962-003_Mare Island_SPEC_ADD 005_06-04-2026.pdf

PDF 1 MB Posted

Attached to
Project # 962CM3003 | Cemetery Improvement Project at Mare Island Naval Cemetery
Solicitation number
36C78626R0059_1
Issued by

About this file

This is a specification addendum document (Amendment 005) for the Cemetery Improvement Project at Mare Island Naval Cemetery. The addendum modifies the original solicitation (36C78626R0059_1) issued by the Department of Veterans Affairs National Cemetery Administration for cemetery improvements at 167 O'Hara Court, Vallejo, California. The project's estimated construction magnitude ranges between $5,000,000 and $10,000,000, requiring an offer guarantee (bid bond) per FAR 28.101-1, along with payment and performance bonds per FAR Part 28.

The document represents the fifth amendment to the solicitation, following previous amendments published on 5/14/2026 (Amendment 001), 5/19/2026 (Amendment 002), and 6/8/2026 (Amendment 003). Amendment 005 was published on 6/4/2026 and provides specification modifications or clarifications to the contract requirements. The mandatory site visit was scheduled for 5/18/2026 at 10:30 AM PST. Request for Information (RFI) submissions to the Contracting Officer were due no later than 5/29/2026 at 3:00 PM EST, with no additional questions accepted after that deadline unless authorized by the CO. Contractors should reference all amendments in conjunction with the base solicitation documents when preparing proposals.

View the file

Other files

File Type Posted
Revision_Log_ 962-003_Mare Island_ADD 005.pdf PDF
36C78626R0059 0004 - Amendment.pdf PDF
RFI_Log_ 962-003_Mare Island_ADD 005.pdf PDF
Part 5 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
Part 4 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
Part 1 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
Part 3 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
Part 2 of 5 - 962-003_Mare Island_ADD 005_2026-06-04.pdf PDF
36C78626R0059 0003 - Amendment.pdf PDF
Site Visit Attendance Sheet.jpeg JPEG file
SF24_Bid Bond.pdf PDF
36C78626R0059 0002 - Amendment.pdf PDF
RFI_Form_rev1.pdf PDF
Mare Island NC Construction SCOPE OF WORK.pdf PDF
36C78626R0059 0001 - Amendment.pdf PDF
RFI_Form.pdf PDF
Attachment_Project_Sample_Template.docx DOCX document
Part 4 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 7 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Wage Determination_Solano County CA.txt TXT text file
962-003_Mare Island_Geotechnical Report_2025-05-12.pdf PDF
36C78626R0059_1_Solicitation.pdf PDF
DOL Certified Payroll Form.pdf PDF
Part 9 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
SF1413.pdf PDF
962-003_Mare Island_SPEC FULL_BD_05-04-2026.pdf PDF
Part 1 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 6 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 3 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 8 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Part 5 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Past Performance Questionnaire.docx DOCX document
Part 2 of 9 - 962-003_Mare Island_BD_FULL_2026-05-104.pdf PDF
Price Proposal Breakdown.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCA Mare Island Naval Cemetery NCA Project 962-003

Mare Island Cemetery Improvement JUNE 05, 2026

Imhoff Road BID DOCUMENT

Vallejo, CA 94592 VERSION 06-01-25

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 02 General Requirements (Minor) 11-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 01-24 01 33 23 Shop Drawings, Product Data, and Samples 06-25

01 35 91 Historic Preservation Treatment Procedures -

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 10-23

01 57 19 Temporary Environmental Controls 01-21

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 01 30 Concrete Repair and Restoration

03 30 53 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21

04 01 41 Stone Masonry Repair and Restoration

04 01 42 Brick Masonry Repair and Restoration

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

DIVISION 05 - METALS

05 01 00 Repair and Restoration of Metals

DIVISION 10 - SPECIALITIES

10 75 00 Flagpoles

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

Imhoff Road BID DOCUMENT

Vallejo, CA 94592 VERSION 06-01-25

00 01 10-2

SECTION NO DIVISION AND SECTION TITLES DATE

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 41 Underground Electrical Construction 06-25

26 08 00 Commissioning of Electrical Systems 11-22

26 09 23 Lighting Controls 11-22

26 24 16 Panel Boards 11-22

26 27 26 Wiring Devices 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 43 13 Surge Protective Devices 11-22

26 56 00 Exterior Lighting 01-22

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 23 00 Video Surveillance 09-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

31 20 12 Raise and Realign Headstones 09-25

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 14 16 Brick Unit Paving 09-15

32 14 43 Decomposed Granite Walkway 09-15

32 17 23 Pavement Markings 08-16

32 31 19 Decorative Metal Fence and Gate 11-16

32 31 29 Wooden Fence and Gate 09-25

32 33 00 Site Furnishings 01-17

32 84 00 Planting Irrigation 08-16

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 03-17

33 40 00 Storm Sewer Utilities 12-17

Mare Island Cemetery Improvement JUNE 5, 2026

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 10-01-23

01 45 35-1

SECTION 01 45 35

SPECIAL INSPECTIONS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This guide specification will be applicable to both new buildings and existing building rehabilitations/renovations. In addition to the

Special Inspection and testing specified requirements, a registered design professional must perform structural observations during construction. All observed deficiencies will be immediately reported to the Contracting Officer. The registered design professional performing these observations will be a representative of the Designer of Record

(DOR) for the building being constructed.

B. Structural observations are required for the following project conditions per IBC Chapter 17 U.N.O.:

1. Seismic Design Category D, E or F; and assigned to Risk Cat III, IV or V.

2. Seismic Design Category D, E or F; and with a height greater than

22860 mm 75 ft.

3. Seismic Design Category E, assigned to Risk Category I or II and the building is greater than two stories above grade plane.

