Nautilus Park - 2019 LCR.pdf

PDF 7 MB Posted

Attached to
Water Testing Services - Naval Submarine Base New London
Solicitation number
N4008521R2561
Issued by

View the file

Other files

File Type Posted
RFI PART III Clarifications.pdf PDF
Amendment 0008.pdf PDF
RFI Responses Part III.pdf PDF
Amendment 0007.pdf PDF
SIU GP 20210524 - DRAFT 3.pdf PDF
Amendment 0006.pdf PDF
RFI Responses Part II.docx DOCX document
1800000-C Water Testing PWS.pdf PDF
RFI RESPONSES Part I.pdf PDF
J-0200000-02 Wage Determ.pdf PDF
Amendment 0005.pdf PDF
0200000 C Management and Admin.pdf PDF
Amendment 0004.pdf PDF
SIU GP Reg Final.pdf PDF
J-0200000-08 ELINs Amended.xls XLS spreadsheet
Water Testing Bid Schedule - Amended.xls XLS spreadsheet
Amendment 0003.pdf PDF
NPDES Permit CT0003921.pdf PDF
GP COMP CTCSW0034.pdf PDF
GP Comprehensive Permit.pdf PDF
ARDM Discharge Photo 2.jpg JPG image
Off-Base Maps.pdf PDF
ARDM Discharge Photo.jpg JPG image
Site Visit Information.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
J-0200000-02 Wage Determ.pdf PDF
Nautilus Park - 2019 DDBPR.pdf PDF
J-0200000-5C Contractor Incident Report.pdf PDF
1800000-C Water Testing PWS.pdf PDF
J-0200000-07 Installation Spill Control Plan.pdf PDF
Trident Park-2019 DDBPR.pdf PDF
Drinking Water Example Report.pdf PDF
Trident Park - 2019 RTCR.pdf PDF
Industrial Stormwater SMR Example.pdf PDF
EEP Permitting Fact Sheet.pdf PDF
Cert-141.pdf PDF
Drinking Water Testing Actuals.pdf PDF
NEPA.pdf PDF
N4008521R2561.pdf PDF
Form 5512-1 Base Access.pdf PDF
Conning Towers 2019 RTCR.pdf PDF
Trident Park-2019 LCR.pdf PDF
GP SIU DMR EXAMPLE.pdf PDF
Water Testing Bid Schedule.xls XLS spreadsheet
J-0200000-5A On-Site Labor Summary Report.xls XLS spreadsheet
Main Base - 2019 LCR.pdf PDF
J-0200000-5B Quality Inspection and Surveillance Report.xls XLS spreadsheet
Base Map.pdf PDF
Nautilus Park 2019 RTCR.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT: N62470-14-D-9022

DELIVERY ORDER: N4008518F6644

2019 LEAD AND COPPER RULE

DRINKING WATER MONITORING PLAN UPDATE

NAUTILUS PARK

July 2019

Draft

NAVFAC MID-ATLANTIC

NAVAL SUBMARINE BASE NEW LONDON,

CONNECTICUT

DRAFT

2019 LEAD AND COPPER RULE DRINKING

WATER MONITORING PLAN UPDATE – NAUTILUS

PARK

NAVAL SUBMARINE BASE NEW LONDON,

CONNECTICUT

Prepared For:

Taylor Jones

NAVFAC MIDLANT

9742 MARYLAND AVE

NORFOLK, VA 23511-2095

CONTRACT: N62470-14-D-9022

DELIVERY ORDER: N4008518F6644

July 2019

AH/BC Navy JV, LLC.

11837 Rock Landing Drive, Suite 300 Newport News, Virginia 23606

2019 LCR DRINKING WATER MONITORING PLAN UPDATE

SUBASENLON – NAUTILUS PARK

NAVAL SUBMARINE BASE NEW LONDON, CT TABLE OF CONTENTS

AH/BC Navy JV, LLC. i Draft, July 2019 119-108

1. INTRODUCTION ................................................................................... 1-1

1.1 PURPOSE ................................................................................................1-3

1.2 SITE SPECIFIC SAMPLING PLAN COMPONENTS ...........................................1-4

1.3 PLAN ORGANIZATION ................................................................................1-5

2. SUBASENLON NAUTILUS PARK WATER SYSTEM .......................... 2-1

2.1 SERVICE CONNECTIONS ...........................................................................2-2

3. REGULATORY BACKGROUND .......................................................... 3-1

3.1 LEAD AND COPPER ACTION LEVELS ...........................................................3-3

3.2 LEAD IN PRIORITY AREAS .........................................................................3-4

3.2.1 Lead and Copper in Family Housing ...........................................3-4

4. SAMPLER TRAINING AND SAMPLING PROCEDURES .................... 4-1

4.1 SAMPLER TRAINING AND SAMPLE HANDLING REQUIREMENTS .....................4-1

4.2 QUALITY ASSURANCE/QUALITY CONTROL ..................................................4-3

5. SAMPLING REQUIREMENTS ............................................................. 5-1

5.1 SUBASENLON LCR REQUIRED NUMBER OF TAP SAMPLING SITES ...........5-1

5.2 WHEN TO SAMPLE FOR LEAD AND COPPER ................................................5-4

5.2.1 Lead and Copper Monitoring Waivers .........................................5-5

5.2.2 PM EV Approval of Waiver Application .......................................5-6

5.3 HIERARCHY IN IDENTIFYING SAMPLING LOCATIONS .....................................5-6

5.4 WHERE TO SAMPLE FOR LEAD AND COPPER ..............................................5-8

5.5 SAMPLING PROCEDURES ........................................................................ 5-13

5.6 DOCUMENTATION OF FIELD ACTIVITIES AND OBSERVATIONS ..................... 5-17

5.7 HEALTH AND SAFETY HAZARDS ............................................................... 5-17

6. LCR TEST RESULTS EVALUATION.................................................... 6-1

6.1 SAMPLING RESULTS EVALUATION ..............................................................6-1

6.2 ACTIONS TRIGGERED IF AN AL IS EXCEEDED .............................................6-1

6.3 CONSUMER NOTICE OF LEAD TAP RESULTS ...............................................6-3

6.4 CONSUMER CONFIDENCE REPORT REQUIREMENT .....................................6-3

7. REPORTING, RECORDKEEPING, PUBLIC EDUCATION, AND

NOTIFICATON REQUIREMENTS ........................................................ 7-1

7.1 RECORDKEEPING .....................................................................................7-1

7.2 PUBLIC EDUCATION REQUIREMENT ...........................................................7-1

8. PUBLIC NOTIFICATION ....................................................................... 8-3

8.1 SODIUM LEVEL NOTIFICATION ...................................................................8-6

9. REFERENCES ...................................................................................... 9-1

NAVAL SUBMARINE BASE NEW LONDON, CT TABLE OF CONTENTS

AH/BC Navy JV, LLC. ii Draft, July 2019 119-108

APPENDICES

A. STATEMENT OF WORK

B. LEAD AND COPPER RULE: A QUICK REFERENCE GUIDE (EPA)

C. LEAD ACTION LEVEL-DRINKING WATER NOTIFICATION

D. STATE OF CONNECTICUT CERTIFIED LABORATORIES LIST AND EXAMPLE

CHAIN OF CUSTODY FORM

• D1 – CT Department of Public Health In-state Approved Laboratories Certified to Test Drinking Water

