J-0200000-08 ELINs Amended.xls
XLS spreadsheet 676 KB Posted
- Solicitation number
- N4008521R2561
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BREAKOUT
| Recurring Price | ||||||
| 0001 | 0003 | 0005 | 0007 | 0009 | ||
| Recurring Work Price | Recurring Work Price | Recurring Work Price | Recurring Work Price | Recurring Work Price | ||
| Base YEAR | 1st OPTION YEAR | 2nd OPTION YEAR | 3rd OPTION YEAR | 4th OPTION YEAR | ||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Recurring Price | ||||||
| 0002 | 0004 | 0006 | 0008 | 0010 | ||
| Non-Recurring Work Price | Non-Recurring Work Price | Non-Recurring Work Price | Non-Recurring Work Price | Non-Recurring Work Price | ||
| Base YEAR | 1st OPTION YEAR | 2nd OPTION YEAR | 3rd OPTION YEAR | 4th OPTION YEAR | ||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ANNUAL TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&L&F&R&D &T
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015 Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-09-R-2508
EXHIBIT A - CLIN 9000
Recurring work base period
| ATTACHMENT J-0200000-08 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION N40085-21-R-2561 | |||||
| EXHIBIT A - CLIN 0001 | |||||
| Line Item 0001 Recurring Work - Base Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - Recurring Work Price - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 | |||||
| ELIN / Sub ELIN | DESCRIPTION | QTY | Unit of Issue | Unit Price | Total |
| A001 SPEC ITEM 3 | |||||
| Stormwater SPEC Items 3.1 & 3.2 | |||||
| A001AA | GSI000679-Industrial Stormwater (8 Outfalls) | 12 | MO | $ - 0 | |
| A001AB | GSM000117-MS4 Stormwater (6 Outfalls) | 12 | MO | $ - 0 | |
| Subtotal Stormwater | $ - 0 | ||||
| Wastewater SPEC Items 3.1 & 3.3 | |||||
| A001AC | GP SIU DSN203-1 Oil Water Separator Wastewater (B29, Rec Tank) | 12 | MO | $ - 0 | |
| A001AD | GP SIU DSN204-1 Oily Water Treatment Facility (B553) | 12 | MO | $ - 0 | |
| A001AE | GP SIU DSN211-1 Fuel Farm Oil/Water Separator Other Non-Process Wastewater (B549) | 12 | MO | $ - 0 | |
| A001AF | GP SIU DSN212-1 North Utility Trench GW/SW Dewatering ( B29, L-10) | 12 | MO | $ - 0 | |
| A001AG | GP SIU DSN215-1 Boiler Blowdown/Drain - Power Plant (B29) | 12 | MO | $ - 0 | |
| A001AH | GP SIU DSN216-1 Boiler Blowdown/Drain - Conventional | 12 | MO | $ - 0 | |
| A001AJ | GP SIU DSN223-1 Water Treatment (Low Temp Water Softener B29) | 12 | MO | $ - 0 | |
| A001AK | GP SIU DSN224-1 Water Treatment (Reverse Osmosis B29) | 12 | MO | $ - 0 | |
| A001AL | GP SIU DSN227-1 Water Treatment (GAC Filters B29) | 12 | MO | $ - 0 | |
| A001AM | NPDES DSN005-1 Freeze Protection Wastewater | 12 | MO | $ - 0 | |
| A001AN | NPDES DSN006-1 Auxiliary Seawater System Wastewater | 12 | MO | $ - 0 | |
| A001AP | NPDES DSN009-1 Ballast Tank Wastewater | 12 | MO | $ - 0 | |
| A001AQ | NPDES DSN011-1 Stormwater Pontoon Deck Runoff at Wet Well | 12 | MO | $ - 0 | |
| A001AR | NPDES DSN017-1 Steam Condensate Wastewater, Cond. Return Collection Tank Overflow (B29) | 12 | MO | $ - 0 | |
| A001AS | NPDES DSN019-1 Fire Hydrant Test Wastewater | 12 | MO | $ - 0 | |
| A001AT | GP SIU DSN202-1 Water Jet Cutters - Cutting & Grinding (B40 and B478) | 12 | MO | $ - 0 | |
| A001AU | GP SIU DSN205-1 NCCW Chiller Discharges | 12 | MO | $ - 0 | |
| A001AV | GP SIU DSN218-1 Cooling Tower Discharges | 12 | MO | $ - 0 | |
| A001AW | GP SIU DSN226-1 Natural Gas Combusion Condensate - Nonprocess Other (B429, B430, B434, B439) | 12 | MO | $ - 0 | |
| A001AX | GP COMP DSN035F-1 NCCW Cooling Tower Sump (B439) | 12 | MO | $ - 0 | |
| A001AY | GP COMP DSN035F-2 NCCW Cooling Tower Sump (B455) | 12 | MO | $ - 0 | |
| A001AZ | GP COMP DSN037F-1 NCCW Cooling Tower Sump (B533) | 12 | MO | $ - 0 | |
| Subtotal Waste Water | $ - 0 | ||||
| A001 Drinking Water SPEC Items 3.1 & 3.4 | |||||
| A001BA | Drinking Water: Lead and Copper Conning Towers | 12 | MO | $ - 0 | |
| A001BB | Drinking Water: Lead and Copper Main Base | 12 | MO | $ - 0 | |
| A001BC | Drinking Water: Lead and Copper Nautilus Park | 12 | MO | $ - 0 | |
| A001BD | Drinking Water: Lead and Copper Polaris Park | 12 | MO | $ - 0 | |
| A001BE | Drinking Water: Lead and Copper Trident Park | 12 | MO | $ - 0 | |
| A001BF | Drinking Water: Stage 2 Disinfectant Conning Towers | 12 | MO | $ - 0 | |
| A001BG | Drinking Water: Stage 2 Disinfectant Main Base | 12 | MO | $ - 0 | |