4. Nominal design wind speed in excess of 49 m/sec 110 mph; and assigned to Risk Cat III, IV or V.

5. Nominal design wind speed in excess of 49 m/sec 110 mph; and with a height greater than 23 m 75 ft.

1.2 APPLICABLE PUBLICATIONS

A. The publication listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

B. American Society of Civil Engineers (ASCE)

1. ASCE 7 - (2022) Minimum Design Loads for Buildings and Other

Structures

C. International Code Council (ICC)

2. ICC IBC - (2024) International Building Code

01 45 35-2

1.3 GENERAL REQUIREMENTS

A. Perform Special Inspections in accordance with the Statement of Special

Inspections, Schedule of Special Inspections and Chapter 17 of ICC IBC.

The Statement of Special Inspections and Schedule of Special Inspections are included as an attachment to this specification. Special Inspections are to be performed by an independent third party and are intended to ensure that the work of the prime contractor is in accordance with the

Contract Documents and applicable building codes. Special inspections do not take the place of the three phases of control inspections performed by the Contractor's QC Manager or any testing and inspections required by other sections of the specifications.

B. Structural observations will be performed by the Government. The contractor must provide notification to the Contracting Officer 14 days prior to the following points of construction that structural observations need to occur:

1. The Government shall perform structural observations during construction of the planned retaining walls and footing/foundation.

1.4 DEFINITIONS

A. Continuous Special Inspections – The constant monitoring of specific tasks by a special inspector. These inspections must be carried out continuously over the duration of the particular tasks.

B. Periodic Special Inspections – Special Inspections by the special inspector who is intermittently present where the work to be inspected has been or is being performed. Specific time interval on a specific

Special Inspection should be indicated on the Schedule of Special

Inspections.

C. Observe – Observe these Special Inspections items on a random daily basis. Operations need not be delayed pending these inspections.

D. Special Inspector (SI) – A qualified person retained by the contractor and approved by the Contracting Officer as having the competence necessary to inspect a particular type of construction requiring

Special Inspections. The SI must be an independent third party hired directly by the Prime Contractor.

E. Associate Special Inspector (ASI) – A qualified person who assists the

SI in performing Special Inspections but must perform inspection under

01 45 35-3 the direct supervision of the SI and cannot perform inspections without the SI on site.

F. Third Party – A third party inspector must not be company employee of the Contractor or any Sub-Contractor performing the work to be inspected.

G. Special Inspector of Record (SIOR) – SIOR must be an independent third party hired directly by the Prime Contractor and is required for the following project conditions or as specified on the structural drawings:

1. Seismic Design Category D, E, or F; and assigned to Risk Category

III, IV, or V.

2. Seismic Design Category D, E, or F; and with a height greater than

22860mm 75 ft.

3. Seismic Design Category E, assigned to Risk Category I or II and the building is greater than two (2) stories above grade plane.

4. Nominal design wind speed in excess of 49 m/sec 100 mph; and assigned to Risk Category III, IV, or V.

5. Nominal design wind speed in excess of 49 mm/sec 100mph; and with a height greater than 23m 75ft.

6. In addition to these conditions, the DOR is encouraged to consider using an SIOR on large magnitude or critical projects where this additional level of quality control is affordable.

H. Contracting Officer – The Government official having overall authority for administrative contracting actions. Certain contracting actions may be delegated to the Contracting Officer's Representative (COR).

I. Contractor’s Quality Control (QC) Manager – An individual retained by the prime contractor and qualified in accordance with the Section 01 45

00.00 10 QUALITY CONTROL having the overall responsibility for the contractor's QC organization.

J. Designer of Record (DOR) – A registered design professional is contracted by the Government as an A/E responsible for the overall design and review of submittal documents prepared by others. The DOR is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws in state in which the design professional works. The

01 45 35-4

DOR is also referred to as the Engineer of Record (EOR) in design code documents.

K. Statement of Special Inspections (SSI) – A document developed by the

DOR identifying the material, systems, components and work required to have Special Inspections and covering the following:

1. List of the Architectural Designated Seismic Systems – these components are in or attached to a Risk Category IV or V structure and are needed for continued operation of the facility or their failure could impair the continued operation of the facility.

2. List of the Mechanical Designated Seismic Systems

a. For Seismic Design Category C or Risk V, list the following:

1) Heating, ventilation, and air-conditioning (HVAC) ductwork containing hazardous materials and anchorage of such ductwork

2) Piping systems and mechanical units containing flammable, combustible, or highly toxic materials.

b. For Seismic Design Category D, E, or F or Risk Category V list mechanical system that meet one of the following:

1) Life safety component required to function after an earthquake

2) Component that contains hazardous content,

3) All components in an essential facility needed for continued operation after an earthquake.

3. List of the Electrical Designated Systems

a. For Seismic Design Category C or Risk V, list the anchorage of electrical equipment used for emergency or standby power systems.

b. For Seismic Design Category D, E or F list electrical system that meet one of the following:

1) Life safety component required to function after an earthquake

2) Component that contains hazardous content,

3) All components in an essential facility needed for continued operation after an earthquake.

4. List of elements that are part of the progressive collapse resistance system.

a. Provide a description of the following as they apply:

01 45 35-5

1) Elements of the tie force system consisting of internal longitudinal and transverse, vertical, and peripheral tie.

2) Elements of the alternate path system.

