N6945022R0028SectionF.pdf

PDF 834 KB Posted

Attached to
Base Operations Support (BOS) Services at NAS Key West, FL
Solicitation number
N6945022R0028
Issued by

About this file

This document outlines deliverables and submission dates for a Base Operations Support contract at Naval Air Station Key West, Florida. Services required include Facility Investment, Pest Control, Integrated Solid Waste Management, and Utilities Management.

The contractor must submit various management plans, inspection reports, permits, licenses and certifications to the Contracting Officer and Contracting Officer's Representative on schedules ranging from weekly to annually. Key deliverables include service order summaries, preventive maintenance programs and schedules, inspection and testing reports, pesticide use plans, solid waste collection and disposal records, and utility locate documentation. Submission dates vary by deliverable but many are required on a monthly or annual basis.

The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for Base Operations Support services at NAS Key West. The contract will cover recurring and non-recurring services at the base.

View the file

Other files

File Type Posted
JL-10 N6945022R0028_BOS Monthly Report_0003.pdf PDF
JL-7 N6945022R0028 GPI Responses_0003.pdf PDF
JL-11 N6945022R0028_FY21 WO Logs_0003.xlsx XLSX spreadsheet
N6945022R0028SectionF_0003.pdf PDF
N69450R20028SectionC_0003.pdf PDF
JL-9 N6945022R0028_Annual Chiller PM Reports_0003.pdf PDF
J-0200000-12 ELINS_0003.xlsx XLSX spreadsheet
JL-1 N6945022R0028_0003.xlsx XLSX spreadsheet
N6945022R0028SectionJ_0003.pdf PDF
N6945022R0028-0003.pdf PDF
JL-7 N6945022R0028 GPI Responses_0002.pdf PDF
JL-8 N6945022R0028 KW BOS Photos_0002.zip ZIP file
N6945022R0028 WD2015-4583(Rev.19)_0002.pdf PDF
N6945022R0028 Monroe Bldg FL20220022_0002.pdf PDF
N6945022R0028-0002.pdf PDF
N6945022R0028 Monroe Hvy FL20220096_0002.pdf PDF
N6945022R0028SectionC_0001.pdf PDF
JL-5 N6945022R0028 Site Visit Brief_0001.pdf PDF
N6945022R0028-0001.pdf PDF
JL-6 N6945022R0028 Site Visit Sign-In Sheet_0001.pdf PDF
J-0200000-10 KWSPCC.pdf PDF
J-0200000-12 ELINS.xlsx XLSX spreadsheet
JM-2 N6945022R0028 PPQ.doc DOC document
N6945022R0028 Monroe Bldg FL20220022.pdf PDF
JL-4 N6945022R0028 Site Visit Itinerary.pdf PDF
JM-1 N6945022R0028 Corporate Experience.docx DOCX document
JL-1 N6945022R0028.xlsx XLSX spreadsheet
N6945022R0028 Monroe Hvy FL20220096.pdf PDF
N6945022R0028SectionJ.pdf PDF
J-0200000-05 Service Provider Information.xlsx XLSX spreadsheet
J-0200000-07 Specification Information.xlsx XLSX spreadsheet
J-0200000-08 Characteristic Meter Reading Information.xlsx XLSX spreadsheet
JL-3 N6945022R0028 SECNAV5512.pdf PDF
J-0200000-06 Asset Information.xlsx XLSX spreadsheet
N6945022R0028 WD2015-4583(Rev.18).pdf PDF
N6945022R0028SectionC.pdf PDF
JL-2 N6945022R0028 GPIF.xls XLS spreadsheet
N6945022R0028.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0200000 – Management and Administration

SECTION F: DELIVERIES OR PERFORMANCE

DELIVERABLES

Annex/ Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.2.1.2

Request to Work Outside Government’s Regular Working Hours

At least seven calendar days prior to requested day.

KO and COR 1 As required

0200000/ 2.3.1

Sign-in Sheets and Minutes for Review and Comments

Within two working days

KO, COR and all attendees

1 As Required

0200000/ 2.3.1

Sign-in Sheets and Minutes Final Revision

Within two working days

KO, COR and all attendees

1 As Required

0200000/ 2.3.4

Permits and Licenses Before work commences and as requested by the KO.

KO and COR 1 As specified

0200000/ 2.3.5

Certificate of Insurance

Within 15 calendar days prior to contract start.