| A001BH | Drinking Water: Stage 2 Disinfectant Nautilus Park | 12 | MO | $ - 0 | |
| A001BJ | Drinking Water: Stage 2 Disinfectant Polaris Park | 12 | MO | $ - 0 | |
| A001BK | Drinking Water: Stage 2 Disinfectant Trident Park | 12 | MO | $ - 0 | |
| A001BL | Drinking Water: TCR Conning Towers | 12 | MO | $ - 0 | |
| A001BM | Drinking Water: TCR Main Base | 12 | MO | $ - 0 | |
| A001BN | Drinking Water: TCR Nautilus Park | 12 | MO | $ - 0 | |
| A001BP | Drinking Water: TCR Polaris Park | 12 | MO | $ - 0 | |
| A001BQ | Drinking Water: TCR Trident Park | 12 | MO | $ - 0 | |
| Subtotal Drinking Water | $ - 0 | ||||
| Total | $ - 0 |
Page &P&R0200000-J-08 ELINS
Non Recurring Work Base Period
| ATTACHMENT J-0200000-08 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION N40085-21-R-2561 | |||||||
| EXHIBIT A - CLIN 0002 | |||||||
| Line Item 0002 Base Period - Non-Recurring Work | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - Non Recurring Work - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 through A793 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | NPDES Ballast Tank Wastewater (ARDM-4) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Ballast Tank Wastewater. Composite samples shall consist of grab samples collected from six ballast tanks (3 from each side of the dry dock) and combined into one sample. A single grab sample shall be collected from each of the 6 tanks and tested for total residual Oxidants and pH. Grab samples shall be collected from six ballast tanks (3 from each side of the dry dock) and analyzed using Section 8.3 of EPA Method 1664A for oil and grease. Each grab will be analyzed for O&G. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A701 | NPDES Steam Condensate Wastewater, Cond. Return. Collection Tank Overflow or Steam line Leak | The Contractor shall perform environmental laboratory services, and associated reporting requirements for a Steam Condensate Wastewater, Cond. Return. Collection Tank Overflow or Steam line Leak Wastewater. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A702 | GP SIU - Hydrostatic Pressure Testing Wastewater (B478 or other locations) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Hydrostatic Pressure Testing Wastewater per the Significant Industrial Users General Permit. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A703 | GP SIU - Cutting & Grinding Wastewater (B40, B478 or other locations) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Cutting & Grinding Wastewater in various locations. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A704 | GP SIU - Tumbling or Cleaning of Parts Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Tumbling or Cleaning Significant Industrial Users Wastewater discharge in various locations. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A705 | GP SIU - Water Treatment Wastewater Analysis (Water Softeners / Resin Polishers / GAC Filters/ Other Locations) | The Contractor shall perform laboratory services and associated reporting requirements for Significant Industrial Users General Permit Water Treatment Wastewater process discharges. Collect 1st and last 10% of discharge. Not required after Mar2017. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| A706 | NPDES Utility Trench De-watering Wastewater to Groundwater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis in various locations. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| A707 | GP SIU - Boiler Blowdown Wastewater (B29 and Various Locations) | The Contractor shall perform laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Boiler Blowdown Wastewater Analysis at B29 and in various locations. Samples are collected within five working days of notification. | 12 | EA | $ - 0 | ||
| A708 | GP SIU - Vehicle Maintenance Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Vehicle Maintenance Wastewater Analysis in various locations. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| A709 | Quality Control Samples: Field Duplicate | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Field Duplicates (FD) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| A710 | Quality Control Samples: Field Matrix Spike | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Matrix Spike (MS) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| A711 | Quality Control Samples: Field Blank | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Field Blank (FB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| A712 | Quality Control Samples: Equipment Blank | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Equipment Blank (EB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| A713 | Quality Control Samples: Proficiency Test | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Proficiency Tests (PT) in various locations. | 6 | EA | $ - 0 | ||