3) Elements having enhanced local resistance. The Statement of

Special Inspections and the Schedule of Special Inspections will be included as an attachment to this specification

a) Schedule of Special Inspections – A schedule which lists each of the required Special Inspections, the extent to which each Special Inspections is to be performed, and the required frequency for each in accordance with ICC

IBC Chapter 17. Template found here:

Schedule of SI Template.docx

Statement of SI Template.xlsx

b) Designated Seismic System – Those nonstructural components that require design in accordance with ASCE 7

Chapter 13 and for which the component importance factor, Ip, is greater than 1.0. This designation applies to systems that are required to be operational following the

Design Earthquake for RC I - IV structures and following the MCER for RC V structures. All systems in RC V facilities designated as MC-1 in accordance with UFC 3-

310-04 are considered part of the Designated Seismic

Systems. Designated Seismic Systems will be identified by

Owner and will have an Importance Factor Ip = 1.5

L. Submittals: Government approval is required for all submittals. CQC

Special Inspection reports shall be submitted under this Specification section and follow the [Special Inspection]: [Applicable Specification section or description] naming convention. Submit the following:

1. SD-01 Preconstruction Submittals;

2. SIOR Letter of Acceptance;

3. Special Inspections Project Manual;

4. Special Inspections Agency's Written Practices

5. NDT Procedures and Equipment’ Calibration Records;

6. SD-06 Test Reports;

01 45 35-6

7. Special Inspections

8. Daily Reports;

9. Special Inspections; Biweekly Reports;

10. SD-07 Certificates;

11. Fabrication Plant N/A

12. Steel Truss Plant; N/A

13. Wood Truss Plant; N/A

14. AC472 Accreditation;

15. Steel Joist Institute Membership; N/A

16. Precast Concrete Institute (PCI) Certified Plant; N/A

17. Certificate of Compliance;

18. Special Inspector of Record Qualifications;

19. Special Inspector Qualifications;

20. Qualification Records for NDT technicians;

21. SD-11 Closeout Submittals;

22. Interim Final Report of Special Inspections;

23. Comprehensive Final Report of Special Inspections;

M. Special Inspector Qualifications: Submit qualifications for each SI, ASI, and the SIOR from the following certifying associations:

Associated Air Balance Council (AABC); American Concrete Institute

(ACI); Association of the Wall and Ceiling Industry (AWCI); American

Welding Society (AWS); Factory Mutual (FM); International Code Council

(ICC); Nondestructive Testing (NDT); National Institute for

Certification in Engineering Technologies (NICET); Precast/Prestressed

Concrete Institute (PCI); Post-Tensioning Institute (PTI); Underwriters

Laboratories (UL). Qualifications should be in accordance with the following minimums.

01 45 35-7

QUALIFICATIONS

Area Special Inspector Associated Special

Inspector

SIOR

Steel

Construction and

High Strength

Bolting

N/A

ICC Structural Steel and Bolting Special

Inspector certificate with on year of related experience, or

Registered

Professional

Engineer with related experience.

Engineer-In-Training with one year of related experience.

Welding

Structural Steel

(For highly complex steel use only AWS

Certified

Welding

Inspectors) N/A

ICC Welding Special

Inspector certificate with one year of related experience or AWS

Certified Welding

Inspector

AWS Certified

Associate Welding

Inspector

Nondestructive

Testing of Welds

N/A

NDT Level II

Certificate

NDT Level II

Certificate plus one year of related experience

Cold Formed

Steel Framing

N/A

ICC Structural Steel and Bolting Special

Inspector certificate with on year of related experience, or ICC

Commercial Building

Inspector with one year of experience;

or Registered

Professional

Engineer with related experience.

Engineer-In-Training

01 45 35-8

Area Special Inspector Associated Special

Inspector

SIOR

Concrete

Construction

ICC Reinforced

Concrete Special

Inspector

Certificate with one year of related experience, or ACI

Concrete

Construction Special

Inspector, or NICET

Concrete Technician

Level III

Certificate in

Construction

Materials Testing, or, Registered

Professional

Engineer with related experience

ACI Concrete

Construction Special

Inspector in

Training, or

Engineer-In-Training related experience

Prestressed

Concrete

Construction

N/A

ICC Pre-stressed

Special Inspector

Certificate with one year of related experience, or PCI

Quality Control

Technician/

Inspector Level II

Certificate with one year of related experience, or

Registered

Professional

Engineer with related experience.