KO and COR 1 As specified

0200000/ 2.3.5

Written Notice of cancellation or material change in policy coverage

At least 30 calendar days prior to cancellation or material change in policy coverage

KO and COR 1 As required

0200000/ 2.6.1

Plans of Action and Milestones (POA&Ms)

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO, COR, and Command Security Manager

1 As required

0200000/ 2.6.1

Cybersecurity Incident Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours

KO, COR, and Command Security Manager

1 As required

0200000/ 2.6.4

Scheduling and Work Status Updates

Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours

KO and COR 1 As Specified

N69450-22-R-0028 SECTION F

DELIVERABLES

Annex/ Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.6.4

Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.

COR 1 Monthly

0200000/ 2.6.5

Notification of any Difficulty in Scheduling Work

By the end of each workday

KO and COR 1 As required

0200000/ 2.6.6

Status of Deliverables Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours

KO and COR 1 As required

0200000/ 2.6.7

Service Interruptions At least five working days in advance

KO and COR 1 As required

0200000/ 2.6.8.2

Pipe Delimited Flat- File

By the end of each workday

KO or a representative designated by the KO

1 Daily

0200000/ 2.6.8.2

Sample Pipe Delimited Flat-File

Within 30 calendar days prior to contract start.

KO or a representative designated by the KO

1 As required to demonstrate the ability to properly format the flat-file 0200000/

2.6.8.2 Asset and Specification Data

When an asset is repaired, replaced, installed, or otherwise affected

KO or a representative designated by the KO

1 As required

0200000/ 2.6.8.3

List of personnel requiring access to Government’s Maximo

Within 30 calendar days prior to contract start.

KO and COR 1 As specified

0200000/ 2.6.9.1

Quality Management Plan

Within 15 calendar days prior to contract start.

KO and COR 1 As specified

0200000/ 2.6.9.1

Revised Quality Management Plan

Within seven calendar days of changes.

KO and COR 1 As specified

Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.6.9.2

QC Inspection File Within five calendar days of completion/ termination of the contract.

KO and COR 1 As specified

0200000/ 2.6.9.3

Contractor Quality Inspection and Surveillance Report

First work day of each month.

KO and COR 1 Monthly

0200000/ 2.6.10

Property Management Plan

Within 45 calendar days after award.

KO and COR 1 As specified

0200000/ 2.7.1

List of Key Personnel and Qualifications

Within 15 calendar days prior to contract start

KO and COR 1 As specified

0200000/ 2.7.1

Organizational Chart Within 15 calendar days prior to contract start

KO and COR 1 As specified

0200000/ 2.7.2.6

Proof of Legal Residency

Prior to be admitted to site of work.

KO and COR 1 As specified

0200000/ 2.7.2.6

Proof of United States of America Citizenship

Prior to be admitted to site of work.

KO and COR 1 As specified

0200000/ 2.7.3

Service Contract Reporting (SCR)

No later than 31 October

KO and COR 1 Annually for labor executed during the period of performance during each Government fiscal year

(FY)

0200000/

2.8.1 Employee List Within 15 calendar

days prior to contract start and within seven calendar days of changes.

KO and COR 1 As required

0200000/ 2.8.8

OF-306 Declaration for Federal Employment and Digital Fingerprints

Prior to commencement of work

KO, COR, and Security Manager

1 As required

0200000/ 2.8.9

List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO, COR, and Security Manager

1 As required

0200000/ 2.9.2

Accident Prevention Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 1 As specified

Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.9.3

Activity Hazard Analysis

Together with the Accident Prevention Plan and within seven calendar days of and changes.

KO and COR 1 As specified

0200000/ 2.9.4

Compliance Plans, Programs, and Procedures

Together with the Accident Prevention Plan and within seven calendar days of and changes.

KO and COR 1 As specified

0200000/ 2.9.4.7

Control of Hazardous Energy (lockout/tagout)

Within 30 calendar days after annual inspection.

KO and COR 1 Annually

0200000/ 2.9.6

NAVFAC Contractor Incident Reporting System (CIRS)

Within five calendar days of accident.

KO and COR 1 As required

0200000/ 2.9.6

Weight Handling Equipment Accident Report

Within 15 working days of accident.