| A714 | Emergency Sample Testing and Reporting - 24 hours | The Contractor shall provide test results within 24 hours of sample collection to ensure the installation complies with EPA and state requirements. | 6 | EA | $ - 0 | ||
| A715 | Emergency Sample Testing and Reporting - 48 hours | The Contractor shall provide test results in accordance with the SUBASE WTK SAP within 48 hours of sample collection to ensure the installation complies with EPA and state requirements. | 6 | EA | $ - 0 | ||
| A716 | Emergency Sample Testing and Reporting - 3-to-6 days | The Contractor shall provide test results in accordance with the SUBASE WTK SAP within 3-to-6 days of sample collection to ensure the installation complies with EPA and state requirements. | 6 | EA | $ - 0 | ||
| A717 | GP SIU - Swimming Pool Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Swimming Pool Wastewater. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A718 | GP SIU - Fire Suppression Testing Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Fire Suppression Testing Wastewater Analysis. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A719 | NPDES WW Permit Application: Attachment O, Part B, Table 1 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A720 | NPDES WW Permit Application: Attachment O, Part B, Table 2 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A721 | NPDES WW Permit Application: Attachment O, Part B, Table 3 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A722 | NPDES WW Permit Application: Attachment O, Part B, Table 4 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A723 | NPDES WW Permit Application: Attachment O, Part B, Table 5 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A724 | NPDES WW Permit Application: Attachment O, Part B, Table 6 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A725 | NPDES Freeze Protection Wastewater (Aquatic Toxicity) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for an Aquatic Toxicity Freeze Protection Wastewater Analysis in various locations. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A726 | NPDES Auxiliary Seawater System Wastewater (ARDM-4 ASW) (Aquatic Toxicity) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for an Aquatic Toxicity Auxiliary Seawater System Wastewater Analysis. Samples are collected within five working days of notification. .The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for an Aquatic Toxicity Freeze. | 1 | EA | $ - 0 | ||
| A727 | NPDES Auxiliary Seawater System Wastewater (ARDM-4 ASW) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for an Aquatic Toxicity Freeze Protection Wastewater Analysis in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A728 | NPDES Stormwater Pontoon Deck Runoff at Wet Well (ARDM-4 SW) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Stormwater Pontoon Deck Runoff at Wet Well Analysis in various locations on SHIPPINGPORT to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A729 | NPDES Fire Hydrant Test Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Fire Hydrant Test Wastewater Analysis in various locations to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A730 | GP - SIU Oily Water Treatment Facility (B553) Analysis | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Oily Water Treatment Facility Analysis at B-553 to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A731 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 250 | HR | $ - 0 | ||
| A732 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A731. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 1 | LS | $ - 0 | ||
| A733 | NPDES Freeze Protection Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Freeze Protection Wastewater Analysis in various locations to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A734 | GP SIU - Non-Process Building Maintenance Wastewaters | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Non-Process Building Maintenance Wastewater Analysis at various locations to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A735 | GP SIU - Oil Water Separator (B29) Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for the Oil Water Separator Wastewater Discharge at B29 per the Significant Industrial Users General Permit to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. | 12 | EA | $ - 0 | ||