PCI Quality Control

Technician/ Inspector

Level I Certificate with one year of related experience, or Engineer-In-

Training with one year of related experience

Post-Tensioned

Concrete

Construction

N/A

PTI Level 2 Unbonded

PT Inspector

Certificate, or

Registered

Professional

Engineer with related experience

PTI Level 1 Unbonded

PT Inspector

Certificate with one year of related experience, or

Engineer-In-Training

01 45 35-9

Associated Special

Inspector

SIOR

Masonry

Construction N/A

ICC Structural

Masonry Special

Inspector

Certificate with one year of related experience, or

Registered

Professional

Engineer with related experience

Engineer-In-Training

Wood N/A ICC Commercial

Building Inspector

Certificate with one year of related experience, or ICC

Residential Building

Inspector with on year of experience, or Registered

Professional

Engineer with related experience

Engineer-In-Training

Verification of

Site Soil

Condition, Fill

Placement, and

Load-Bearing

Requirements

ICC Soils Special

Inspector

Certificate with one year of related experience, or NICET

Soils Technician

Level II Certificate in Construction

Material Testing, or

NICET Geotechnical

Engineering

Technician Level II

Construction or

Generalist

Certificate, or

Geologist-In-

Training with one year of related experience, or

Registered

Professional

Engineer with related experience

NICET Soils

Technician Level I

Certificate in

Construction Material

Testing with one year of related experience, or NICET

Geotechnical

Engineering

Technician Level I

Construction, or

Generalist

Certificate with one year of related experience, or

Engineer-In-Training

01 45 35-10

Associated Special

Inspector

SIOR

Deep Foundations

N/A

NICET Soils

Technician Level II

Certificate in

Construction

Material Testing, or

NICET Geotechnical

Engineering

Technician Level II

Construction or

Generalist

Certificate, or

Geologist-In-

Training with one year of related experience, or

Registered

Professional

Engineer with related experience

NICET Soils

Technician Level I

Certificate in

Construction Material

Testing with one year of related experience, or NICET

Geotechnical

Engineering

Technician Level I

Construction or

Generalist

Certificate with one year of related experience, or

Engineer-In-Training

Sprayed Fire

Resistant Manual

N/A

ICC Spray-applied

Fireproofing Special

Inspector

Certificate, or ICC

Fire Inspector I

Certificate with one year of related experience, or

Registered

Professional

Engineer with related experience

Engineer-In-Training

Mastic and

Intumescent Fire

Resistant

Coatings N/A

ICC Spray-applied

Fireproofing Special

Inspector

Certificate, or ICC

Fire Inspector I

Certificate with one year of related experience, or

Registered

Professional

Engineer with related experience

Engineer-In-Training

01 45 35-11

Associated Special

Inspector

SIOR

Exterior

Insulation and

Finish Systems

(EIFS)N/A

AWCI EIFS Inspector

Certificate, or

Exterior Design

Institute

Certificate, or

Registered

Professional

Engineer with related experience

Engineer-In-Training

Fire-Resistant

Penetrations and

Joints N/A

Passed the UL

Firestop Exam with one year of related experience, or

Passed the FM

Firestop Exam with one year of related experience, or

Registered

Professional

Engineer with related experience

Engineer-In-Training

Smoke Control

N/A

AABC Technician

Certification with one year of related experience, or

Registered

Professional

Engineer with related experience

Engineer-In-Training

SIOR Registered

Professional

Engineer

PART 2 - PRODUCTS

2.1 FABRICATORS SPECIAL INSPECTION N/A

A. Special Inspections of fabricator's work performed in the fabricator's shop is required to be inspected in accordance with the Statement of

Special Inspections and the Schedule of Special Inspections unless the fabricator is certified by the approved agency to perform such work without Special Inspections. Submit the applicable certification(s) from the following list to the Contracting Officer for information to

01 45 35-12 allow work performed in the fabricator's shop to not be subjected to

Special Inspections.

B. The following certifications meet the requirements for fabricator approval in accordance with paragraph 1704.2.5.2 of IBC:

1. American Institute of Steel Construction (AISC) Certified

Fabrication Plant, Category STD.

2. Truss Plate Institute (TPI) steel truss plate quality assurance program certification.

3. Truss Plate Institute (TPI) wood truss plate quality assurance program certification.

4. International Accreditation Service, AC472 Accreditation Steel Joist

Institute Membership

5. Precast Concrete Institute (PCI) Certified Plant, Group C

C. At the completion of fabrication, submit a certificate of compliance, to be included with the comprehensive final report of Special

Inspections, stating that the materials supplied and work performed by the fabricator are in accordance the construction documents.

PART 3 - EXECUTION

3.1 RESPONSIBILIES MATRIX

Inspector Responsibility Condition

SIOR a. Supervise all Special Inspectors required by the contract documents and the IBC.

b. Submit a SIOR Letter of Acceptance to the Contracting Officer attesting to acceptance of the duties of SIOR, signed and sealed by the

SIOR.

c. Verify the qualifications of all of the Special Inspectors.

d. Verify the qualifications of fabricators.

Applicable when SIOR is required

SIOR e. Submit Special Inspections agency's written practices for the monitoring and control of the agency's operations to include the following:

1. The agency's procedures for the selection and administration of inspection personnel, describing the training, experience and examination requirements for qualifications and certification of inspection personnel.

Applicable when SIOR is required and when the structural design is required to follow

01 45 35-13

Inspector Responsibility Condition

2. The agency's inspection procedures, including general inspection, material controls, and visual welding inspection.

f. Submit qualification records for nondestructive testing (NDT) technicians designated for the project. Submit NDT procedures and equipment calibration records for NDT to be performed and equipment to be used for the project.

AISC341 for seismic design of steel structures

SIOR g. Prepare a Special Inspections Project Manual, which will cover the following:

1. Roles and responsibilities of the following individuals during Special Inspections: SIOR, SI, General Contractor, Subcontractors, QC

Manager, and DOR.

2. Organizational chart and/or communication plan, indicating lines of communication

3. Contractor's internal plan for scheduling inspections. Address items such as timeliness of inspection requests, who to contact for inspection requests, and availability of alternate inspectors. Contractor's internal plan for scheduling inspections. Address items such as timeliness of inspection requests, who to contact for inspection requests, and availability of alternate inspectors.

4. Indicate the government reporting procedures.

5. Propose forms or templates to be used by SI and SIOR to document inspections.

6. Indicate procedures for tracking nonconforming work and verification that corrective work is complete.

7. Indicate how the SIOR and/or SI will participate in weekly QC meetings.

8. Indicate how Special Inspections of shop fabricated items will be handled when the fabricator's shop is not certified per paragraph FABRICATOR SPECIAL INSPECTIONS.

9. Include a section in the manual that covers each specific item requiring Special

Inspections that is indicated on the Schedule of Special Inspections. Provide names and qualifications of each special inspector who will be performing the Special Inspections for each specific item. Provide detail on how the Special Inspections are to be carried out

Applicable when SIOR is required

01 45 35-14 for each item so that the expectations are clear for the General Contractor and the

Subcontractor performing the work. Make a copy of the Special Inspections Project

Manual available on the job site during construction. Submit a copy of the Special

Inspections Project Manual for approval.

h. Attend coordination and mutual understanding meeting where the information in the Special

Inspections Project Manual will be reviewed to verify that all parties have a clear understanding of the Special Inspections provisions and the individual duties and responsibilities of each party.

i. Maintain a 3- ring binder for the Special Inspector's daily and biweekly reports and the

Special Inspections Project Manual. This file must be located in a conspicuous place in the project trailer/office to allow review by the

Contracting Officer and the DOR.

j. Submit a copy of the Special Inspector's daily reports to the QC Manager.

k. Discrepancies that are observed during Special Inspections must be reported to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves the site the observed discrepancies must be documented in the daily report.

l. Submit a biweekly Special Inspections report until all work requiring Special Inspections is complete. A report is required for each biweekly period in which Special Inspections activity occurs, and must include the following:

1. A brief summary of the work performed during the reporting time frame.

2. Changes and/or discrepancies with the drawings, specifications, and mechanical or electrical component certification if they require seismic systems, that were observed during the reporting period.

