JL-7 N6945022R0028 GPI Responses_0002.pdf
PDF 114 KB Posted
- Solicitation number
- N6945022R0028
About this file
This document contains a government pre-award inquiry form and responses related to a solicitation for base operations support services at Naval Air Station Key West, Florida. The solicitation requires base operations support services including facility investment, pest control, integrated solid waste management, and utilities management. Services involve HVAC, refrigeration, fire protection, vertical transportation, exhaust hoods and ducts, and water testing and treatment. The document provides responses to contractor questions on inspection and testing dates, personnel requirements, pricing terms, and proposal submission instructions. An amendment will update attachments and clarify requirements for electronic submissions, key personnel resumes, and proposal content and formatting. The Navy is the contracting agency, and the incumbent contractor information is provided in the solicitation.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6945022R0028 Key West BOS
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.
1 3/14/2022 49 C 3.2
The OEM recommends Eddy Current testing be performed every 2-5 years: what year(s) of this contract does Eddy Current testing need to be performed? Government response pending.
2 3/14/2022 49 C 3.2
How many times over the 8 year contract will the Navy want Eddy Current testing on the Evaporator and Condenser? Government response pending.
3 3/14/2022 66 J
J- 15020 00-14
Can the government update the Section J-1502000-14 to provide the customer information for HVAC/Boiler water treatment in order to properly price each system on the ELIN sheet?
A revised attachment J-1502000-14 will be provided in a forthcoming amendment.
4 3/15/2022 9 F 2.3.5
Reference: Solicitation, Section F, spec item 1503020/2.3.5, Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS). Question:
Considering that the Pesticide Use Sheets and Labels and Safety Data Sheets could easily exceed 200 pages, would it be acceptable to the Government to provide these documents after contract award?
Section F will be updated to require submission 15 days after award in a forthcoming amendment.
Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
5 3/15/2022 9 F 3
Reference: Solicitation, Section F, spec item 1503020/3, Contractors Work Plan. Question: Would it be acceptable to the Government to provide the Contractors Work Plan after contract award?
Section F will be updated to require submission 15 days after award in a forthcoming amendment.
6 3/15/2022 16, 17 C 2.7.1.2 2.7.1.3
Reference: Solicitation, Section C, spec item 2.7.1.2, the statement "The Quality Manager or designated alternate shall not be the same person as the SSHO" and spec item 2.7.1.3, the statement "The SSHO shall not be the same person as the project manager." Question:
If the Project Manager meets all the qualifications of the Quality Manager, can the Project Manager fulfil the role of Quality Manager? Government response pending.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
7 3/15/2022
Attachment J-0200000-
12 ELINS
ELIN
Pricing Schedule
Pest Contol Service Orders are provided as a Quantity of EA for the first three customers (CNIC, Army Special Forces, and Navy Gateway Inn & Suites (NGIS), but after these three customers they are shown as quantity of months for all remaining customers and ELINS.
Question: Would the Government please clarify whether remaining customers are to be priced per month, and if so, please provide historical data offerors can price to, and / or either provide the Quantity (EA) for customers to price to for customers after ELIN(s) X003? Government response pending.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
8 3/15/2022 11 C
2.4.1,2 .4.2, 2.4.3, 2.4.4
Reference: Each respective paragraph indicating the Government will not furnish Property, Facilities, Vehicles or Equipment, or Utilities. Question:
Would the Government please clarify whether a laydown area will be provided for a mobile office for operations and work reception and work control functions aboard NAS Key West? Government response pending.
9 3/15/2022 9 F 15030 20/3
Per section F 1503020 the contractor shall submit a work plan in regards to Pest Control in the proposal. There is no mention of this in sections L and M. Is the contractor required to submit a work plan in regards to Pest Control with their proposal submittal? If yes, does it count against the 100 page limit? See GPI Response #4.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
10 3/15/2022 16 C 2.7.1
The Onsite-supervisor is not mentioned in the listed anywhere else in the key personnel requirements. Can the customer clarify if an additional “on-site supervisor” besides the PM, Quality Manager and SSHO is a requirement of the contract? If yes, what are the minimum qualifications for this position? Government response pending.
11 3/15/2022 16 C 2.7.1
Will the government clarify if the contractor is to submit the names of proposed Key Personnel with the proposal?
Names of personnel may be submitted in the proposal but are not required.
12 3/15/2022 9 F- 1503020
Pest Contro l
Per section F 1503020 the contractor shall submit a work plan in regards to Pest Control in the proposal. There is no mention of this in sections L and M. Is the contractor required to submit a Work Plan in regards to Pest Control with their proposal submittal? If yes, does it count against the 100 page limit?
See GPI Response #4.