| A736 | Acute Aquatic Toxicity (LC50) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 8 | EA | $ - 0 | ||
| A737 | Aluminum (Al), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A738 | Chemical Oxygen Demand (COD) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A739 | Chloride (Cl) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A740 | Copper (Cu), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A741 | Cyanide, Total (CN) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A742 | Enterococci | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 8 | EA | $ - 0 | ||
| A743 | Fecal Coliform | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 8 | EA | $ - 0 | ||
| A744 | Iron (Fe), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A745 | Lead (Pb), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A746 | Nitrate, as N | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A747 | Oil & Grease, Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A748 | Phosphorus (P), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A749 | Total Kjeldahl Nitrogen (TKN) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A750 | Total Suspended Solids (TSS) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A751 | Zinc (Zn), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A752 | pH | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A753 and A755 or a combination of A753, A754 and A755. | 10 | EA | $ - 0 | ||
| A753 | Transportation of Samples | Pick up and transport samples to testing facilities for ELINS A736 through A752 | 4 | EA | $ - 0 | ||
| A754 | Sample Collection | The Contractor shall perform sample collection for ELINS A736 through A752 | 50 | HR | $ - 0 | ||
| A755 | Storm Water Process | The Contractor shall perform scheduling of laboratory services and associated reporting requirements for environmental Stormwater samples for ELINS A736 through A752 | 4 | EA | $ - 0 | ||
| A756 | Hydrocollator- B449 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A757 | Food Service Establishment Wastewater - Fats, Oils and Grease (FOG) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A758 | GP SIU - Air Compressor Condensate | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Significant Industrial Users General Permit Air Compressor Condensate & Blowdown Wastewater. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A759 | GP SIU - Commercial Laundry | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Commercial Laundry Wastewater. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A760 | GP SIU - Contact Cooling and Heating Water | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Contact Cooling and Heating Wastewater in various locations. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A761 | GP SIU - Food Processing (B175 Refrigerated Boxes/Other) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements per the Significant Industrial Users General Permit. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A762 | GP SIU - Groundwater & Stormwater in Utility Equipment Manholes and/or Vaults | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Analysis of discharges comprised of sources of groundwater and stormwater which enter utility equipment manholes and/or vaults. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A763 | GP SIU - Non-Destruct Testing Rinse water | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Non-Destruct Testing Rinsewater in various locations. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A764 | GP SIU - Noncontact Cooling Water or Reverse Osmosis Reject Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A765 | GP SIU Table 5-1 Effluent Limits | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. . | 6 | EA | $ - 0 | ||