3. Discrepancies which were resolved or corrected.

4. A list of nonconforming items requiring resolution.

5. All applicable test results including nondestructive testing reports.

01 45 35-15

QC Manager a. If there is no SIOR, QC Manager must Supervise all Special Inspectors required by the contract documents and the IBC; Verify the qualifications of all of the Special Inspectors; Verify the qualifications of fabricators; Maintain a 3-ring binder for the Special Inspector's daily and biweekly reports. This file must be located in a conspicuous place in the project trailer/office to allow review by the

Contracting Officer and the DOR.

Applicable when SIOR is not required

QC Manager b. Maintain a rework items list that includes discrepancies noted on the Special Inspectors daily report.

n/a

Special

Inspectors

a. Inspect all elements of the project for which the special inspector is qualified to inspect and are identified in the Schedule of Special

Inspections.

b. Attend preparatory phase meetings related to the Definable Feature of Work (DFOW) for which the special inspector is qualified to inspect.

n/a

Special

Inspectors

c. Submit Special Inspections agency's written practices for the monitoring and control of the agency's operations to include the following:

1. The agency's procedures for the selection and administration of inspection personnel, describing the training, experience and examination requirements for qualifications and certification of inspection personnel.

2. The agency's inspection procedures, including general inspection, material controls, and visual welding inspection.

d. Submit qualification records for nondestructive testing (NDT) technicians designated for the project.

e. Submit NDT procedures and equipment calibration records for NDT to be performed and equipment to be used for the project.]

Applicable when SIOR is

NOT required and when the structural design is required to follow AISC

341 for seismic design of steel structures

Special

Inspectors

f. Submit a copy of the daily reports to the QC Manager.

g. Discrepancies that are observed during Special Inspections must be reported to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves

Applicable not required

01 45 35-16 the site the observed discrepancies must be documented in the daily report.

h. Submit a biweekly Special Inspection Report until all inspections are complete. A report is required for each biweekly period in which

Special Inspections activity occurs, and must include the following:

1. A brief summary of the work performed during the reporting time frame

2. Changes and/or discrepancies with the drawings, specifications, and mechanical or electrical component certification if they require seismic systems that were observed during the reporting period.

3. Discrepancies which were resolved or corrected.

4. A list of nonconforming items requiring resolution.

5. All applicable test result including nondestructive testing reports.

j. At the completion of the project submit a comprehensive final report of Special

Inspections that documents the Special

Inspections completed for the project and corrections of all discrepancies noted in the daily reports. The comprehensive final report of

Special Inspections must be signed, dated and indicate the certification of the special inspector qualifying them to conduct the inspection.

Special

Inspectors

k. Submit daily reports to the SIOR Applicable required

3.2 DEFECTIVE WORK

Check work as it progresses, but failure to detect any defective work or materials must in no way prevent later rejection if defective work or materials are discovered, nor obligate the Government to accept such work.

-- End of Section –

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 1

SECTION 03 30 53

(SHORT FORM) CAST-IN-PLACE CONCRETE

1.1 SUMMARY

A. Section Includes:

1. Cast-in-place structural concrete.

2. Foundation wall infill.

3. Footings.

4. Equipment Pads.

1.2 RELATED WORK

A. Section 01 45 29, TESTING LABORATORY SERVICES: Materials Testing and

Inspection During Construction.

B. Section 07 11 13, BITUMINOUS DAMPPROOFING: Bituminous Dampproofing.

C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS

D. Section 32 05 23, CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS:

Concrete Roads, Walks, and Similar Exterior Site Work.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this Section.

B. American Concrete Institute (ACI):

117-10(R2015)...........Specification for Tolerances for Concrete

Construction and Materials and Commentary

211.1-91(R2009).........Standard Practice for Selecting Proportions for

Normal, Heavyweight, and Mass Concrete.

211.2-98(R2004).........Standard Practice for Selecting Proportions for

Structural Lightweight Concrete.

301/301M-16.............Specifications for Structural Concrete.

305.1-14 - .............Hot Weather Concreting.

306.1-90(R2002).........Cold Weather Concreting.

318/318M-19.............Building Code Requirements for Structural

Concrete and Commentary

347R-14 - ..............Guide to Formwork for Concrete.

SP-66-04-...............ACI Detailing Manual.

C. ASTM International(ASTM):

A615/A615M-20...........Standard Specification for Deformed and Plain

Carbon Steel Bars for Concrete Reinforcement

A996/A996M-16...........Standard Specification for Rail Steel and Axle

Steel Deformed Bars for Concrete Reinforcement

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 2

A1064/A1064M-18a........Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and

Deformed, for Concrete

C33/C33M-18.............Standard Specification for Concrete Aggregates.

C39/C39M-20.............Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.

C94/C94M-20.............Standard Specification for Ready-Mixed

Concrete.

C143/C143M-20...........Standard Test Method for Slump of Hydraulic

Cement Concrete.

C150/C150M-20...........Standard Specification for Portland Cement.

C171-16.................Standard Specification for Sheet Materials for

Curing Concrete.

C192/C192M-19...........Standard practice for Making and Curing

Concrete Test Specimens in the Laboratory.

C219-20a................Standard Terminology Relating to Hydraulic and

Other Inorganic Cements.

C260/C260M-10a(2016)....Standard Specification for Air-Entraining

Admixtures for Concrete.

C330/C330M-17a..........Standard Specification for Lightweight

Aggregates for Structural Concrete.

C494/C494M-19...........Standard Specification for Chemical Admixtures for Concrete.

C618-19 ................Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in

Concrete.

C881/C881M-20 ..........Standard Specification for Epoxy-Resin-Base

Bonding Systems for Concrete.

C989/C989M-18a .........Standard Specification for Slag Cement for Use in Concrete and Mortars.

C1240-20 ..............Standard Specification for Silica Fume Used in

Cementitious Mixtures.

D1751-18 ...............Standard Specification for Preformed Expansion

Joint Fillers for Concrete Paving and

Structural Construction (Non-extruding and

Resilient Bituminous Types).