• D2 – Example Chain of Custody Form

E. CONSTRUCTION DATES OF BUILDINGS/LOCATIONS SUBASENLON

NAUTILUS PARK

F. DOD CLARIFICATION OF LEAD AND COPPER RULE SAMPLING PRACTICES

G. PRE-SAMPLING SIGN FOR LEAD AND COPPER SAMPLING

H. LCR CORROSION CONTROL AND COSUMER NOTICE EXAMPLE

TEMPLATES

• H1 – LCR Failure to Install Corrosion Control Notice General Template

• H2 – Consumer Notice of Tap Water Results for Community Water Systems Template

I. GROTON UTILITIES 2017 ANNUAL WATER QUALITY REPORT

J. PUBLIC EDUCATION FOR COMMUNITY WATER SYSTEMS TEMPLATES AND

STATE OF CONNECTICUT DPH INFORMATION DOCUMENT

• J1 – Public Education Pamphlet - Lead in Drinking Water

• J2 – Press Release Template (for SUBASENLON Newsletter)

• J3 – Public Service Announcement Template

• J4 – Lead and Copper Rule: Public Education and Other Public Information Requirements for Community Water Systems

• J5 – State of Connecticut DPH Information Document “Lead in Drinking Wa-ter”

K. PUBLIC NOTIFICATION TIER EXAMPLE TEMPLATES

• K1 – LCR Failure to Conduct Public Education (Tier 2) Public Notification Ex-ample Template

• K2 – Monitoring Violations (Tier 3) Public Notification Example Template

L. SODIUM ACTION LEVEL EXCEEDANCE - DRINKING WATER NOTIFICATION

NAVAL SUBMARINE BASE NEW LONDON, CT TABLE OF CONTENTS

AH/BC Navy JV, LLC. iii Draft, July 2019 119-108

TABLES

TABLE PAGE

Table 1-1 SUBASENLON Water System Information ..........................................1-4 Table 2-1 Nautilus Park Distribution System Pipe Material and Length ................2-2 Table 2-2 GU Service Connections to Nautilus Park Water System ....................2-2 Table 4-1 Sample Handling Requirements ..........................................................4-2 Table 5-1 LCR Standard and Reduced Monitoring for Nautilus Park ...................5-2 Table 5-2 Lead and Copper Summary Monitoring Requirements ........................5-5 Table 5-3 Nautilus Park Lead and Copper Monitoring Sampling Sites .................5-8 Table 5-4 Nautilus Park Monitoring Locations Accessibility ............................... 5-10 Table 5-5 Field Conditions Form ........................................................................ 5-18 Table 8-1 Public Notification Tiers .......................................................................8-3

FIGURES

FIGURE PAGE

Figure 1-1 SUBASENLON Location and Vicinity Map ...........................................1-2 Figure 5-1 LCR Monitoring Frequency Decision Chart ..........................................5-3 Figure 5-2 LCR Sampling Location Map ............................................................. 5-15 Figure 6-1 Follow-up Actions Resulting from Lead and Copper Tap Monitoring ....6-2 Figure 8-1 LCR Public Notification Procedure .......................................................8-5

NAVAL SUBMARINE BASE NEW LONDON, CT TABLE OF CONTENTS

AH/BC Navy JV, LLC. iv Draft, July 2019

This page left blank intentionally.

NAVAL SUBMARINE BASE NEW LONDON, CT ACRONYMS AND ABBREVIATIONS

AH/BC Navy JV, LLC. v Draft, July 2019

ACRONYMS AND ABBREVIATIONS

µS microsiemens

AL action level

AWWA American Water Works Association

BMP best management practice

CCR consumer confidence report

CCT corrosion control treatment

CDC Child Development Center

CFR Code of Federal Regulations

COC chain of custody

CT State of Connecticut

Cu copper

CWS community water system

DPH Department of Public Health

EPA United States Environmental Protection Agency

EV Environmental

FR Federal Register

GU Groton Utilities

ID identification

LCR Lead and Copper Rule

LIPA Lead in Priority Areas

LSLR lead service line replacement

MCLG maximum contaminant level goal

MFR multiple-family residence mg/L milligrams per liter

Na sodium

NAVFAC MIDLANT Naval Facilities Engineering Command, Mid-Atlantic

NAVSEA Naval Sea Systems Command

OPNAVINST Chief of Naval Operations Instruction

Pb lead

PE Public Education

PM Drinking Water Program Manager

PN Public Notification

POE point of entry ppm parts per million

PREVMED Preventive Medicine

NAVAL SUBMARINE BASE NEW LONDON, CT ACRONYMS AND ABBREVIATIONS

AH/BC Navy JV, LLC. vi Draft, July 2019 119-108

PWS public water system

QA quality assurance

QC quality control

SDWA Safe Drinking Water Act

SDWIS The Safe Drinking Water Information System

SM Standard Method

SOP standard operating procedure

SUBASENLON Naval Submarine Base New London

SWT Source Water Monitoring and Treatment

TDS total dissolved solids

WQP water quality parameter

SUBASENLON – NAUTILUS PARK SECTION 1

NAVAL SUBMARINE BASE NEW LONDON, CT INTRODUCTION

AH/BC Navy JV, LLC. 1-1 Draft, July 2019 119-108

1. INTRODUCTION

Originally founded in 1868, the Naval Submarine Base New London (SUBASENLON) is one of the oldest Navy bases still in use today. Located in the town of Groton, it is the Navy’s first Submarine Base and the “Home of the Submarine Force”. In 1916, many United States (US) submarines used the base as a homeport and a place for repair, resupply, and sailors’ rest and recuperation before returning to the front of World

War I. The Naval SUBASENLON is located in the county of New London, Connecticut, along the Thames River occupying more than 687 acres for SUBASENLON Main Base and over 530 acres for housing areas with more than 1,500 Public/Private Venture family housing units.