| A766 | GP SIU - Fuel Farm Oil Water Separator Wastewater SW/GW (B549) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Fuel Farm Oil Water Separator Wastewater. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A767 | GP SIU - Printing or Photographic Processing Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Printing or Photographic Processing Wastewater. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A768 | GP SIU - Potable Water System Maintenance and Sampling Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Potable Water System Maintenance & Sampling Wastewater. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A769 | GP SIU - Potable Water Distribution System Testing and/or for insuring Public Health & Safety Wastewaters | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Potable Water Distribution System Testing and/or for insuring Public Health & Safety Wastewaters. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A770 | GP SIU - Other Process Wastewaters | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Other Process Wastewaters. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| A771 | GP SIU - Other Non-Process Wastewaters | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Other Non-Process Wastewaters. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| A772 | GP SIU - Fire Fighter Training Unit Wastewaters (B520) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for the Fire Fighter Training Unit Wastewater Discharge at B520 per the Significant Industrial Users General Permit to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. | 12 | EA | $ - 0 | ||
| A773 | GP COMP - Table 5.2 Maximum Concentrations for Discharges to Surface Water | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for analytes listed in Table 5.2 of the Comprehensive General Permit. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A774 | GP COMP - Table 5.3 Maximum Concentrations for Discharges to Surface Water | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for analytes listed in Table 5.2 of the Comprehensive General Permit. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A775 | GP COMP - Noncontact Cooling or Geothermal Heat Pump Water | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Noncontact Cooling or Geothermal Heat Pump Water Wastewater. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A776 | GP COMP - Water Treatment Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Water Treatment Wastewater. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A777 | GP COMP - Hydrostatic Pressure Testing of Natural Gas and Petroleum Tanks/Pipelines Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Hydrostatic Pressure Testing of Natural Gas and Petroleum Tanks/Pipelines Wastewater. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A778 | GP COMP - Fire Suppression Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Fire Suppression Wastewater. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| A779 | GP COMP - Hydrant Flushing Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Hydrant Flushing Wastewater. Samples are collected within five working days of notification. | 1 | EA | $ - 0 | ||
| A780 | GP COMP - Boiler Blowdown Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Boiler Blowdown Wastewater. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A781 | GP COMP - Swimming Pool Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Swimming Pool Wastewater. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| A782 | GP COMP - Building/Equipment Maintenance or Testing Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Comprehensive General Permit Building/Equipment Maintenance or Testing Wastewater. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A783 | Drinking Water: RTCR - Follow-up bacteriological sampling needed at 3 locations upon initial result of total coliform detected at primary sample location | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within one day of notification. | 12 | EA | $ - 0 | ||
| A784 | Drinking Water, Asbestos | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Representative ampling will occur at 3 of SUBASENLON's water systems where asbestos/transite cement piping is known or is supected to exist. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| A785 | Drinking Water, Nitrite | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Representative annual sampling will occur at all five of SUBASENLON's water systems. Samples are collected within five working days of notification. | 5 | EA | $ - 0 | ||
| A786 | Drinking Water, Nitrate | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Representative annual sampling will occur at all five of SUBASENLON's water systems. Samples are collected within five working days of notification. | 5 | EA | $ - 0 | ||
