NSB_-_Corbin_Park_-_Scope.docx

DOCX document 20 KB Posted

Attached to
CDBG-DR New Smyrna Beach Corbin Park Stormwater Improvements Construction
Solicitation number
26-B-20KW
Issued by
Volusia County, Florida

About this file

This is a Scope of Work document for Volusia County's Office of Recovery and Resiliency related to the New Smyrna Beach Corbin Park Stormwater Improvements Construction project, a federally funded infrastructure rehabilitation initiative. The project encompasses extensive drainage system improvements including installation of thousands of feet of conveyance piping, multiple inlet structures and manholes, treatment swales, outfall structures equipped with backflow preventors, utility relocations, and roadway replacement across approximately 8,600 linear feet. The design and permitting phase is expected to be completed by December 2024, with construction commencing in spring 2025 and lasting three years. The non-mandatory pre-bid meeting is scheduled for December 1, 2025, at 3:00 pm with virtual attendance available via Microsoft Teams. Bidders must submit questions electronically through the County's eProcurement Portal by December 9, 2025, at 11:59 pm, with bid submissions due December 23, 2025, at 3:01 pm. The project requires substantial completion within 600 days with final completion required 30 days thereafter.

The estimated total construction cost is $8,451,220, with the contract awarded to the lowest responsive and responsible bidder. This is a federally assisted CDBG-DR project funded through the U.S. Department of Housing and Urban Development to support recovery from Hurricane Ian in September 2022. Federal labor standards are mandatory, including Davis-Bacon Act prevailing wage requirements and Copeland Act anti-kickback provisions with weekly certified payroll reporting. Section 3 and Minority/Women-Owned Business Enterprise (M/WBE) participation is required, with 25 percent of total labor hours to be performed by Section 3 workers and 5 percent by Targeted Section 3 workers. Bidders must provide a 5 percent bid bond and obtain Payment and Performance Bonds equal to 100 percent of the contract price. Additional requirements include E-Verify registration, comprehensive insurance coverage, and federal bonding compliance under 24 CFR 85.36. Liquidated damages are established at $3,813 per day for delays beyond the substantial completion date.

View the file

Other files

File Type Posted
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
CDBG-DR_New_Smyrna_Beach_Corbin_Park_Stormwater_Improvements_Construction.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
26-B-20KW,_Specifications.pdf PDF
Draft_Contract.pdf PDF
Project_Sign.pdf PDF
Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
26-B-20KW,_Plans.pdf PDF
Insurance_Requiremnts.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Corbin_Park_-_Bid_Set_Specifications.pdf PDF
Corbin_Park_-_Bid_Set_Drawings.pdf PDF
Corbin_Park_-_Engineering_Drawings.pdf PDF
SJRWMD_General_Permit.pdf PDF
Corbin_Park_-_Bid_Form.xlsx XLSX spreadsheet
NSB_-_Corbin_Park_-_Scope.docx DOCX document
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The project entails installation of extensive drainage improvements including several thousand feet of conveyance pipe, numerous inlet structures and manholes to redirect the stormwater away from properties as well as treatment swales, additional outfall structures equipped with backflow preventors along with the required utility relocates and roadway replacement needed to install the drainage improvements. The design and permitting expected phase to be completed by December 2024. With a 3-year construction commencing in the spring of 2025.

File details come from the government source that posted it. Updated .