This Lead and Copper Rule (LCR) sampling monitoring plan covers the US Navy drink-ing water system at the SUBASENLON Nautilus Park housing area. Separate sampling plans for other sites maintained by the SUBASENLON public work department (PWD) are contained in separate documents for each of the following areas:

1. Main Base

2. Trident Park

3. Conning Towers

4. Polaris Park

The potable water system in the housing portion of Dolphin Gardens is owned and maintained by the City of Groton, as was indicated in an agreement between Bal-four Beatty Communities and the City of Groton Utilities (GU), Department of Util-ities dated August 22, 2008. Also, the potable water system in Nautilus Park 3 north of Gungywamp Road is also owned and maintained by the City of Groton based on an agreement between the two aforementioned parties dated February

13, 2007. Therefore, these parts of the system operated by GU in these areas are not included in the scope of task order (see Appendix A for Scope of Work (SOW)).

Figure 1-1 is a location map that shows the SUBASENLON Nautilus Park and other

SUBASENON areas.

NAVAL SUBMARINE BASE NEW LONDON, CT INTRODUCTION

AH/BC Navy JV, LLC. 1-2 Draft, July 2019

Figure 1-1 SUBASENLON Location and Vicinity Map

NAVAL SUBMARINE BASE NEW LONDON, CT INTRODUCTION

AH/BC Navy JV, LLC. 1-3 Draft, July 2019 119-108

SUBASENLON Nautilus Park is not a state-recognized Public Water System (PWS).

Its population includes active duty, reserve and civilian personnel, as well as military families. Under the Safe Drinking Water Act (SDWA), the state or primacy agency is the authority that enforces the SDWA requirements including approvals, monitoring and reporting compliance. In addition to Navy drinking water requirements, the Drinking

Water Program Manager (PM) at Naval Facilities Engineering Command (NAVFAC)

Mid-Atlantic (MIDLANT) serves as the SDWA primacy agency entity.

1.1 PURPOSE

As part of the ongoing effort to ensure the consistent and continuous delivery of safe potable water, as required by the Navy Command; NAVFAC MIDLANT, in cooperation with the Environmental (EV) Division at the SUBASENLON, contracted AH/BC Navy

JV, LLC, to update the drinking water monitoring plan of the SUBASENLON Nautilus

Park water system. This sampling plan reflects the SUBASENLON Nautilus Park com-pliance with the LCR requirements.

The purpose of the Lead and Copper Rule (LCR) is to protect the general population from exposure to Pb and Cu in drinking water and reduce potential health risks. Office of the Chief of Naval Operations Instruction (OPNAVINST) 5090.1D1 requires the up-dating and completion of LCR monitoring requirements. SDWA (40 Code of Federal

Regulations [CFR] §141.86) Subpart I state that the LCR drinking water monitoring plan must contain the elements of monitoring locations, dates, and compliance calculation procedures in the consecutive water distribution system. This LCR sampling plan meets Navy regulations i.e., OPNAVINST 5090.1D and EPA 816-R-10-0042, March

2010 and conforms with common industrial drinking water industry standards and prac-tices, such as the American Water Works Association (AWWA) standards and guid-ance documents.

1 Office of the Chief of Naval Operations Instruction (OPNAVINST) 5090.1D 10 Jan, 2014 2 EPA. March 2010. Lead and Copper Rule Monitoring and Reporting Guidance for Public Water Systems, EPA 816-R-10-004. Internet accessed: 7/17/2019.

https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P100DP2P.txt https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P100DP2P.txt

NAVAL SUBMARINE BASE NEW LONDON, CT INTRODUCTION

AH/BC Navy JV, LLC. 1-4 Draft, July 2019 119-108

This work was performed under Contract Number: N62470-14-D-9022 and Task Order

Number: N4008518F6644, as indicated in the SOW in Appendix A.

1.2 SITE SPECIFIC SAMPLING PLAN COMPONENTS

This LCR sampling plan for SUBASENLON Nautilus Park considers the following com-ponents:

1. Water System Classification: Table 1-1 describes the SUBASENLON Nautilus Park water system classification.

Table 1-1 SUBASENLON Water System Information

Water System Classification Summary

Component Description

System Name SUBASENLON Nautilus Park

PWS

Identification (ID) Number

Not applicable

System Type Inactive (state exempt) consecutive Community Water System

(CWS)

Water Sources List

- including facility Safe Drinking Water

ID*

Master meter customer of GU - PWSID: CT0590011 (GU’s water is supplied from a series of five interconnected reser-voirs covering a watershed of 16 square miles, and also includes three wells. Four reservoirs – Morgan, Ledyard, Poheganut, and Smith Lake - flow into Poquonock, their terminal reservoir)

System’s Owner/Op-erator Contact Infor-mation

Mike Brown, Environmental Division Director

PWD ‐ SUBASENLON

Naval Submarine Base New London Box 44 Groton, CT 06349- Phone: (860) 694-3976, Cell: (860) 287‐7268 Email: michael.brown13@navy.mil

Total Number of Ser-vice Connections:

Population Served ~3,000

Wholesaler (Water Purveyor)

Groton Utilities (PWSID: CT0590011) Groton Utilities, 295 Meridian Street, Groton, CT 06340 T: (860) 446-4000, F: (860) 446-4098

Prepared Date Plan July 2019

Plan Point of Contact Rich Massad (SUBASENLON PWD EV: (860) 694-5140

* As reported under The Safe Drinking Water Information System (SDWIS) https://www3.epa.gov/en-viro/facts/sdwis/search.html mailto:michael.brown13@navy.mil https://www3.epa.gov/enviro/facts/sdwis/search.html https://www3.epa.gov/enviro/facts/sdwis/search.html

NAVAL SUBMARINE BASE NEW LONDON, CT INTRODUCTION

AH/BC Navy JV, LLC. 1-5 Draft, July 2019 119-108

2. Distribution System Map indicates water system components (i.e., layout of dis-tribution mains, city interconnections, and routine sampling sites).

3. Minimum Number of Routine Samples required per monitoring period based on the population served in accordance with 40 Code of Federal Regulations (CFR) 141.21(a)(2) and (a)(3) for SUBASENLON Nautilus Park.

4. Frequency of Sample Collection at each sample site per monitoring period and a sample collection schedule.

Note: In accordance with 40 CFR 141.21(a)(4), the water system is expected to collect samples at regular time intervals throughout the month.