| A787 | Drinking Water, Lead (Follow-up) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Follow-up sampling will occur in non-Navy priority areas in accordance with Navy protocols to verify the source of lead or to verify that lead concentrations are below the designated action level after faucet or pipe replacement. Samples are collected within five working days of notification. | 5 | EA | $ - 0 | ||
| A788 | Drinking Water: Lead in Priority Areas - Follow-up | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. | 20 | EA | $ - 0 | ||
| A789 | MS4 Stormwater Wet-weather Illicit Discharge Detection and Elimination Investigations | The Contractor shall perform Wet-weather environmental sampling, field testing, laboratory services, and associated reporting requirements for MS4 Stormwater Illicit Discharge Detection and Elimination investigations at 6 Stormwater sites, as directed. | 6 | EA | $ - 0 | ||
| A790 | MS4 Stormwater Dry-weather Illicit Discharge Detection and Elimination Investigations | The Contractor shall perform Dry-weather environmental sampling, field testing, laboratory services, and associated reporting requirements for MS4 Stormwater Illicit Discharge Detection and Elimination investigations at 6 Stormwater sites, as directed. | 6 | EA | $ - 0 | ||
| A791 | Drinking Water, Lead in Priority Area (LIPA) - (One-Time Only in 2023) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Sampling and analysis will be done in accordance with the Navy's Lead in Priority Area (LIPA) Policy (latest version). Samples shall be taken at all sinks designated by the PW NLON EV Division Drinking Water Program Manager at the off-base CDC Complex and Youth Center. Samples are collected within five working days of notification. | 125 | EA | $ - 0 | ||
| A792 | Drinking Water, PFAS (ADM Fife) - (One-Time Only in 2023) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Representative annual sampling will occur at the site caretaker's residence at Admiral Fife Estate Recreation Area for PFAS analytes using EPA Method 537.1 as per Navy PFAS Policy of 2 Mar 20. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| A793 | Drinking Water, PFAS (B109 New London) - (One-Time Only in 2021) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Representative annual sampling will occur at Building 109 at the Magnetic Signature Facility in New London CT for PFAS analytes using EPA Method 537.1 as per Navy PFAS Policy of July 2020. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| TOTAL NON-RECURRING WORK PRICE - BASE PERIOD | $ - 0 | ||||||
| Special Notes to Bidder/Offeror: | |||||||
| NOTE: Currently Electric Boat performs metals testing on NPDES discharges with a salt or brackish water matrix. | |||||||
| (2) Unit Price Column - Unit Prices must be expressed in whole dollars or no more than 4 decimal places. Extended Price must equal Estimated Quantity times Unit Price. |
Page &P&R0200000-J-08 ELINS
Recurring Work OPT YR 1
| ATTACHMENT J-0200000-08 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION N40085-21-R-2561 | |||||
| EXHIBIT B - CLIN 0003 | |||||
| Line Item 0003 Recurring Work - 1st Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - Recurring Work Price - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs B001 | |||||
| ELIN / Sub ELIN | DESCRIPTION | QTY | Unit of Issue | Unit Price | Total |
| B001 SPEC ITEM 3 | |||||
| Stormwater SPEC Items 3.1 & 3.2 | |||||
| B001AA | GSI000679-Industrial Stormwater (8 Outfalls) | 12 | MO | $ - 0 | |
| B001AB | GSM000117-MS4 Stormwater (6 Outfalls) | 12 | MO | $ - 0 | |
| Subtotal Stormwater | $ - 0 | ||||
| Wastewater SPEC Items 3.1 & 3.3 | |||||
| B001AC | GP SIU DSN203-1 Oil Water Separator Wastewater (B29, Rec Tank) | 12 | MO | $ - 0 | |
| B001AD | GP SIU DSN204-1 Oily Water Treatment Facility (B553) | 12 | MO | $ - 0 | |
| B001AE | GP SIU DSN211-1 Fuel Farm Oil/Water Separator Other Non-Process Wastewater (B549) | 12 | MO | $ - 0 | |
| B001AF | GP SIU DSN212-1 North Utility Trench GW/SW Dewatering ( B29, L-10) | 12 | MO | $ - 0 | |
| B001AG | GP SIU DSN215-1 Boiler Blowdown/Drain - Power Plant (B29) | 12 | MO | $ - 0 | |
| B001AH | GP SIU DSN216-1 Boiler Blowdown/Drain - Conventional | 12 | MO | $ - 0 | |
| B001AJ | GP SIU DSN223-1 Water Treatment (Low Temp Water Softener B29) | 12 | MO | $ - 0 | |