KO and COR 1 As required

0200000/ 2.9.6

Crane and Rigging Gear Near Miss Report

Within 15 working days of accident.

KO and COR 1 As required

0200000/ 2.9.8

Monthly On-Site Labor Report

First work day of each month.

KO and COR 1 Monthly

0200000/ 2.9.9

OSHA Citations and Violations Corrective Action Report

Within 48 hours after receiving a citation.

KO and COR 1 As required

0200000/ 2.9.10

Safety Inspection and Monitoring Report

Upon request. KO and COR 1 As required

0200000/ 2.9.11

Safety Certifications Within 15 calendar days prior to contract start and as old certifications, expire.

KO and COR 1 As specified

0200000/ 2.10

EMS Goals and Policy Measurement Information

Upon request. KO and COR 1 As required

0200000/ 2.10.1.1

Water Conservation Plan

Within 15 calendar days after award and for changes.

KO and COR 1 As specified

0200000/ 2.10.2

Environmental Protection Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 1 As specified

0200000/ 2.10.2.1

Sampling Plan Prior to Sampling KO and COR 1 As required

0200000/ 2.10.2.1

Laboratory Analysis Upon Request KO and COR 1 As specified

Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.10.2.2

Class I and II ODS Report

Within 24 hours following delivery of refrigerant to DLA

KO and COR 1 As required

0200000/ 2.10.2.3

Solid Waste Management and Recycling Reports

First work day of each month.

KO and COR 1 Monthly

0200000/ 2.10.2.3

Summary Solid Waste Management and Recycling Report

By October 10th KO and COR 1 Annually

0200000/ 2.10.2.5

Waste Stream Determination

Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.

KO and COR 1 As required

0200000/ 2.10.2.7

Fuel and hazardous substance spill notification

Within 15 minutes of discovery

Regional Dispatch Center

1 As required

0200000/ 2.10.2.7

Fuel and hazardous substance spill notification

As soon as possible but not more 24 hours of discovery

KO and COR 1 As required

0200000/ 2.10.2.7

Fuel and hazardous substance spill report

Within 48 hours of discovery

KO and COR 1 As required

0200000/ 2.10.2.8

Emergency Planning and Community Right-To-Know Act (EPCRA) Report

Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.

KO and COR 1 As specified

0200000/ 2.10.2.8

Contractor Hazardous Material Inventory Log

Within 15 calendar days after the end of each calendar year and at termination of the contract.

KO and COR 1 Annually

0200000/ 2.10.2.12

Asbestos Containing Material (ACM)

Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours

KO and COR 1 As specified

0200000/ 2.10.2.13

Hazardous Air Pollutants Semi-annual Reports

At intervals of 160 to 200 calendar days

KO, COR,

Installation

Environmental Division, City, State, and

EPA

1 Semi-annually

Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.10.2.13

Hazardous Air Pollutants Monthly Data

First workday of each month.

KO, COR,

Installation

Environmental Division

1 Monthly

0200000/ 2.10.3

Sustainable Procurement and Practices Plan

Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.

KO and COR 1 Annually

0200000/ 2.10.3

Sustainable Delivery of Services Report

Within five calendar days after each contract period.

KO and COR 1 Annually

0200000/ 2.10.3.2

Recovered Material Certification

As specified KO and COR 1 When a product containing recovered materials is equal to or better than the original and could be used.

0200000/ 2.11

Mission Essential Contractor Services Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 1 As Required

0200000/ 2.11

Mission Critical/Mission Essential Personnel

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 1 As specified

0200000/ 2.12

Technical Library Table of Contents

Within 15 calendar days after contract start and within seven calendar days of changes