5. Appropriate Sampling Sites within the distribution network that characterize the areas of the distribution system with different water ages, having cross-connec-tion hazards, representing low or no chlorine residuals, and/or representing wa-ter supply to critical/sensitive facilities.

Note: Samples should not be collected from fire hydrants, faucets that point upward (i.e., drinking water fountains), faucets that are corroded or have leaking packing material, swivel type faucets, faucets with threads on the inside of their spouts, faucets with aerators or screens (aerators or screens should be removed with care), automatic faucets, faucets that are close to or below ground level, faucets that are dirty or surrounded by excessive foliage, or taps that are dirty, corroded, or leaking.

Samples should not be collected from a hose or other faucet attachment.

1.3 PLAN ORGANIZATION

Section 2 of this document summarizes the SUBASENLON Nautilus Park water system classification and distribution network information. Section 3 describes the regulatory drivers for the plan, as well as applicable monitoring requirements under OPNAVINST

5090.1D Navy policy and the SDWA 40 CFR §141.21. Section 4 outlines the sampler training and sampling procedures. Section 5 presents LCR sampling requirements.

Section 6 details the LCR test results evaluation. Section 7 presents LCR public record-keeping and reporting requirements. Section 8 presents Public Notification (PN) proce-dures as they apply to SUBASENLON Nautilus Park water system and Section 9 pro-vides a list of references cited in this plan.

NAVAL SUBMARINE BASE NEW LONDON, CT INTRODUCTION

AH/BC Navy JV, LLC. 1-6 Draft, July 2019

SUBASENLON – NAUTILUS PARK SECTION 2

NAVAL SUBMARINE BASE NEW LONDON, CT SUBASENLON NAUTILUS PARK WATER SYSTEM

AH/BC Navy JV, LLC. 2-1 Draft, July 2019 119-108

2. SUBASENLON NAUTILUS PARK WATER SYSTEM

This section identifies the main features of the SUBASENLON Nautilus Park water sys-tem.

The SUBASENLON Nautilus Park water system purchases treated water from the GU

Water Treatment Plant (WTP), a private entity that supplies water to the city and other towns and industrial facilities in the area. The SUBASENLON Nautilus Park provides water to the public, but does not sell water3, is not a carrier, and does not provide treatment (as in additional filtration or by adding disinfectant). The State of Connecticut

Department of Public Health (DPH-CT) September 13, 1993 letter confirmed

SUBASENLON’s status as a service connection or a Master Meter customer to GU and, therefore, exempt from the requirements of the SDWA. Consequently, the DPH-

CT removed SUBASENLON from both the state and federal inventories of PWSs. Un-der the Navy water system certification program, the SUBASENLON Nautilus Park sys-tem is classified as a consecutive CWS.

The SUBASENLON Nautilus Park (1, 2, and 3 south of Gungywamp Road) housing area has a population of approximately 3,000 residents and operates a water distribu-tion system that provides water for human consumption to the base population through pipes and other constructed storage and conveyances.

Table 2-1 summarizes the SUBASENLON Nautilus Park distribution system piping length by material type.

3 If any of the SUBASENLON water systems sells water, that system becomes a regulated PWS subject to the SDWA and CT State primacy regulations. OPNAVINST 5090.1D Section 21-3.3 (b), states the following: ”There is no definition of "selling water" in SDWA however, EPA’s “Operator Certification Guide-lines Implementation Guidance” January 2000 defines selling water as follows: "A distributor of water for human consumption "sells" water within the meaning of the Act if it charges consumers for the water as a separate item or bills separately for the water it provides (House Report No. 93-1185). Conversely, if the entity includes charges for water in the rental fee, then it is not selling water within the context of the Act."

The Navy does not consider reimbursement for distribution system maintenance costs and water from one federal entity to another as selling water; this is merely an internal allocation of funds within the executive branch. The EPA definition above would apply to non-federal consumers including banks, credit unions, private companies, and restaurants to which Navy distributes water.

NAVAL SUBMARINE BASE NEW LONDON, CT SUBASENLON NAUTILUS PARK WATER SYSTEM

AH/BC Navy JV, LLC. 2-2 Draft, July 2019 119-108

Table 2-1 Nautilus Park Distribution System Pipe Material and Length

Miles of Distribution Pipe of Each Material (km) Best Estimate for Construction

Year(s) Asbestos Cement

Cast Iron

Copper Unknown Total

0.31 (0.5) 8.99

(14.4) 4.50 (7.2)

1.71 (2.7) 15.51 (24.8) 1974 and 1994

2.1 SERVICE CONNECTIONS

The DPH-CT classifies SUBASENLON Nautilus Park water system as a service con-nection to GU and does not regulate it as a PWS, consecutive or otherwise, required to monitor water quality. The SUBASENLON Nautilus Park water distribution system receives potable water from GU through four (4) service connections, as summarized in Table 2-2:

Table 2-2 GU Service Connections to Nautilus Park Water System

SUBASENLON

Water System

Number of Service

Connections Location

Nautilus Park 4

Two (2) at Gungywamp Road

One (1) at Arrowood Drive

One (1) at Hickory Drive

The GU WTP source water includes a series of five interconnected reservoirs covering a watershed of 16 square miles (four reservoirs – Morgan, Ledyard, Poheganut and

Smith - flow into Poquonock, the final terminal reservoir) and three backup wells. GU owns and maintains the water meters and the Navy owns the pits (structure, pipe, and cover).

GU has no notices of violation of the SDWA for at least the last 10 years. Therefore, any water quality issues experienced by SUBASENLON Nautilus Park water system customers related to pipe or fittings corrosion, microbial contamination, or lead and copper in drinking water most probably originate within its distribution system.

NAVAL SUBMARINE BASE NEW LONDON, CT SUBASENLON NAUTILUS PARK WATER SYSTEM

AH/BC Navy JV, LLC. 2-3 Draft, July 2019 119-108

The system includes a pumping station, and ground and elevated water storage tanks.

The original distribution system was installed in three phases: Area 1 in 1961, Area 2 in 1962, and Area 3 in 1963. The system is a combined potable and fire protection system. Nautilus Park 1 saw substantial demolition, which included the elimination of all housing units on Walnut Lane and part of Red Oak Road. Other housing units in the area were demolished and replaced between 2007 and 2008. In Nautilus Park 2, Cherry Circle was completely demolished in 2007. Nautilus Park 3 was essentially lev-eled and rebuilt in 2007. Drinking water distribution systems in Nautilus Park 1, 2, and

3 were modified using existing lines wherever possible. All four interconnections with

GU distribution system are metered by GU-owned meters in Navy owned valve vaults.

