ON

UPHILL SIDE .

3. INSTALL FINAL LAYER OF MULCH.

TREE PROTECTION

AREA - DO NOT ENTER

TEMPORARY

FENCING

FENCE POST

TEMPORARY

SIGNS

CRITICAL ROOT ZONE

TREE PROTECTION AREA

1. UNDER THE GUIDANCE OF AN CERTIFIED ARBORIST AND THE COR, ERECT

TEMPORARY POSTS, FENCING AND SIGNS AT THE CRITICAL ROOT ZONE LIMIT

OR AS DIRECTED OTHERWISE.

2. TREE PROTECTION SHALL BE ERECTED TO PROVIDE A CONTINUOUS

BARRICADE BETWEEN THE TREE AND WORK AREA PRIOR TO ANY

CONSTRUCTION ACTIVITY.

3. ANY WORK REQUIRED WITHIN THE CRITICAL ROOT ZONE AREA SHALL BE

CONDUCTED UNDER FULL TIME OBSERVATION OF A CERTIFIED ARBORIST.

4. REFER TO SPECIFICATION SECTION 02 35 00 TREE PROTECTION AND

PRESERVATION FOR ADDITIONAL REQUIREMENTS.

6" 6"

NOTES:

1. COVER BIOROLL WITH JUTE NETTING.

2. TERMINATE JUTE NETTING AT TOE OF SLOPE.

KEY TRENCH AT

TOP OF SLOPE

KEY TRENCH AT

TOE OF SLOPE

FASTNER

KEY TRENCH BACKFILL

AND TAMP SOIL

JUTE NETING

BREAK POINT

@ TOP OF SLOPE

3'-0" MIN.

6" 6"

FASTNER

KEY TRENCH BACKFILL

AND TAMP SOIL

JUTE NETING

BREAK POINT

@ TOE OF SLOPE

8" - 10"

M

IN.

SLOPE

STAKE

BIOROLL

FASTENER, TYP.

TOPSOIL

JUTE NETTING

5 JUTE NETTING ON SLOPE

NTS 6 JUTE NETTING TRENCH

NTS 7 JUTE NETTING OVER BIO ROLL

NTS 8 TREE PROTECTION

NTS

9B C501

9A

C501

1'-6"

3'-0"

3' -0

4'-0"

1' -6

6" 1'

-4 1 4"

1'-6" 2'

-0

1'-6"

2' -4

3"

6" 1'

-4 1 4"

7 12"

R2"

3' -0

1'-6"

2' -0

1'-6"

ARCH. PRE-CAST CONC. POST 7-1/2" SQ. X 7'-6"

W/ 1" CHAMFER @ ALL EXPOSED CORNERS &

3/8" RECESSED AREA (4 1/4" X 6-3/4" X 3/8" DP) (2

SIDES); CAST W/ (3) #3 REBAR EQUALLY

SPACED, FINISH AS SPECIFIED

DRAINAGE FILL (12" MIN. DEPTH),

COMPACTED

FILTER FABRIC,

12" MINIMUM DEPTH

1/2" COPPER TUBING CAST

INTO CONCRETE SIGN POST FOR

CONNECTIONS AFTER

INSTALLATION

CONCRETE FOOTING

COMPACTED SUBGRADE

1/8" THICK ALUMINUM SIGN PANEL; SEE SPEC. FOR

MATERIALS & COPY COLOR & FINISH

CONCRETE PAVING

4" AGGREGATE BASE,

COMPACTED TO 95% RD.

12" X 22" CONCRETE

VALVE BOX WITH METAL LID.

SEE PLANS FOR LOCATION.

FINISHED GRADE

3' -0

BRASS PRESSURE

REDUCING REGULATOR

3/4" COPPER DOMESTIC

WATER SUPPLY LINE

GATE VALVE7 12"

1' -2

SMOOTH FINISH

BRONZE SPIGOT

CONCRETE FLUSH TO

GRAVEL WALKWAY

FILTER FABRIC,

12" MINIMUM DEPTH

1/2" COPPER TUBING CAST

INTO CONCRETE SIGN POST FOR

CONNECTIONS AFTER

INSTALLATION

CONCRETE FOOTING

COMPACTED SUBGRADE

FLOWER WATER STATION SECTION 9A

NOT TO SCALE

FLOWER WATER STATION SECTION 9B

NOT TO SCALE

FLOWER WATER STATION PLAN VIEW

NOT TO SCALE

DRAINAGE FILL

1' RADIUS

EDGE OF

GRAVEL WALKWAY

9 FLOWER WATERING STATION DETAILS

NTS

1'-6"

4" AGGREGATE BASE,

COMPACTED TO 95% RD.