KO and COR 1 As specified

0200000/ 2.14.1

Recurring Work Proposals

Within five calendar days following receipt of request

KO and COR 1 As required

0200000/ 2.14.2

Notification to the Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude

Within two hours of identification

KO and COR 1 As required

0200000/ 2.15.1.1

Non-Recurring Work Quantities Ordered via FedMall

By the fifth day of the following month

KO and COR 1 Monthly

Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.15.2.1

Non-Recurring Work Proposals

Within two working days following receipt of request

KO 1 As required

1502000 – Facility Investment

Spec Item Deliverable Title

Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

1502000/ 2.2.1

Certification and Licenses

Within 15 days after award or as requested by the KO

KO 1 Once for initial submittal, then as requested

1502000/ 3.1

Service Order Summary Report

First work day of each week and month

KO 2 Weekly and Monthly

1502000/ 3.2

Preventive Maintenance Program Plan

30 calendar days after contract award

KO 2 Annually

1502000/ 3.2

Monthly PM Work Schedule

Five work days prior to the beginning of each month

KO 1 Monthly

1502000/ 3.3

Inspection, Testing, and Certification Program Summary Report

First work day of each month

KO 2 Monthly

1502000/ 3.3

Inspection, Testing and Certification Schedule and Equipment Certifications

First work day of each month

KO 2 Monthly

1502000/ 3.4.5

Inspection and Test Report for Vertical Transportation Equipment

First work day of each month

KO 2 Monthly

1502000/ 3.3.2

Certification of Load Test and Condition Inspection Form

First work day of each month

KO 2 Monthly

1502000/ 3.4

Other Recurring Services Program Summary Report

First work day of each month

KO 2 Monthly

1503020 – Pest Control

Annex/Spec Item

Deliverable

Title Date(s) of

Submission

Distribution Frequency

Original/ Copies

Number of Copies (including original) 1503020/2.2.1 Copy of State

Certification for Contractor Personnel

15 calendar days prior to start of work.

Copies of renewed certifications shall also be submitted.

KO, PAR,

PMC

3 As required

1503020/2.3.1 Copy of Local/State Business License

Prior to contract award.

Copies of renewed licenses shall also be submitted.

KO, PAR 2 1 per state

1503020/2.3.2 Permits 5 days prior to the start of work requiring permits.

KO, PAR 2 As required

1503020/2.3.4 Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report

15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.

KO, PAR 2 As required

1503020/2.3.5 Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)

With the proposal.

Note: Any proposed changes in pesticide usage shall be submitted for approval at least 10 business days in advance of pesticide use.

KO, PAR,

PMC

3 1 for each pesticide per pest as required

1503020/3 Contractor's Work Plan

With the proposal.

KO, PAR 2 1 per proposal

1503020/3 Report of Conditions Conducive to Pest Infestation

1 working day after citing conditions.

KO, PAR 2 As required

Annex/Spec Item

Deliverable

Title Date(s) of

Submission

Distribution Frequency

Original/ Copies

Number of Copies (including original) 1503020/3, 4 Five-year

Termite Treatment Warranties

10 days following the treatment.

KO, PAR 2 As required

1503020/3, 4 Termite and Wood Decay Inspection (DD Form 1070) (per the appropriate Pest Group Sheet)

10 working days after inspection completed.

KO, PAR 2 As required

1503020/3, 4 Stored Product Pest Survey (per the appropriate Pest Group Sheet)

Within 1 day of the survey.

KO, PAR 2 As required

1503020/3, 4 Pharaoh Ant Treatment:

Floor Plan Diagram (per the appropriate Pest Group Sheet)

2 calendar days prior to beginning the treatment.

KO, PAR 2 As required

1503020/3, 4 Tick Survey Report (per the appropriate Pest Group Sheet)

Within 1 day of the survey.

Installation Preventive Medicine

Department, KO, PAR

3 As required

1503020/3, 4 Mole Cricket Survey Report (per the appropriate Pest Group Sheet)

Within 1 day of the survey.

KO, PAR 2 As required

1503020/3.3 Report of Pest Management Operations

Electronically once per month by the 15th of the following month (Example: July data must be submitted by

August 15) on the format approved by

PMC.

KO, PAR,

PMC

3 Monthly

1503030 – Integrated Solid Waste Management

Annex/ Spec Item

Deliverable Title

Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies

(including original)

1503030 / 2.3.1

Revenue Receipts

As specified

KO 12 With invoice/Monthly/ As Applicable

1503030 / 2.3.2

Weight Tickets As specified

KO 12 With invoice/Monthly

1503030 / 3.1 Solid Waste Collection Schedule

As specified

KO 1 15 days after award/Annually

1601000 – Utilities Management

Annex/Spec Item Deliverable Title Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies

(including original)

1601000 / 3.1.1 Excavation Permit

– Utility Locate Pictures

Upon issuance

Utilities Branch

Head/COR and

KO

3 As required

0200000 F Management and Administration
1502000 F Facility Investment
1503020 F Pest Control
1503030 F Integrated Solid Waste Management
1601000 F Utilities Management