The GU supplied pressure ranges between 61 and 72 psi. The water distribution sys-tem consists of approximately 15.5 miles (24.9 km) of distribution piping up to 12 inches in diameter. Pipe materials include approximately 58% cast iron, 2% asbestos cement, 29% copper, and 11% unknown.

The Navy requires SUBASENLON Nautilus Park to monitor contaminants (e.g., bacte-riological) that could be contributed by the water distribution system downstream of the interconnection(s) to the primary supplier regardless of a state variance or exemption from regulatory monitoring requirements. This RTCR sampling plan provides a site specific sampling plan for SUBASENLON Nautilus Park. This plan requires periodic updates based on sampling site availability and base population changes.

NAVAL SUBMARINE BASE NEW LONDON, CT SUBASENLON NAUTILUS PARK WATER SYSTEM

AH/BC Navy JV, LLC. 2-4 Draft, July 2019

SUBASENLON – NAUTILUS PARK SECTION 3

NAVAL SUBMARINE BASE NEW LONDON, CT REGULATORY BACKGROUND

AH/BC Navy JV, LLC. 3-1 Draft, July 2019 119-108

3. REGULATORY BACKGROUND

This section summarizes the regulatory requirements applicable to the drinking water systems at SUBASENLON Nautilus Park. Under the SDWA, consecutive

PWSs are not generally subject to the monitoring requirements of the SDWA if they satisfy all of the following criteria specified in the National Primary Drinking Water Reg-ulations (NPDWR) 40 CFR 141.3:

• The PWS consists of only distribution and storage facilities and does not have any collection or treatment facilities

• The PWS obtains all its water from, but is not owned or operated by, a PWS to which the regulations apply

• The PWS does not sell water to any persons

• The PWS is not a carrier that conveys passengers in interstate commerce

All Navy systems, including unregulated consecutive systems, must develop a drinking water LCR sampling plan and consumer notification, in compliance with OPNAVINST

5090.1D4 requirements.

The SDWA and the OPNAVINST 5090.1D (10 January 2014) classify the

SUBASENLON Nautilus Park water system as a PWS and a Community Water System

(CWS). As an exempt consecutive water system, SUBASENLON Nautilus Park water system is not subject to the Connecticut Public Health Code Section 19-13-B102, in-cluding the consecutive system monitoring requirements for Pb and Cu under RCSA

Section 19-13-B102I(7)(A).

Chapter 21 of the Environmental and Natural Resources Program Manual

(OPNAVINST) 5090.1D (10 January 2014) provides environmental guidance for SDWA compliance ashore for Navy installations in the United States. The policies and proce-dures in the manual apply to all Navy personnel and activities within the Chief of Naval

Operations’ chain of command. OPNAVINST 5090.1D states that Navy shore activities shall comply with all applicable federal, state, and local safe drinking water regulations, 4 OPNAVINST 5090.1D dated 10 January 2014 is the most updated version of OPNAVINST 5090.1D.

NAVAL SUBMARINE BASE NEW LONDON, CT REGULATORY BACKGROUND

AH/BC Navy JV, LLC. 3-2 Draft, July 2019 119-108 executive orders, and Navy policy. Section 21-3.4 (c) of OPNAVINST 5090.1D man-dates that all Navy PWSs comply with all applicable requirements for the control of Pb and Cu, as stated in the federal LCR (Subpart I of 40 CFR Part 141), to ensure that levels of Pb and Cu remain below the action levels (ALs) at the consumer's free flowing tap. Per Subpart I of 40 CFR Part 141, if approved by the state regulatory agency or the United States Environmental Protection Agency (EPA) (whichever has primacy), installations may combine their consecutive PWS monitoring plan as part of the suppli-er's plan, instead of treating each as a separate system.

The EPA issued the LCR in 56 Federal Register (FR) 26460 – 26564, June 7, 1991.

The June 1991 LCR was revised with the following technical amendments:

• 56 FR 32112, July 15, 1991

• 57 FR 28785, June 29, 1992

• 59 FR 33860, June 30, 1994

• 65 FR 1950, January 12, 2000 (LCR Minor Revisions)

• 72 FR 57782, October 10, 2007 (LCR Short-Term Revisions)

The LCR5 rule includes the following provisions:

• Pb and Cu monitoring

• Corrosion control treatment (CCT)

• Water quality parameters (WQP) monitoring

• Source water monitoring and treatment (SWT)

• Lead service line replacement (LSLR)

• Reporting (consumer notice of Pb tap results and information in consumer con-fidence report (CCR) of Pb in drinking water) and recordkeeping

The LCR establishes maximum contaminant level goals (MCLGs) for Pb (0 milligrams per liter [mg/L]) and Cu (1.3 mg/L), and mandates treatment techniques that are trig-gered by AL exceedance for Pb (0.015 mg/L) and Cu (1.3 mg/L) based on the 90th percentile of first draw tap water samples. Appendix B includes the EPA quick refer-ence guide and fact sheet for LCR. This monitoring applies to all Navy water systems regardless of state variance or exemptions from regulatory monitoring requirements.

5 United States Environmental Protection Agency Memorandum, Clarification of Recommended Tap Sam-pling Procedures for Purposes of the Lead and Copper Rule, dated 29 February 2016.

NAVAL SUBMARINE BASE NEW LONDON, CT REGULATORY BACKGROUND

AH/BC Navy JV, LLC. 3-3 Draft, July 2019 119-108

3.1 LEAD AND COPPER ACTION LEVELS

The Pb AL is exceeded if the Pb concentration in more than 10 percent of tap water samples collected during any monitoring period conducted per Subpart I of 40 CFR

Part 141 is greater than 0.015 mg/L (i.e., if the 90th percentile Pb level is greater than

0.015 mg/L). The AL is exceeded if Cu concentrations in more than 10 percent of tap water samples collected during any monitoring period conducted per Subpart I of 40

CFR Part 141 is greater than 1.3 mg/L (i.e., if the 90th percentile Cu level is greater than 1.3 mg/L). Appendix C provides a sample Lead Action Level notification including mandatory language.