C- 0200000
2.7.1 Key Person nel
will the government clarify if the contractor is to submit the names of
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
F- 0200000
2.7.1 Key Person nel
14 3/15/2022 16 C- 0200000
2.7.1 Key Person nel
The Onsite-supervisor is not mentioned in the key personnel requirements. Can the customer clarify if an additional “on-site supervisor” besides the PM, Quality Manager and SSHO is a requirement of the contract? If yes, what are the minimum qualifications for this position? Government response pending.
15 3/15/2022 JL-1
ELIN
A013
AA,
A014
AA,
A015
AA
ELINs for Integrated Solid Waste Management for
NEX/JIATF/USCD
A013AA/A014AA/A015AA is missing from the JL-1 Labor hours work sheet. Is this correct or will the government be correcting this?
A revised attachment J-1502000-04 will be provided in a forthcoming amendment.
3/15/2022 proposed Key Personnel with the proposal?
13 See GPI Response #11.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
16 3/15/2022
Wage Determi nation
SCA Wage Determination was provided. The contract references construction work. Will the bidder be expected to price in DBA Wages? If yes, will the government provide the most uptodate DBA
WD?
Yes. Construction Wage Rate Requirements apply to all construction employees performing work on the contract.
The updated wage determinations are provided with Amendment 0002. 0002
17 3/15/2022
J- 0200000-
Non Recuri ng Work
CLIN
ELIN
A701
A Material Price of $1.00 is populated in ELIN A701 Material Costs. Can the Government confirm that this $1.00 for a total of $27,000 is set number and thebidder is not to change this value.
The offeror should not edit the Material Costs provided by the Government.
18 3/15/2022 N/A N/A N/A
How many waste dumpsters are required? How many for recycle and how many for tires?
See attachments J-1503030-04 Recyclable Waste Collection Locations and J-1503030-05 Refuse Waste Collection Locations & Frequency.
19 3/15/2022 N/A N/A N/A Is there a storage area and an office area available at each loctaion? Government response pending.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
20 3/15/2022 N/A N/A N/A Please confirm the frequency of pest control at the hospital.
See attachment J-1503020-05 Frequencies for Scheduled Work.
21 3/15/2022 N/A N/A N/A Is back-flow preventor maintenance included in this contract? Government response pending.
22 3/15/2022 N/A N/A N/A Is the BAS handled the same as the chillers on this contract? Government response pending.
23 3/15/2022 N/A N/A N/A
During the site visit, we were unable to properly see the mess hall kitchen due to military personnel in the area. Can we get photos of the area? Photographs are provided with Amendment 0002. 0002
24 3/15/2022 N/A N/A N/A
The elevator tags showed that the last load test was performed 2014/2016. Is that correct? If not, what is the lastest date of the elevator load tests? The last load testing was performed in August 2021.
25 3/15/2022 N/A N/A N/A What is the date of the last infrared testing? Government response pending.
26 3/15/2022 N/A N/A N/A What is the date of the last eddie current testing? Government response pending.
27 3/15/2022 N/A N/A N/A Please provide the latest chiller annual reports? Government response pending.
28 3/15/2022 17 2.7.1.3 3
Key Personnel states that the SSHO shall not be the same person as the Project Manager.
Please confirm that this requirement is correct. Yes, the requirement is correct as stated in the RFP.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
29 3/15/2022
Attachment J-0200000-
12 + ELINS
ELINs X006 thru X012
In reviewing the ELIN quantities we are unable to determine how the service calls for Pest control relate to ELINs X006 thru X012 and they don’t indicate if they are emergency thru routine as the quantity is listed in months and not each. Would the Government please confirm how these ELINs are broken out for service calls or provide workload data that identifies the breakout? Government response pending.
30 3/15/2022
Would the Government please provide a list and or a map of the facilities where all services shall be provided? We are unable to locate this information within the current workload. Government response pending.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
31 3/15/2022 RFP, pg. 53
L.2
PROPO
SAL
DELIVE
RY
Please clarify whether an electronic submission will be acceptable in lieu of a hard copy proposal. If an electronic submission is acceptable, please clarify either a Government website for submission or POC(s) and Email Addresses for proposal package submission.
No. Hard copy proposals are required in accordance with Section L of the RFP.
32 3/15/2022
(b) Non-cost/pric e Factors:, (1) Factor 1 Corporat e Experien ce:
(i) Solicitati on Submitta l Require ments.
A. 6.a.
Since contractors are allowed to demonstrate corporate affilliate meaningful invovlement participation for past performance to be considered as Prime experience, we respectfully request more than one page to describe this information. Sugguest up to 5 pages allowance.