| B001AK | GP SIU DSN224-1 Water Treatment (Reverse Osmosis B29) | 12 | MO | $ - 0 | |
| B001AL | GP SIU DSN227-1 Water Treatment (GAC Filters B29) | 12 | MO | $ - 0 | |
| B001AM | NPDES DSN005-1 Freeze Protection Wastewater | 12 | MO | $ - 0 | |
| B001AN | NPDES DSN006-1 Auxiliary Seawater System Wastewater | 12 | MO | $ - 0 | |
| B001AP | NPDES DSN009-1 Ballast Tank Wastewater | 12 | MO | $ - 0 | |
| B001AQ | NPDES DSN011-1 Stormwater Pontoon Deck Runoff at Wet Well | 12 | MO | $ - 0 | |
| B001AR | NPDES DSN017-1 Steam Condensate Wastewater, Cond. Return Collection Tank Overflow (B29) | 12 | MO | $ - 0 | |
| B001AS | NPDES DSN019-1 Fire Hydrant Test Wastewater | 12 | MO | $ - 0 | |
| B001AT | GP SIU DSN202-1 Water Jet Cutters - Cutting & Grinding (B40 and B478) | 12 | MO | $ - 0 | |
| B001AU | GP SIU DSN205-1 NCCW Chiller Discharges | 12 | MO | $ - 0 | |
| B001AV | GP SIU DSN218-1 Cooling Tower Discharges | 12 | MO | $ - 0 | |
| B001AW | GP SIU DSN226-1 Natural Gas Combusion Condensate - Nonprocess Other (B429, B430, B434, B439) | 12 | MO | $ - 0 | |
| B001AX | GP COMP DSN035F-1 NCCW Cooling Tower Sump (B439) | 12 | MO | $ - 0 | |
| B001AY | GP COMP DSN035F-2 NCCW Cooling Tower Sump (B455) | 12 | MO | $ - 0 | |
| B001AZ | GP COMP DSN037F-1 NCCW Cooling Tower Sump (B533) | 12 | MO | $ - 0 | |
| Subtotal Waste Water | $ - 0 | ||||
| B001 Drinking Water SPEC Items 3.1 & 3.4 | |||||
| B001BA | Drinking Water: Lead and Copper Conning Towers | 12 | MO | $ - 0 | |
| B001BB | Drinking Water: Lead and Copper Main Base | 12 | MO | $ - 0 | |
| B001BC | Drinking Water: Lead and Copper Nautilus Park | 12 | MO | $ - 0 | |
| B001BD | Drinking Water: Lead and Copper Polaris Park | 12 | MO | $ - 0 | |
| B001BE | Drinking Water: Lead and Copper Trident Park | 12 | MO | $ - 0 | |
| B001BF | Drinking Water: Stage 2 Disinfectant Conning Towers | 12 | MO | $ - 0 | |
| B001BG | Drinking Water: Stage 2 Disinfectant Main Base | 12 | MO | $ - 0 | |
| B001BH | Drinking Water: Stage 2 Disinfectant Nautilus Park | 12 | MO | $ - 0 | |
| B001BJ | Drinking Water: Stage 2 Disinfectant Polaris Park | 12 | MO | $ - 0 | |
| B001BK | Drinking Water: Stage 2 Disinfectant Trident Park | 12 | MO | $ - 0 | |
| B001BL | Drinking Water: TCR Conning Towers | 12 | MO | $ - 0 | |
| B001BM | Drinking Water: TCR Main Base | 12 | MO | $ - 0 | |
| B001BN | Drinking Water: TCR Nautilus Park | 12 | MO | $ - 0 | |
| B001BP | Drinking Water: TCR Polaris Park | 12 | MO | $ - 0 | |
| B001BQ | Drinking Water: TCR Trident Park | 12 | MO | $ - 0 | |
| Subtotal Drinking Water | $ - 0 | ||||
| Total | $ - 0 |
Page &P&R0200000-J-08 ELINS
Non Recurring Work OPT YR 1
| ATTACHMENT J-0200000-08 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION N40085-21-R-2561 | |||||||
| EXHIBIT B - CLIN 0004 | |||||||
| Line Item 0004 Option Period 1 - Non-Recurring Work | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - Non Recurring Work - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs B700 through B793 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | NPDES Ballast Tank Wastewater (ARDM-4) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Ballast Tank Wastewater. Composite samples shall consist of grab samples collected from six ballast tanks (3 from each side of the dry dock) and combined into one sample. A single grab sample shall be collected from each of the 6 tanks and tested for total residual Oxidants and pH. Grab samples shall be collected from six ballast tanks (3 from each side of the dry dock) and analyzed using Section 8.3 of EPA Method 1664A for oil and grease. Each grab will be analyzed for O&G. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| B701 | NPDES Steam Condensate Wastewater, Cond. Return. Collection Tank Overflow or Steam line Leak | The Contractor shall perform environmental laboratory services, and associated reporting requirements for a Steam Condensate Wastewater, Cond. Return. Collection Tank Overflow or Steam line Leak Wastewater. Samples are collected within five working days of notification. | 3 | EA | $ - 0 | ||