While an AL exceedance does not constitute a violation, it does trigger the following mandated actions:

As specified in Subpart I of 40 CFR Part 141, if an AL is exceeded, installation PWSs must collect additional WQP samples. Optimal CCT may also be re-quired. Should prescribed treatment options fail to bring Pb levels below the AL, Pb service lines or other water fittings may have to be replaced. If Pb or Cu concentrations exceed the AL of 15 ppb for Pb or 1.3 ppm for Cu in more than 10% of customer taps sampled, the system must undertake a number of additional actions to control corrosion. If the AL for Pb is exceeded, the system must also inform the public about steps they should take to protect their health and may have to replace Pb service lines under their control.

In accordance with 40 CFR 141.82, a CWS serving a population of less than 50,000 is required to perform CCT and WQP monitoring if it exceeds Pb or Cu ALs. The EPA monitoring and reporting guidance (EPA 2010) cites the preamble to the 1991 LCR regarding the responsibilities of the water supplier and the consecutive system. The consecutive system is responsible for Public Education (PE) delivery6. The wholesaler water system (i.e., GU) is responsible for SWT, CCT and WQP monitoring (pH, calcium, alkalinity, silica, orthophosphate, conductivity, and temperature). Requirements for

SWT, CCT, and WQP monitoring do not apply to the consecutive (state-exempt)

SUBASENLON Nautilus Park water system and are beyond its control.

6 Delivery of Public Education Materials for a Community PWS (serving < 3,300) within 60 days after the end of the monitoring period, Instructions for Public Education under the Lead and Copper Rule – (Lead Only). https://www.epa.gov/sites/production/files/2016-08/documents/lcr_pe_cws_lt_3300.pdf.Internet ac-cessed: 06.28.2019

NAVAL SUBMARINE BASE NEW LONDON, CT REGULATORY BACKGROUND

AH/BC Navy JV, LLC. 3-4 Draft, July 2019 119-108

Additionally, as specified in Subpart I of 40 CFR Part 141, water systems that meet the Pb and Cu ALs during specified monitoring periods may reduce the number and frequency of sampling per Subpart I of 40 CFR Part 141.

3.2 LEAD IN PRIORITY AREAS

The 8 February 2014 memorandum titled “Sampling and Testing for Lead in Drinking

Water in Priority Areas” and the follow-up memorandum7 update Navy policy in OPNAV

M-5090.1 on Pb topics including sampling and testing for Pb in drinking water in priority areas at Navy installations. The update requires Navy facilities to sample, test, and maintain test results for all drinking water coolers and outlets in priority areas (Child

Development Centers [CDCs], child development group homes, youth centers, and schools) to determine the presence of Pb. This Lead in Priority Areas (LIPA) policy does not apply to SUBASENLON Nautilus Park because there are no LIPA facilities on this site.

3.2.1 Lead and Copper in Family Housing

Navy consecutive PWSs that serve family housing and are not included in the primary system sampling pool (at the time the primary system performed LCR monitoring), must sample for Pb and Cu. Installations must ensure the number and location of samples are sufficient to be representative of the system and in conformance with LCR proce-dures. This requirement can be waived if Navy installations operating consecutive

PWSs document that the water supplier passed its LCR monitoring and that the water being supplied to it is non-corrosive. There is no requirement to submit a formal waiver, but the system must maintain documentation in drinking water program records8.

7 See the Department of the Navy Director, Energy and Environmental Readiness Division (OPNAV N45), memorandum (Ser N45/14Ul32588) dated 22 March 2019, regarding the subject of Update to Policy on Sampling and Testing for Lead in Drinking Water in Priority Areas.

8 Department of The Navy Office of The Chief of Naval Operations. OPNAVINST 5090.1D. 10-5.2 (d). July 18, 2011.

SUBASENLON – NAUTILUS PARK SECTION 4

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLER TRAINING AND SAMPLING PROCEDURES

AH/BC Navy JV, LLC. 4-1 Draft, July 2019 119-108

4. SAMPLER TRAINING AND SAMPLING PROCEDURES

This section outlines the Standard Operating Procedures (SOPs) and Quality Assur-ance/Quality Control (QA/QC) procedures used by SUBASENLON Nautilus Park staff during LCR sample collection. The sampling SOP is in accordance with the EPA LCR

Monitoring and Reporting Guidance for PWS and Naval Sea Systems Command

(NAVSEA)T0300-AZ-PRO-010 Revision 1. Documentation of field activities and health and safety hazard issues is also included in this section.

If sampling is contracted to the laboratory conducting the analysis, the laboratory’s sampling SOP should be documented. Appendix D provides typical sampling docu-mentation maintained at SUBASENLON Nautilus Park water system, including a sam-ple chain of custody (COC)form and list of outside contractors (e.g., state-certified la-boratory or GU).

4.1 SAMPLER TRAINING AND SAMPLE HANDLING REQUIREMENTS

As a best management practice (BMP), if SUBASENLON Nautilus Park chooses to collect its own samples, only trained individuals should collect LCR samples. Prospec-tive samplers should successfully complete the A-4A-0026 Environmental Quality Sam-pling course offered by the Inter-service Environmental Education Review Board, spon-sored by Civil Engineer Corps Officers' School. The course satisfies Navy training re-quirements for Navy environmental samplers (OPNAVINST 5090.1D) by providing the following training:

• Basic sampling techniques (avoidance of cross-contamination, use of preserv-atives)

• Specific sampling techniques for all environmental media including potable water

• Completion of environmental sampling paperwork (sample container labeling, field log books, COC documentation)

• Health and safety considerations

• Field testing techniques (use of pH meter, temperature indicator)

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLER TRAINING AND SAMPLING PROCEDURES

AH/BC Navy JV, LLC. 4-2 Draft, July 2019 119-108

• Site specific training developed by the state and operator training that supports operator certification

If SUBASENLON Nautilus Park contracts out the sampling, it should maintain a copy of the contract laboratory’s valid state certification form and QA/QC Management Plan in updates of this sampling plan for drinking water testing (as included in Appendix D).

The EPA recommends including trip blanks in at least 10% of the samples collected. In addition, at least 3 blind spikes9 samples should be included during each 6-month mon-itoring period (or other applicable period under reduced monitoring). Table 4-1 presents sample handling requirements.

Table 4-1 Sample Handling Requirements

Parameter Analytical

Method Preservative1 Container2

Maximum Holding Time

Lead

EPA 200.8

EPA 200.9

SM* 3113 B

Concentrated HNO3 to pH <2

1-L certified metal-free glass or poly-ethylene bottles

6 months

Copper

EPA 200.7

EPA 200.8

EPA 200.9

SM 3111 B

SM 3113 B

SM 3120 B

Concentrated HNO3 to pH <2

1-L certified metal-free glass or poly-ethylene bottles

6 months

1) Samplers should not handle nitric acid. Samples will be acidified (generally to pH < 2 with concentrated HNO3) at the laboratory upon receipt of the samples, as soon as possible, but no later than 14 days after sample collection. Samples must stand in the original container used for sampling for at least 28 hours after acidification. The laboratory should match the acid matrix of the samples, QC, and calibra-tion standards for accurate results. The latter two sets of solutions will have the same, fixed concen-tration of acid. The recommended laboratory BMP is to determine by prior tests the amount of acid necessary to achieve a pH <2 and make it consistent with the standards used.

2) Most laboratories will provide sample bottles with proper preservative (acid).

* SM = Standard Method

9 The 3 blind spikes can be ordered from Supelco (of the Sigma-Aldrich Group) and ERA, which can prepare custom spike standards, for examples spiking levels of 5, 10 and 15 micrograms per liter.

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLER TRAINING AND SAMPLING PROCEDURES

AH/BC Navy JV, LLC. 4-3 Draft, July 2019 119-108

4.2 QUALITY ASSURANCE/QUALITY CONTROL

It is essential to follow QA/QC measures during the field sampling. Through the QA/QC program, samples can be tracked from collection through analysis. Sampling infor-mation should be noted in the field and entered into a database. The QA/QC program requirements for sample tracking include the following:

1. Sample identification and labeling

2. Sample collectors training and certification

3. Laboratory record keeping and database format

4. Periodic self-audits of the QA/QC procedures

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLER TRAINING AND SAMPLING PROCEDURES

AH/BC Navy JV, LLC. 4-4 Draft, July 2019

SUBASENLON – NAUTILUS PARK SECTION 5

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-1 Draft, July 2019 119-108

5. SAMPLING REQUIREMENTS

This section presents the LCR monitoring sampling requirements. It identifies

SUBASENLON Nautilus Park sampling locations that have been selected to meet the requirements of 40 CFR 141.86 for LCR sampling as well as the following information:

1. Number of required sample sites

2. When to sample

3. Where to sample

4. Sample collection procedures

5. How to calculate the 90th percentile of Pb and Cu levels

5.1 SUBASENLON LCR REQUIRED NUMBER OF TAP SAMPLING SITES

Based on a served population of 3000, the SUBASENLON Nautilus Park water system is required to collect samples from 20 sites every 6 months for standard monitoring; 10 samples annually or 10 samples triennially (once every three years) for reduced moni-toring; or one sample novennially (once every nine years) with a state (i.e., NAVFAC

MIDLANT PM Environmental (EV)) approved waiver. Table 5-1 summarizes the sam-pling type and number of samples required to meet the criteria outlined in the LCR based on a served population of 3,000 at SUBASENLON Nautilus Park with no moni-toring waivers. Figure 5-1 presents the decision chart for monitoring frequency of Nau-tilus Park.

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-2 Draft, July 2019 119-108

Table 5-1 LCR Standard and Reduced Monitoring for Nautilus Park

SUBASENLON

Site

Monitoring Type con-secutive 6 month

Required Monitoring

Criteria

Nautilus Park

Standard

Monitoring1,2

20 samples every 6 months3

None

Reduced Monitoring

10 samples every year4

90th percentile Pb and Cu levels are at or below both ALs (during two consecutive six-month monitoring periods).

10 samples every 3 years

90th percentile Pb and Cu levels are at or below both ALs for three consecutive years.

1) Monitor every 6 months for Pb and Cu.

2) If the system is on reduced monitoring, it must go back to standard monitoring and monitor water quality parameters when an AL is exceeded. Based on 40 CFR §141.86, the system must monitor water quality parameters every 6 months during the period that follows an AL exceedance. Samples must be representative of water quality throughout the distribution system and include a sample from the entry to the distribution system. Samples must be taken in duplicate for pH, alkalinity, calcium, conductivity or TDS, and water temperatures to allow a corrosivity determination (via an appropriate saturation index); the system must also monitor orthophosphate when a phosphate inhibitor is used and silica when a silicate inhibitor is used.

3) Select sampling sites based on a hierarchical approach. Give priority to single family residences that contain copper pipe with lead solder installed after 1982, contain lead pipes, or are served by lead service lines; then to structures, including multiple-family residences (MFRs), with the foregoing char-acteristics; and finally, residences and structures with copper pipe with lead solder installed before 1983. First draw samples must come from a cold-water kitchen or bathroom tap; non-residential sam-ples must come from an interior tap from which water is typically drawn for consumption.

4) Monitor annually for Pb and Cu if ALs are met during each of two consecutive 6-month monitoring pe-riods. If the system meets the Pb and Cu ALs during three consecutive years, it may reduce the mon-itoring for Pb and Cu from annually to once every three years. Annual or triennial sampling must oc-cur during the four warmest months of the year.

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-3 Draft, July 2019

Figure 5-1 LCR Monitoring Frequency Decision Chart

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-4 Draft, July 2019 119-108

5.2 WHEN TO SAMPLE FOR LEAD AND COPPER

Standard Monitoring: For CWSs, collect a set of samples in the first six months and a set of samples in the second six months (recommend one set in the hottest month).

Samples must be analyzed for both Pb and Cu (40 CFR 141.86(a)).

Reduced Monitoring: All samples for reduced monitoring must be collected during the hottest month of the year July or August (average temperature 34oC).

Two rounds of consecutive standard monitoring with results below the ALs may qualify the system for reduced monitoring. If the system qualifies for reduced monitoring, it must get NAVFAC MIDLANT PM approval before the system starts on reduced moni-toring activities. The system must maintain reduced monitoring documentation and rec-ords.

Table 5-2 outlines the SUBASENLON Nautilus Park, Pb and Cu monitoring require-ments based on its population n served.

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-5 Draft, July 2019 119-108

Table 5-2 Lead and Copper Summary Monitoring Requirements

Monitoring Schedule

Frequency

Number of Tap Sites3

Population Served:

3,301 – 10,000

Population Served:

501– 3,300

Population Served:

101–500

Please Standard Every 6 months

40 20 10

Reduced1 Annual1

20 10 5 Triennial1

With Waiver Novennial

Number of Samples When AL is Exceeded

WQPs 2

- pH

- Alkalinity

- Calcium

- Conductivity /

TDS

- Temperature

- Orthophosphate or silicate if used for corrosion con-trol

Every 6 months

3 [duplicates] (Three duplicate sets of tap sam-ples, and One du-plicate set of samples from

POE to the distri-bution system])

2 [duplicates] (Two duplicate sets of tap sam-ples, and One du-plicate set of samples from

POE to the distri-bution system])

1 [duplicates] [One duplicate set of tap sam-ples, and One du-plicate set of samples from to the distribution system]

Pb and Cu4 Every 6 months

1 Source water 1 Source water 1 Source water

1) Annually if ALs are met during each of two consecutive 6-month monitoring periods. A system that meets the ALs during 3 consecutive years may reduce the monitoring from annually to once every 3 years. Annual, triennial, or novennial (every nine years) sampling must be conducted during the four warmest months of the year.

2) Systems must monitor WQPs when ALs are exceeded. Samples must be taken in duplicate for pH, alkalinity, calcium, conductivity or TDS, and water temperatures to allow a corrosivity determination (using a Langelier Saturation Index or other appropriate saturation index). Samples must be repre-sentative of water quality throughout the distribution system and include a sample from the entry to the distribution system.

3) The LCR states that, once monitoring is established, the same sites must be used, unless a site is no longer accessible.

4) Purpose is to determine contribution from source water to total tap water Pb and Cu levels and need for source water treatment. The PM sets maximum permissible levels for Pb and Cu in source water based on initial and follow-up source water monitoring.

5.2.1 Lead and Copper Monitoring Waivers

SUBASENLON Nautilus Park water system serves a population of less than 50,000.

The SUBASENLON Nautilus Park water system can be eligible for a monitoring waiver after completing at least two consecutive 6-month standard monitoring periods.

SUBASENLON Nautilus Park must submit a request to the PM and get approval for reducing sampling to once every nine years. Until an approval is granted, in writing, NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-6 Draft, July 2019 119-108

SUBASENLON Nautilus Park water system must continue to monitor for Pb and Cu.

This approval is contingent on satisfying the following conditions:

• The 90th percentile of Pb sample test results must be less than 0.005 mg/L and SUBASENLON Nautilus Park must demonstrate that its distribution system, service lines, and all drinking water supply plumbing, including plumbing con-veying drinking water within all residences and buildings connected to the sys-tem, are free of Pb-containing materials and/or Cu-containing materials, includ-ing the following:

− Plastic pipes and service lines that contain Pb plasticizers

− Pb service lines, Pb pipes, Pb soldered pipe joints, and leaded brass or bronze alloy fittings and Pb containing fixtures including faucets10.

• The 90th percentile of Cu samples test results must be less than 0.65 mg/L and SUBASENLON Nautilus Park must demonstrate (by providing certification and supporting documentation) that its distribution system, service lines and all drinking water supply plumbing, including plumbing conveying drinking water within all residences and buildings connected to the system, are free of Cu-containing material.

5.2.2 PM EV Approval of Waiver Application

The PM EV waiver determination sets the basis of its decision and any condition of the waiver. An example of a conditional waiver is requiring SUBASENLON Nautilus Park to perform specific activities to mitigate the risk of Pb or Cu concentration of concern in tap water (e.g., periodic outreach to customers to remind them to avoid installation of materials that might void the waiver).

5.3 HIERARCHY IN IDENTIFYING SAMPLING LOCATIONS

The EPA has set a priority tier classification system for CWSs, to include sample sites that have the highest probability of corrosion as monitoring sites for Pb and Cu.

10 Unless SUBASENLON can demonstrate that such fittings and fixtures do not leach Pb into the drinking water, by meeting the specifications established in 42 United States Code 300g-6(e) (SDWA section 1417(e)).

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-7 Draft, July 2019 119-108

• Tier 1

− contain Cu pipe with Pb solder that was installed after 1982 (i.e., con-structed between 1983-198811) but before the effective date of the state of Connecticut’s lead ban in 198612 and/or

− contain Pb pipe or are served by a Pb service line (any age structure)

Note: When multiple-family residences (MFRs) comprise at least 20% of the structures served by a water system, the system may count them as Tier 1 sites.

• Tier 2 sampling sites consist of buildings, including MFRs that:

− contain Cu pipe with Pb solder that was installed after 1982 (constructed between 1983-1988); and/or

− contain Pb or are served by a Pb service line (any age structure)

• Tier 3 sampling sites consist of single-family structures that contain Cu pipes with Pb solder installed before 1983

• Other sites are representative structures with other plumbing material (i.e., sites with Cu plumbing installed after 1988)

Tier 1 sites have the highest probability of corrosion, decreasing to Tier 2, and then

Tier 3. If no “Tier” sites are available, “Other” sampling sites may be selected.

Appendix E includes available information on the construction dates of the

SUBASENLON Nautilus Park buildings. Based on the history of the establishment of the SUBASENLON Nautilus Park, most buildings at SUBASENLON Nautilus Park are classified as “Family Housing” and a few structures are not classified, including a Laun-dromat, youth center recreational areas and concession stand, and other structures with no function description or construction year. Also, based on the provided list of structures/buildings, no Tier 1 or Tier 2 sites exist at SUBASENLON Nautilus Park.

There are no “Family Housing” sites listed as built after 1982 (and before the effective date of CT’s lead ban in June 1986). There are structures classified as “Tier 3” within

Nautilus Park.

11 The State of Connecticut banned brass and bronze plumbing fittings that contain lead and lead-containing solder in 1986. This ban took effect on June 19, 1986 (based on the 1986 SDWA Lead Ban). However, in this sampling plan, the buildings (with copper pipes with lead solder) built after 1982 but in or before1986 are considered Tier 1 or Tier 2 sampling sites.

12 Safe Drinking Water Act Amendments in 1986 prohibited use of pipe, solder, or flux in public water that is not “lead free”. This prohibition became effective on June 19, 1986. The State of Connecticut also banned the use of pipe, solder, or flux in public water that is not “lead free” in 1986.

NAVAL SUBMARINE BASE NEW LONDON, CT SAMPLING REQUIREMENTS

AH/BC Navy JV, LLC. 5-8 Draft, July 2019 119-108

The sampling pool identified for SUBASENLON Nautilus Park, includes the building sites where water is drawn for human consumption. The sampling locations were cho-sen in accordance with the EPA LCR Monitoring and Reporting Guidance for PWS

(EPA 2010)13. EPA recommends identifying more sampling sites than the required number of samples for each monitoring period in case primary sites become unavaila-ble due to demolition or renovation. If an original sampling site becomes inaccessible during any monitoring period, a tap water sample must be collected from another site that meets the same targeting criteria as the original site. The replacement site should be located within reasonable proximity of the original site.