Offeror's may use more than one page; however, ensure overall non-price proposal submittal does not exceed 100 pages in accordance with Section L of the RFP.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
JM-
1+N694502 2R0028+Co rporate+Exp erience Sheet
Are contractors allowed to expand the corporate experience sheets? If so, is there a restriction on how many pages are allowed in total for each of these corporate experience sheets? We respectfully suggest at least 4-5 pages allowance.
Yes, per Factor 1 in the RFP, Attachment JM-1 may be expanded and is not limited to the two (2) pages provided with the solicitation. However, ensure overall non-price proposal submittal does not exceed 100 pages in accordance with Section L of the RFP.
N6945022R 0028Section C_0001 pg. 16
2.7.1 Key Person nel
Please clarify: 1) whether we are to provide resumes WITH the proposal or AFTER AWARD of the following positions PM, Quality Manger, SSHO and On-Site SSHO;
2) it is acceptable to the customer to dual hat any of these positions; 3) where we are to include the resumes within the proposal. Please also update the RFP with instructions and evaluation criteria if resumes are to be included with the proposal.
1) Resumes are not required with the proposal. Per Section C, the only requirement for resumes after award is for proposed substitutes; 2) Government response pending; 3) See response to 1).
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
35 3/15/2022
Attachment J-0200000-lists the Spec Item as 2.9.7
Attachment J-0200000-04 is a Monthly Report on Labor used for Recurring and Non-Recurring Work lists the Spec Item as 2.9.7 and it should be 2.9.8. It also lists functions that don’t appear to be under this contract. It lisst a reporting for Annex 1501000 – Facility Management and there is no 1501000 in Section C of the documents. Please revise and provide clarification regarding this attachment accordingly.
A revised attachment J-0200000-04 will be provided in a forthcoming amendment.
36 3/15/2022 NA
Please provide the current list of subcontractors for all facilities that support the fire alarm & sprinkler system, chillers, boilers, water treatment, eddy current testing, electrical testing, elevator testing and service, recycling, trash removal, pest control.
The Government does not have privity of contract with subcontractors; therefore, details of current subcontractors will not be provided. The current prime contractor's information is provided in Section A.5 Prior Contract Information of the RFP.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
37 3/15/2022 NA
What is the current number of employees in each labor category?
This information will not be provided. This is a performance based contract; therefore the contractor is responsible for proposing based on the applicable performance objective and standard.
38 3/15/2022 NA
Will pictures from site visits be posted in a timely manner to allow for further evaluation? Photographs provided with Amendment 0002. 0002
39 3/15/2022 NA
Please provide dates where applicable of last inspections on electrical infrared, eddy current testing, periodic chiller maintenance, boiler certifications, roof anchors testing, and sprinkler obstruction test. Government response pending.
40 3/15/2022 46
Section C Item 3.1
Can a 1 year of emergency, urgent, and routine service order history be provided for effective maintenance evaluation? Government response pending.
41 3/15/2022 49
Section C Item 3.2
Can a 1 year of preventative maintenance history be provided for effective maintenance evaluation? Government response pending.
42 3/15/2022 56 L.13.B.1 j
1. Responsibility Determination Binder states 1 Orig. and 1 Copy.
Item J states 2 copies of Responsibility Determination in 1 pdf file on cd. Please clarify. 2 pdfs on 1 CD. 1 pdf on 2 CDs.
One Adobe PDF file of the entire Responsibility Determination information on two CDs is required. See Amendment 0002 for clarification. 0002
43 3/15/2022 56 L.13.B.2 c
2. Price Proposal Binder states 1 Orig. and 1 Copy. Item C states 2 copies of price proposal and 1 pdf file on cd. Please clarify. 2 excels and 1 pdf on 1 CD? 2 excels and 1 pdf on 2 CDs?
One Excel file (ELINs) and one Adobe PDF file of the entire Price Proposal on two CDs is required. See Amendment 0002 for clarification. 0002
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.Date Received Amend No.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE
44 3/15/2022 57 L.13.B.3 c
3. Non-Price Proposal Binder states 1 Orig. and 3 Copies. Item C states 2 copies. Please clarify.
One Excel file (JL-1 Attachment) and one Adobe PDF file of the entire Non-Price Proposal on two CDs is required. See Amendment 0002 for clarification. 0002
45 3/15/2022 57 L.13.B.3 c
Paragraph states 2 copies in one pdf file on cd. Is this 2 files on 1 cd or is this 1 pdf on 2 CDs? See GPI Response #44 0002
46 3/15/2022 NA
Would an extension to the current proposal due date be considered to allow for sufficent evaluation, assembly, and shipping of our proposal. See Amendment 0002. 0002
File details come from the government source that posted it. Updated .