| B702 | GP SIU - Hydrostatic Pressure Testing Wastewater (B478 or other locations) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Hydrostatic Pressure Testing Wastewater per the Significant Industrial Users General Permit. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| B703 | GP SIU - Cutting & Grinding Wastewater (B40, B478 or other locations) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Cutting & Grinding Wastewater in various locations. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| B704 | GP SIU - Tumbling or Cleaning of Parts Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Tumbling or Cleaning Significant Industrial Users Wastewater discharge in various locations. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| B705 | GP SIU - Water Treatment Wastewater Analysis (Water Softeners / Resin Polishers / GAC Filters/ Other Locations) | The Contractor shall perform laboratory services and associated reporting requirements for Significant Industrial Users General Permit Water Treatment Wastewater process discharges. Collect 1st and last 10% of discharge. Not required after Mar2017. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| B706 | NPDES Utility Trench De-watering Wastewater to Groundwater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis in various locations. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| B707 | GP SIU - Boiler Blowdown Wastewater (B29 and Various Locations) | The Contractor shall perform laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Boiler Blowdown Wastewater Analysis at B29 and in various locations. Samples are collected within five working days of notification. | 12 | EA | $ - 0 | ||
| B708 | GP SIU - Vehicle Maintenance Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Vehicle Maintenance Wastewater Analysis in various locations. Samples are collected within five working days of notification. | 6 | EA | $ - 0 | ||
| B709 | Quality Control Samples: Field Duplicate | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Field Duplicates (FD) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| B710 | Quality Control Samples: Field Matrix Spike | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Matrix Spike (MS) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| B711 | Quality Control Samples: Field Blank | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Field Blank (FB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| B712 | Quality Control Samples: Equipment Blank | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Equipment Blank (EB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. | 6 | EA | $ - 0 | ||
| B713 | Quality Control Samples: Proficiency Test | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Proficiency Tests (PT) in various locations. | 6 | EA | $ - 0 | ||
| B714 | Emergency Sample Testing and Reporting - 24 hours | The Contractor shall provide test results within 24 hours of sample collection to ensure the installation complies with EPA and state requirements. | 6 | EA | $ - 0 | ||
| B715 | Emergency Sample Testing and Reporting - 48 hours | The Contractor shall provide test results in accordance with the SUBASE WTK SAP within 48 hours of sample collection to ensure the installation complies with EPA and state requirements. | 6 | EA | $ - 0 | ||
| B716 | Emergency Sample Testing and Reporting - 3-to-6 days | The Contractor shall provide test results in accordance with the SUBASE WTK SAP within 3-to-6 days of sample collection to ensure the installation complies with EPA and state requirements. | 6 | EA | $ - 0 | ||
| B717 | GP SIU - Swimming Pool Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Swimming Pool Wastewater. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| B718 | GP SIU - Fire Suppression Testing Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Significant Industrial Users General Permit Fire Suppression Testing Wastewater Analysis. Samples are collected within five working days of notification. | 4 | EA | $ - 0 | ||
| B719 | NPDES WW Permit Application: Attachment O, Part B, Table 1 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| B720 | NPDES WW Permit Application: Attachment O, Part B, Table 2 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| B721 | NPDES WW Permit Application: Attachment O, Part B, Table 3 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| B722 | NPDES WW Permit Application: Attachment O, Part B, Table 4 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 | ||
| B723 | NPDES WW Permit Application: Attachment O, Part B, Table 5 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. | 2 | EA | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .