NEPA.pdf

PDF 94 KB Posted

Attached to
Water Testing Services - Naval Submarine Base New London
Solicitation number
N4008521R2561
Issued by

View the file

Other files

File Type Posted
RFI PART III Clarifications.pdf PDF
Amendment 0008.pdf PDF
RFI Responses Part III.pdf PDF
Amendment 0007.pdf PDF
SIU GP 20210524 - DRAFT 3.pdf PDF
Amendment 0006.pdf PDF
RFI Responses Part II.docx DOCX document
1800000-C Water Testing PWS.pdf PDF
RFI RESPONSES Part I.pdf PDF
J-0200000-02 Wage Determ.pdf PDF
Amendment 0005.pdf PDF
0200000 C Management and Admin.pdf PDF
Amendment 0004.pdf PDF
SIU GP Reg Final.pdf PDF
J-0200000-08 ELINs Amended.xls XLS spreadsheet
Water Testing Bid Schedule - Amended.xls XLS spreadsheet
Amendment 0003.pdf PDF
NPDES Permit CT0003921.pdf PDF
GP COMP CTCSW0034.pdf PDF
GP Comprehensive Permit.pdf PDF
ARDM Discharge Photo 2.jpg JPG image
Off-Base Maps.pdf PDF
ARDM Discharge Photo.jpg JPG image
Site Visit Information.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
J-0200000-02 Wage Determ.pdf PDF
Nautilus Park - 2019 DDBPR.pdf PDF
J-0200000-5C Contractor Incident Report.pdf PDF
1800000-C Water Testing PWS.pdf PDF
J-0200000-07 Installation Spill Control Plan.pdf PDF
Trident Park-2019 DDBPR.pdf PDF
Drinking Water Example Report.pdf PDF
Trident Park - 2019 RTCR.pdf PDF
Industrial Stormwater SMR Example.pdf PDF
EEP Permitting Fact Sheet.pdf PDF
Cert-141.pdf PDF
Drinking Water Testing Actuals.pdf PDF
N4008521R2561.pdf PDF
Form 5512-1 Base Access.pdf PDF
Conning Towers 2019 RTCR.pdf PDF
Trident Park-2019 LCR.pdf PDF
GP SIU DMR EXAMPLE.pdf PDF
Water Testing Bid Schedule.xls XLS spreadsheet
J-0200000-5A On-Site Labor Summary Report.xls XLS spreadsheet
Main Base - 2019 LCR.pdf PDF
J-0200000-5B Quality Inspection and Surveillance Report.xls XLS spreadsheet
Base Map.pdf PDF
Nautilus Park 2019 RTCR.pdf PDF
0200000 180000 J Docs-Exhibits-Attachments.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON

NEW FORM EFFECTIVE 07/10/2020. This NEPA Environmental Checklist (EC) is used to determine the environmental requirements associated with a proposed project. Complete the first 2 pages of the form, attach a site map and a SOW or 1391, and then submit to the PWD Environmental Division (EV). A complete EC with required attachments should be submitted a minimum of 15 days prior to project’s scheduled start date. If the project scope is modified or if project work has not been initiated within 1 year of the signature date, please contact EV for review/approval prior to initiating project activities.

GENERAL PROJECT INFORMATION

1 Activity Requesting: Naval Submarine Base New London

2 Activity POC / Phone / email: Lynne Kronk, lynne.kronk@navy.mil

3 Name of Project: Water testing contract

4 Project Number (if any): n/a

5 Project Location: Naval Submarine Base New London, Groton, CT

6 Project Type: Water testing

7 Description of the Project: Contract rewrite 8 Why is this project needed? Water testing

9 When project scheduled to begin? 01 Oct 2021

PLANNING QUESTIONS

10a Total Project Area (sq. ft.) - (Include clear zones, soil disruption/disturbance area, lay down areas, etc) NA

10b Percentage of Project Area - that is currently Impervious (asphalt, bldgs, etc.) 100%

10c Percentage of Project Area - that will be Impervious once project completed 100%

10d Percentage of Project Area - that will be disturbed (excavated, graded, etc) 0%

11 How will Stormwater be managed in the long-term (post-construction)? No change

12 How will Sanitary Sewage (wastewater) be managed in the long-term? No change

13 Will there be actions conducted in the water (dredging, new pilings, removal etc.)? If so indicate state what action(s). No

14 Will there be actions conducted in an area under an Agriculture outlease? No

DESIGN RELATED QUESTIONS YES NO UNSURE

15 Will trees be removed?

16 Will emission-generating equipment (e.g. bull dozer, back hoe, etc.) be utilized during construction?

17 Will the project remove, install or utilize a petroleum storage tank, that is >=55-gallons?

18 Will the project remove or install an Oil Water Separator?

19 Will the project relocate excavated material at the Installation? If yes where is it going?

Will the construction / repair actions generate by-products (power washing water, haz. waste, state regulated waste such as asbestos, PCB items, transformers, capacitors, switches, light ballasts, lead paint chips, florescent bulbs, waste oil, solvents, etc)? If so indicate what type of waste(s) will be generated.

21 Will the construction / repair actions require de-watering from excavations, trenches or manholes? If yes, circle where de-watering will occur?

DESIGN RELATED QUESTIONS YES NO UNSURE

22 Will there be new hard pipe connections or modifications to existing hard pipe connections using water from Groton Utilities, the Thames, or wells?

Will new hard pipe connections or modifications to existing hard pipe connections discharge wastewater to the sanitary sewer, storm sewer or the Thames River? If so circle discharge type.

24 Will there be UST or AST installation, modification, or removal? If so indicate which type of tank and which action.

25 Will there be installation, repair, modification or removal of any system containing refrigerants

(e. g. freon, halon)?

26 Will there be modifications, destruction, or disturbance of the shoreline, streams, groundwater tables, surface water bodies, or wetlands? If so, explain.

Will there be any excavation and/or dewatering with the potential to impact the designated CT Coastal Zone (i.e., 1,000 feet inland from the MHW line)? If so, what type of activity will occur that can potentially impact the coastal zone area?

28 New proposed use and/or application of pesticides, rodenticides and herbicides? If so, indicate which type.

29 Will the project require pile driving?

OPERATIONAL RELATED QUESTIONS YES NO UNSURE

30 Will emission-generating equipment be installed (ex. paint booth, emergency generators)? If so, what type of equipment will be installed?

31 Will there be any new processes or maintenance activities conducted? If so, describe what they are.

ADDITIONAL COMMENTS

Type here:

SAME 3/17/2021

Checklist Preparer, phone number and e-mail Date

NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON

SUMMARY OF ENVIRONMENTAL REQUIREMENTS

(To Be Completed by Environmental Division Only) PLEASE NOTE: The Environmental review provided is only valid for 1 year. If the project scope has been modified or checklist has expired, please contact the SUBASENLON PW Environmental Division to re-evaluate the project.

Name of Project: Water testing contract

Project Number: n/a

PLANNING REQUIREMENTS (Issues That Can Effect the Project’s Timeline, Cost, or Site Location) Environmental Aspect YES NO Environmental Requirement Project Impacts

National Env Policy Act (NEPA) CATEX CATEX = 1 week; EA = 12 months; EIS = 24 months Can’t award till NEPA complete

Threatened or Endangered Species Consultation with USFWS and/or NMFS required. Process may take 6 months

Marine Mammal Protection Act IHA or LOA Consultation with NMFS May take 4 to 18 months

Wetland Impacts Permits and possibly mitigation required. May take 7 months after

NEPA

Navigable Water Impacts Permits required. Takes 2-7 months after

NEPA

Agriculture Outlease Consultations with NAVFAC Real Estate required. Process may take 1 to 3 months.

Tree Mitigation Compensation for tree loss or mitigation is required. This may add costs to project.

Coastal Zone Mgmt Act Refer to Requir 1. Process takes 90 days.

Cultural Resources Consultations with SHPO required Process may take 1 to 6 months

Major Air Emission Source Permit is required. Process takes 6 months

Construction Emissions Air Conformity Record of Non-Applicability is required. This process takes a week.

Installation Restoration Refer to Requir 2. Process may take 4 months

Petroleum Contamination Follow guidance in CNRMA POL SOP. This may add costs to project.

DESIGN REQUIREMENTS (Issues To Be Addressed In Design Phase) Storm Water Best Mgmt

Practices, Erosion & Sediment Control

Required for projects that include excavation or other land disturbance. Incorporate into the design.

CT Storm Water Mgmt Permit Required for projects that will disturb ≥ 1 acre of land. Obtain before construction.

De-watering, Wastewater Mgmt Protective measures required for managing excess waters. Incorporate into the design.

Beach & Dune Management Protective measures required for impact beaches & dunes Incorporate into the design.

Spill Preventative Measures Secondary containment required for tanks ≥ 55 gal Incorporate into the design.

OPERATIONAL REQUIREMENTS (Issues To Be Addressed Prior To Use)

New Industrial Process Environmental Department Site Inspection required. Required before operation.

New Waste Generating Activity Environmental Department Site Inspection required. Required before operation.

ADDITIONAL REQUIREMENTS or COMMENTS Comment 1 The proposed action is within the scope of CATEX #7: Routine procurement of goods and services conducted in accordance with applicable procurement regulations, executive orders, and policies. None of the exclusions from reliance on a CATEX applies in this case; therefore, the proposed action does not require further NEPA analysis. The applicability of this CATEX determination is based on the full implementation of all environmental requirements identified below.

Requir 1 Work may occur in the coastal zone; however, a Coastal Consistency Determination is not required provided that no deleterious material enters storm drains, manholes, or the Thames River.

Requir 2 Work may occur in buildings located in or near an IR zone/site. However, no ground-disturbing activities are included in the scope of work. If ground-disturbing activities are planned, a dig permit shall be obtained prior to the initiation of such activity.

Requir 3 Disposal of any regulated waste shall be coordinated in advance with the PW NLON Hazardous Waste Program Office (x4298).

- Non-regulated solid waste (i.e., general trash, construction debris, and recyclable items) shall be properly managed and disposed of in accordance with Federal, State, Navy, and local regulations.

- Any regulated waste generated under the scope of this project shall be managed, stored, and disposed of in accordance with the SUBASENLON Hazardous Waste Management Plan.

Requir 4 Use of exterior storage and laydown areas in support of this project shall be done in compliance with SUBASENLON instructions and policies. Site must be evident of good housekeeping practices consistent with proper storm water management and control.

LCDR Christopher Sandmel; x4480;

christopher.sandmel@navy.mil

Environmental POC; phone number and email Signature and Date mailto:christopher.sandmel@navy.mil

DESIGN RELATED QUESTIONS
DESIGN RELATED QUESTIONS
2021-04-06T08:15:15-0400
SANDMEL.CHRISTOPHER.ADAM.1266626238

File details come from the government source that posted it. Updated .