6" CONCRETE

PAVING

3' -0

3'-0"

10 TREASH RECEPTICLE PAD

NTS

6.

10.00

3.00

3.00

6.

3.003.00

10.00

6.

10.00

3.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ de ta ils

.d w dv an av ed

:5 /4

/2

1:

lo t:5

/4 /2

2:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

DETAILS

C-502

0" CURB HEIGHT AT PEDESTRIAN RAMP

FULL CURB HEIGHT

VARIABLE HEIGHT CURB

EXPANSION JOINT

ENTRANCE RAMP KEY NOTES

3.00

1 WEST ENTRANCE

1" = 5' 2 CENTER ENTRANCE

1" = 5' 3 EAST ENTRANCE

1" = 5'

6 VALLEJO CITY CURB DETAIL

NTS

#4 BARS @ 12" T+B

10 REBUILT INTERMENT ENCLOSURE CURB

NTS

MINIMUM 3" SAND

OR GRAVEL CUSHION

12 DECOMPOSED GRANITE PATH

NTS

3" MIN.

7 DRAINTILE DETAIL

NTS 8 DRAINTILE END OF LINE & INLINE CLEANOUT

NTS

IN LINE CLEANOUT END OF LINE CLEANOUT

100' MAX

100' MAX.

4" PVC

6"x4" RED.

LONG SWEEP

90° BEND

LONG SWEEP

90° BEND

WYE MAIN LINE

SEWER FINISHED GRADE

3" PEA GRAVEL

9 INTERMENT ENCLOSURE CROSS SECTION

NTS

3" PEA GRAVEL

TOP SOIL

SEE LANDSCAPE

PLAN FOR DEPTH

TOP SOIL

SEE LANDSCAPE

PLAN FOR DEPTH

2 " CALTRANS SEC 39-2

BITUMINOUS WEAR (MIN.)

CALTRANS SEC 92 TACK COAT

2" CALTRANS SEC 39-2

BITUMINOUS NON-WEAR (MIN.)

8" CALTRAN CLASS II AGGREGATE BASE (MIN.)

11 BITUMINOUS PAVING SECTION

NTS

3" MIN.

3" CLR. MIN.

4"

3" 3"

3" CLR. MIN.

4" MIN. FROM

TOP OF GRADE

VARIES

MATCH

HISTORICAL

95% COMPACTED

SUBGRADE

4" CALTRANS SEC 26 CLASS 2

AGGREGATE BASE (MIN.)

4" COMPACTED DECOMPOSED

GRANITE PATHWAY MIX

#57 STONE

12"

MIN.

PERFORATED HDPE

DRAINTILE PER PLAN

12"

3"

MIN.

6" PEA

GRAVEL

BUFFER

4"

VARIES

6" PEA

GRAVEL

BUFFER

4"

6" PEA

GRAVEL

BUFFER

VARIES

VARIES

TOP SOIL

SEE LANDSCAPE

PLAN FOR DEPTH

FREE DRAINING

BACKFILL

GEOTEXTILE FABRIC

OVERLAP AT TOP 6"

CLASS B

CONCRETE

COLLAR

CLASS B CONC.

COLLAR

SEWER

CHRISTY G-5 BOX (IN TRAFFIC

AREAS & DRIVEWAYS) OR CHRISTY

F-8 BOX (IN NON-TRAFFIC AREAS &

SIDEWALK). MARK "SEWER" WITH

TWO (2) OPEN HOLES

4" PVC

6"x4" RED.

13 CONCRETE EQUIPMENT PAD

NTS

95% COMPACTED

SUBGRADE

6" CALTRANS SEC 26 CLASS 2

AGGREGATE BASE (MIN.)