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 3

E1155-20................Determining FF Floor Flatness and FL Floor

Levelness Numbers.

E1745-17 ...............Standard Specification for Water Vapor

Retarders Used in Contact with Soil or Granular

Fill under Concrete Slabs.

D. International Concrete Repair Institute:

310.2R-2013 -...........Selecting and Specifying Concrete Surface

Preparation for Sealers, Coatings, Polymer

Overlays, and Concrete Repair.

1.4 SUBMITTALS

A. Submittal Procedures: Refer to Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES. All items indicated below are required submittals requiring Contracting Officer’s Representative (COR) review and approval.

B. Submittal Drawings:

1. Submit large scale drawings of reinforcing steel, including all reinforcing bend diagrams and reinforcing details, to the COR for review and approval.

C. Manufacturer's Literature and Data:

1. Concrete Mix Design.

2. Air-entraining admixture, chemical admixtures, and curing compounds.

3. Indicate manufacturer's recommendation for each application.

D. Sustainable Construction Submittals:

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

E. Certificates: Certify products comply with specifications.

1. Each ready mix concrete batch delivered to site.

1.5 DELIVERY

A. Deliver each ready-mixed concrete batch with mix certification in duplicate according to ASTM International(ASTM) C94/C94M.

1.6 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 4

PART 2 - PRODUCTS

2.1 MATERIALS

A. Portland Cement: ASTM C150/C150M, Type I or II.

B. Pozzolans:

1. Fly Ash: ASTM International(ASTM) C618, Class C or F including supplementary optional physical requirements. Pozzolans shall not exceed 25 percent of total cementitious materials by weight.

2. Slag: ASTM International(ASTM) C989/C989M; Grade 80.

3. Silica Fume: ASTM International(ASTM) C1240.

C. Coarse Aggregate: ASTM International(ASTM) C33/C33M.

1. Size 467 for footings and walls over 300 mm (12 inches) thick.

2. Size 67 for other applications.

D. Fine Aggregate: ASTM International(ASTM) C33/C33M.

E. Lightweight Aggregate for Structural Concrete:

ASTM International(ASTM) C330/C330M, Table 1.

F. Mixing Water: Fresh, clean, and potable.

G. Air-Entraining Admixture: ASTM International(ASTM) C260/C260M.

H. Chemical Admixtures: ASTM International(ASTM) C494/C494M.

I. Vapor Barrier: ASTM International(ASTM) E1745, Class A with a minimum puncture resistance of 2200 g (3000 pounds); minimum 0.38 mm (15 mil) thick.

J. Reinforcing Steel: ASTM International(ASTM) A615/A615M or

ASTM International(ASTM) A996/A996M, Grade 420 (60), deformed. See structural drawings for grade. All reinforcing steel shall be epoxy coated.

K. Forms: Wood, plywood, metal, or other materials, approved by

Contracting Officer, of grade or type suitable to obtain type of finish specified.

1. Plywood: Exterior grade, free of defects and patches on contact surface.

2. Lumber: Sound, grade-marked, S4S stress graded softwood.

3. Form coating: As recommended by Contractor.

L. Welded Wire Fabric: ASTM International(ASTM) A1064/A1064M, plain; Grade

65.

M. Expansion Joint Filler: ASTM International(ASTM) D1751.

N. Sheet Materials for Curing Concrete: ASTM International(ASTM) C171.

O. Abrasive Aggregates: Aluminum oxide grains or emery grits.

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 5

P. Liquid Densifier/Sealer: 100 percent active colorless aqueous siliconate solution.

Q. Grout, Non-Shrinking: Premixed ferrous or non-ferrous. Grout to show no settlement or vertical drying shrinkage at 3 days. Compressive strength for grout, at least 18 MPa (2500 psi) at 3 days and 35 MPa (5000 psi) at 28 days.

2.2 ACCESSORIES

A. Bonding Agent: ASTM International (ASTM) C 1059/C 1059M, Type II.

B. Structural Adhesive: ASTM International (ASTM) C881, 2-component material suitable for use on dry or damp surfaces. Provide material

Type, Grade, and Class to suit Project requirements.

C. Water Stops: Rubber base with self-healing properties. Expanding clay based products not acceptable.

D. Weeps: Geotextile type as recommended by Contractor and approved by the COR.

2.3 CONCRETE MIXES

A. Design concrete mixes according to ASTM International (ASTM) C94/C94M, Option C.

B. Compressive strength at 28 days: See structural drawings for compressive strength requirements. Footings, exterior foundation walls, and piers compressive strength at 28 days: minimum 30 MPa (4,000 psi).

C. Submit mix design and results of compression tests to the Contracting

Officer for his evaluation. Identify all materials, including admixtures, making-up the concrete.

D. Maximum Slump for Vibrated Concrete: 100 mm (4 inches) tested according to ASTM International (ASTM) C143.

E. Cement and Water Factor (See Table I):

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete: Strength Non-Air-Entrained Air-Entrained

Min. 28 Day Comp.

Str.

MPa (psi)

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

35 (5000)1,3 375 (630) 0.45 385 (650) 0.40

30 (4000)1,3 325 (550) 0.55 340 (570) 0.50

25 (3000)1,3 280 (470) 0.65 290 (490) 0.55

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 6

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete: Strength Non-Air-Entrained Air-Entrained

Min. 28 Day Comp.

Str.

MPa (psi)

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

25 (3000)1,2 300 (500) See 4 Below 310 (520) See 4 Below

Notes:

1. If trial mixes are used, achieve a compressive strength 8.3 MPa (1 200 psi) in excess of f'c. For concrete strengths greater than 35 MPa (5,000 psi), achieve a compressive strength 9.7 MPa (1,400 psi) in excess of f’c.

2. Lightweight Structural Concrete: Pump mixes may require higher cement values as specified in ACI 318/318M.

3. For Concrete Exposed to High Sulfate Content Soils: Maximum water cement ratio is 0.44.

4. Laboratory Determined according to ACI 211.1 for normal weight concrete or

ACI 211.2 for lightweight structural concrete.

F. Air-entrainment as specified, and conform with the following for air content table:

TABLE II - TOTAL AIR CONTENT FOR VARIOUS SIZES OF COARSE AGGREGATES

Nominal Maximum Size of

Coarse Aggregate

Total Air Content, percent

10 mm (3/8 inches) 6 Moderate exposure; 7.5 severe exposure

13 mm (1/2 inches) 5.5 Moderate exposure; 7 severe exposure

19 mm (3/4 inches) 5 Moderate exposure; 6 severe exposure

25 mm (1 inches) 4.5 Moderate exposure; 6 severe exposure

40 mm (1 1/2 inches) 4.5 Moderate exposure; 5.5 severe exposure

2.4 BATCHING AND MIXING

A. Store, batch, and mix materials according to ASTM C94/C94M.

1. Job-Mixed: Batch mix concrete in stationary mixers as specified in

ASTM International(ASTM) C94/C94M.

2. Ready-Mixed Concrete: Comply with

ASTM International(ASTM) C94/C94M, except use of non-agitating equipment for transporting concrete to Site is not acceptable.

3. EXECUTION Mixing Structural Lightweight Concrete: Charge mixer with

2/3 of total mixing water and total aggregate for each batch. Mix

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 7 ingredients minimum 30 seconds in stationary mixer or minimum 10 revolutions at mixing speed in truck mixer. Add remaining mixing water and other ingredients and continue mixing. Above procedure may be modified as recommended by aggregate producer.

4. When aggregate producer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

PART 3 - EXECUTION

3.1 FORMWORK

A. Installation: Conform to ACI 347. Construct forms to obtain concrete of the shapes, dimensions and profiles indicated, with tight joints.

B. Design and construct forms to prevent bowing-out of forms between supports and to be removable without prying against or otherwise damaging fresh concrete.

C. When patching formed concrete, seal form edges against existing surface to prevent leakage; set forms so that patch is flush with adjacent surfaces.

D. Treating and Wetting: Treat or wet concrete contact surfaces:

1. Prevent water from accumulating and remaining within forms.

2. Clean and coat removable metal forms with light form oil before reinforcement is placed.

3. In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.

4. Prevent water from accumulating and remaining within forms.

E. Inserts, Sleeves, and Similar Items: Install flashing reglets, masonry ties, anchors, inserts, wires, hangers, sleeves, boxes for floor hinges, and other cast-in items specified in other Sections. Place where indicated, square, flush and secured to formwork.

F. Construction Tolerances - General: Install and maintain concrete formwork to assure completion of work within specified tolerances.

G. Adjust or replace completed work exceeding specified tolerances before placing concrete.

3.2 REINFORCEMENT

A. Install concrete reinforcement according to ACI 318 and ACI SP-66.

B. Support and securely tie reinforcing steel to prevent displacement during placing of concrete.

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 8

C. Drilling for Dowels in Existing Concrete: Use sharp bits, drill hole slightly oversize, fill with epoxy grout, inset the dowel, and remove excess epoxy.

3.3 VAPOR BARRIER

A. Except where membrane waterproofing is required, place interior concrete slabs on a continuous vapor barrier.

B. Lap joints 150 mm (6 inches) and seal with a compatible pressure-sensitive tape.

C. Patch punctures and tears.

3.4 PLACING CONCRETE

A. Remove water from excavations before concrete is placed. Remove hardened concrete, debris and other foreign materials from interior of forms, and from inside of mixing and conveying equipment. Obtain approval from Contracting Officer's Representative before placing concrete.

B. Install screeds at required elevations for concrete slabs.

C. Roughen and clean free from laitance, foreign matter, and loose particles before placing new concrete on existing concrete.

1. Blow-out areas with compressed air and immediately coat contact areas with adhesive in compliance with manufacturer's instructions.

D. Place structural concrete according to ACI 301 and ACI 318.

E. Convey concrete from mixer to final place of deposit by method that will prevent segregation or loss of ingredients. Do not deposit, in

Work, concrete that has attained its initial set or has contained its water or cement more than 1 1/2 hours. Do not allow concrete to drop freely more than 1500 mm (5 feet) in unexposed work nor more than

900 mm (3 feet) in exposed work.

F. Place and consolidate concrete in horizontal layers not exceeding

300 mm (12 inches) in thickness. Consolidate concrete by spading, rodding, and mechanical vibrator. Do not secure vibrator to forms or reinforcement. Continuously vibrate during placement of concrete.

G. Concrete Fill in Stair Tread and Landing Pans: Coat steel with bonding agent and fill pans with concrete. Reinforce with 2 inch by 2 inch by

1.6 mm (0.06 inch) welded wire mesh at midpoint.

H. Hot Weather Concrete Placement: As recommended by ACI 305.1 to prevent adversely affecting properties and serviceability of hardened concrete.

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 9

I. Cold Weather Concrete Placement: As recommended by ACI 306.1, to prevent freezing of thin sections less than 300 mm (12 inches) and to permit concrete to gain strength properly.

1. Do not use calcium chloride without written approval from

Contracting Officer's Representative.

3.5 TOLERANCES

A. Slab on Grade Finish Tolerance: Comply with ACI 117, FF-number and

FL-number method.

1. Paragraph 4.8.3, Class A 3 mm (1/8 inches) for offset in form-work.

2. Table R4.8.4, "Flat" 6 mm (1/4 inch) in 3 m (10 feet) for slabs.

3.6 PROTECTION AND CURING

A. Protect exposed surfaces of concrete from premature drying, wash by rain or running water, wind, mechanical damage, and excessive hot or cold temperatures.

B. Curing Methods: Cure concrete with curing compound using wet method with sheets.

C. Formed Concrete Curing: Wet the tops and exposed portions of formed concrete and keep moist until forms are removed.

1. If forms are removed before 14 days after concrete is cast, install sheet curing materials as specified above.

D. Concrete Flatwork Curing:

1. Install sheet materials according to the manufacturer's instructions.

a. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's

Representative consideration.

3.7 FORM REMOVAL

A. Maintain forms in place until concrete is self-supporting, with construction operation loads.

B. Remove fins, laitance and loose material from concrete surfaces when forms are removed. Repair honeycombs, rock pockets, sand runs, spalls, or otherwise damaged surfaces by patching with the same mix as concrete minus the coarse aggregates.

C. Finish to match adjacent surfaces.

3.8 FINISHES

1. Float Finish: exterior, ramps, equipment pads, except as specified.

Imhoff Road BID DOCUMENTS

Vallejo, CA 94592 VERSION 01-01-21

03 30 53 - 10

a. Screen and float to smooth dense finish.

b. After first floating, while surface is still soft, check surfaces for alignment using straightedge or template. Correct high spots by cutting down with trowel or similar tool. Correct low spots by filling in with material same composition as floor finish. Remove any surface projections on floated finish by rubbing or dry grinding. Refloat slab to uniform sandy texture.

2. Broom Finish: Finish exterior slabs, ramps, and stair treads with bristle brush moistened with clear water after surfaces have been floated.

3. Finished Slab Flatness (FF) and Levelness (FL):

a. Slab on Grade: Specified overall value FF 25/FL 20. Minimum local value FF 17/FL 15.

b. Test flatness and levelness according to ASTM E1155.

3.9 SURFACE TREATMENTS

A. Mix and apply the following surface treatments according to manufacturer's instructions.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Slip Resistant Finish:

1. Except where safety nosing and tread coverings are shown, apply abrasive aggregate to treads and platforms of concrete steps and stairs, and to surfaces of exterior concrete ramps and platforms.

a. Broadcast aggregate uniformly over concrete surface. Trowel concrete surface to smooth dense finish. After curing, rub treated surface with abrasive brick and water sufficiently to slightly expose abrasive aggregate.

- - E N D - -

Mare Island Naval Cemetery 05 01 00 - 1 Repair and Restoration of Metals

SECTION 05 01 00

REPAIR AND RESTORATION OF METALS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Repair and rehabilitation of existing metal fabrications, including:

1. All ferrous (wrought iron and cast iron) metal components.

2. All non-ferrous (bronze) metal components.

B. Scope of historic treatment as follows:

1. Cleaning metal.

2. Removing corrosion.

3. Removing paint.

4. Priming and painting.

5. Application of wax and lacquer on non-ferrous metal components.

6. Fabrication of missing elements.

1.02 RELATED REQUIREMENTS

A. Section 01 35 91 - Historic Preservation Treatment Procedures B. Section 04 01 41 - Stone Masonry Repair and Restoration C. Section 04 01 42 - Brick Masonry Repair and Restoration

1.03 REFERENCE STANDARDS

A. Work of this Section shall comply with requirements of this Section and with requirements and recommendations of most recent version of each of standards listed below, which shall have same force and effect as if written out in full herein.

1. Conflicts: In case of conflict between requirements of standards and/or between requirements of standards and requirements of this Section, most stringent and restrictive requirement shall govern in each case.

2. Availability: Provide copies of following standards at facility and Project site where Work of this Section is performed and make standards available for reference.

B. Society for Protective Coatings (SSPC).

1. SSPC-PA1 - Paint Application Specification No. 1, Shop, Field and Maintenance Painting.

2. SSPC-PA2 - Measurement of Dry Coating Thickness with Magnetic Gages.

3. SSPC-SP1 - Solvent Cleaning.

4. SSPC-SP2 - Hand Tool Cleaning.

5. SSPC-SP3 - Power Tool Cleaning.

6. SSPC-SP10/NACE 2 - Near-White Commercial Blast Cleaning.

7. SSPC-SP11 - Power Tool Cleaning to Bare Metal.

8. SSPC-VIS1 - Visual Standard for Abrasive Blast Cleaned Steel.

C. Industrial Fasteners Institute (IFI), Handbook on Bolt, Nut and Rivet Standards.

D. International Organization for Standardization (ISO): ISO 8502-3: Preparation of Steel

Substrates Before Application of Paints and Related Products.

E. M.D. Bowman, A.M. Piskorowski, "Evaluation and Repair of Wrought Iron and Steel Structures in Indiana," Joint Transportation Research Program Project No. C-36-SGJJJ, File No. 7-4-61 SPR-2655; Purdue University, 2004 (FHWA/IN/JTRP 2004).

F. National Association of Architectural Metal Manufacturers (NAAMM), Metal Finishes Manual.

G. New York Landmarks Conservancy, The Maintenance and Repair of Architectural Cast Iron.

H. National Park Service Preservation Briefs: "The Maintenance and Repair of Architectural Cast

Iron," Preservation Brief #27, Preservation Assistance Division, NPS, 1991.

Mare Island Naval Cemetery 05 01 00 - 2 Repair and Restoration of Metals

1.04 ADMINISTRATIVE REQUIREMENTS

A. Coordination: Coordinate repair and restoration of metals with other trade involved in other work, including but not limited to, stone masonry repair and restoration.

1.05 SUBMITTALS

A. Work Description: Submit written program for repair and restoration of metals, including protection of surrounding materials and site during operations. Describe in detail materials, methods and equipment to be used.

B. Product Data: Provide complete list of all products to be used, with the following information for each.

1. Recommendations for application and use.

2. Instructions for storage and handling.

3. Manufacturer's specifications and test data, Safety Sata Sheets, and certifications sustaining that products comply with requirements.

4. Analysis of wrought and cast iron alloys present, and proposed replacement alloys.

C. Sample:

1. Representative sample of new castings, showing typical sizing and detail.

2. Draw downs for all opaque finishes.

D. Shop Drawings:

1. Submit shop drawings for elements indicated for…

This is the start of the file's text. The full file is on GovTribe.