8" CONCRETE PAD

4000 PSI, 6% AIR ENTRAINED

4 PEDESTRIAN RAMP PROFILE

1" = 5'

1 332 2

5 PEDESTRIAN PAVEMENT

NTS

95% COMPACTED

SUBGRADE

4" CALTRANS SEC 26 CLASS 2

AGGREGATE BASE (MIN.)

4" CONCRETE PAD

4000 PSI, 6% AIR ENTRAINED

SUBGRADE TO BE TESTED & APPROVED BY GEOTECHNICAL

CONSULTANT, OR THEIR REPRESENTATIVE.

NOTE

1. APPLY TACK COAT ALONG ALL POINTS WHERE

PROPOSED PAVEMENTS MEET EXISTING

PAVEMENTS.

17 RIP RAP DETAIL

NTS

DIA. OF

PIPE (IN.) L (FT.)

CONCRETE

QUANTITY

(C.Y.)

MINIMUM RIPRAP REQUIRED

TIE THE LAST 6 JOINTS ON INLET AND OUTLET PIPES

AND BED IN GRANULAR MATERIAL. ANY COVER LESS

THAN 2' OVER TOP OF PIPE SHALL BE GRANULAR

MATERIAL.

SECTION A-A

SECTION B-B

NOTE:

ONE CUBIC YARD IS

APPROXIMATELY 1.4 TONS.

PLAN

1' (12"-27" DIA. PIPE)

1.5' (30" AND LARGER PIPE)

RIPRAP

NONWOVEN GEOTEXTILE

FABRIC

1' (12"-27" DIA. PIPE)

1.5' (30" AND LARGER PIPE)

RIPRAP

NONWOVEN GEOTEXTILE FABRIC

EXTEND 1' UNDER FES

D

IA

D

IA

B

A

BL

2'

2'

Z Z

Z

Z

CONTROL JOINT

EXPANSION JOINT

PROVIDE EXPANSION JOINTS AT CURB AND SIDEWALK CONNECTION.

PROVIDE CONTROL JOINTS PER SPECS.

1/8" R (TYP)

D /4

1/8"

3/8"

JOINT SEALER PER

SPEC SECTION 321373

PREMOULDED EXPANSION JOINT FILLER

CONFORMING TO SPEC SECTION 321373

NOTE: JOINTS CAN BE SAW CUT.

14 JOINTING DETAIL

NTS

SWALE

16 VALVE ASSEMBLY DETAIL

NTS15 TRNECH DETAIL

NTS

8'-0",TYP.

17 PICKETS TO BE EQUALLY SPACED BETWEEN CENTER OF POSTS

SALVAGE AND REINSTALL ALL EXISTING FINIALS

END PICKET TO BE CENTERED ON POST, TYP.

3' -0

VA

R

IE

S M

IN

IM

U M

M

AX

IM

U

M

FINISH GRADE

6" 3"

4' -6

3' -0

1 8 "RAILS

CONCRETE FOOTER

FINIAL

FINISH GRADE

RAILS

CONCRETE FOOTER

1" 1"

3"3"

3' -3

1 2 "

5 1/2"

3"

1 1/4"

1/2"

1/2"

FINIAL

FINISH GRADE

BOTTOM RAIL

CONCRETE FOOTER

TOP RAIL

PICKET

FINIAL

RAILS

PICKETS

CONCRETE FOOTER

POST

1'-6"

1/

2"

1/ 2"

5 1/2"

FRONT SECTION-ELEVATION

PLAN ELEVATION

POST

6"

FRONT ELEVATION ON SLOPE

FINISH GRADE

RAILS

SALVAGE AND REINSTALL ALL EXISTING FINIALS

END PICKET TO BE CENTERED ON POST, TYP.

POSTS AND PICKETS SHALL

REMAIN UPRIGHT ON ALL SLOPES

THROUGHOUT THE CEMETERY.

1/

2"

1/ 2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca c iv il\

_0 ca d fil es s he et s\

1_ de ta ils

.d w dv an av ed

:5 /4

/2

1:

lo t:5

/4 /2

2:

P M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

DETAILS

C-503

1 WOOD FENCE DETAIL, BACK

1" = 1' 2 WOOD FENCE DETAIL, FRONT & PLAN

1" = 1' 3 WOOD FENCE DETAIL, SECTION

1" = 1'

CS503

CS503

CS503

CS503

CS503

4 WOOD FENCE DETAIL, FRONT ON SLOPE

1" = 1'

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

2' F

R O

M B

AC

K

O F

C U

R B

TO

F

EN

C

E

LI

N E

3' F

R O

M F

EN

C

E

LI

N E

3' F

R O

M F

EN

C

E

LI

N E

3' F

R O

M F

EN

C

E

LI

N E

3' F

R O

M F

EN

C

E

LI

N E

2' F

R O

M B

AC

K

O F

C U

R B

TO

F

EN

C

E

LI

N E

3' F

RO

M

F

EN

CE

L

IN

E

3' F

R O

M B

AC

K

O F

C U

R B

3' F

R O

M B

AC

K

O F

C U

R B 3'

F R

O M

B

AC

K O

F C

U R

B

3' F

R O

M B

AC

K

O F

C U

R B

3' F

R O

M B

AC

K

O F

C U

R B

2' F

R O

M B

AC

K

O F

C U

R B

Af

Mg

Me

Me

Mg

Af

Me

Ru

Ru

Ra

Ra 34

Ra

Ra

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 v a nc a

- m ar e is la nd c em et er y im pr ov em en ts ca la c ad fi le s\ _0 sh ee ts

\1

_p ln t.d w js ch m itz er le av ed :4

/2 8/

:1

PM

lo t:5 /4

/2

2:

P

M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18181Date:

Office of Design and Construction

Services

MARE ISLAND NAVAL CEMETERY

962-003

MAY 04, 2026

IMHOFF ROAD, VALLEJO, CA, 94592

BID DOCUMENTS

BID DOCUMENTS

2026.05.04

GEOTECHNICAL/HAZMAT/

ENVIRONMENTAL:

TERRACON

1900 GARDEN ROAD SUITE 210

MONTEREY, CA 93940

831-574-7013

POINT OF CONTACT

JESS SUTTON

COST ESTIMATING:

OCMI

8851 RESEARCH DRIVE

IRVINE, CA 92618

702-339-9870

POINT OF CONTACT

ALLICIA WARNER

IRRIGATION:

EC DESIGN

400 5TH STREET

WEST DES MOINES, IA 50265

515-225-6365

POINT OF CONTACT

LISA ESSY

CONSERVATOR:

ARCHITECTURAL RESOURCES GROUP

PIER 9, THE EMBARCADERO SUITE 107

SAN FRANSISCO, CA 94111

415-421-1680

POINT OF CONTACT

JENNIFER PONT

N

0 20' 40'

LEGEND

RESTORATION SITE PLAN

LP101

PROPERTY LIMITS

CONSTRUCTION LIMITS

BURIAL AREA

FENCE

SOD WITH IRRIGATION

HYDROMULCH

ROCK MULCH

RETAINING WALL

FLOWER WATERING STATION

M

AT

C H

LI

N

E

- S

H

EE

T

LP

BF DV

SYMBOL CODE QTY COMMON / BOTANICAL NAME CONT. SIZE

TREES

Af 10 PEPPERMINT TREE

AGONIS FLEXUOSA B&B 2 - 1/2" CAL.

Mg 5 GREEN SHOWERS MAYTEN TREE

MAYTENUS BOARIA 'GREEN SHOWERS' B&B 2 - 1/2" CAL.

Me 11 NEW ZEALAND CHRISTMAS TREE

METROSIDEROS EXCELSA B&B 2 - 1/2" CAL.

SYMBOL CODE QTY COMMON / BOTANICAL NAME CONT SIZE

DECIDUOUS SHRUBS

Ru 94 SUNBEAM VERANDA® ROSE

ROSA X 'KORFLOCI52' CONT. 2 GAL.

Ra 166 JOLIE VERANDA® ROSE

ROSA X 'KORFLOCI54' CONT. 2 GAL.

PLANT SCHEDULE CEMETERY

File details come from the government source that posted it. Updated .