J-0200000-12 ELINS.xlsx
XLSX spreadsheet 624 KB Posted
- Solicitation number
- N6945022R0028
About this file
This solicitation requests base operations support services at Naval Air Station Key West, Florida. The contractor shall provide facility investment such as HVAC, fire protection and vertical transportation maintenance; integrated pest management and solid waste services; and utilities management. The requirement includes labor, management, tools, materials and equipment. Relevant agencies are the Department of the Navy and Naval Facilities Engineering Command. Pricing will be determined through negotiations with the contracting officer. The period of performance is the base period and two option years.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 - Base Period
| Attachment J-0200000-12 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N69450-22-R-0028 | ||||||||
| Line Item 0001 - Recurring Work - Base Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs A001 through A015 | ||||||||
| Customer | ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | |||||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| A001 | CNIC | |||||||
| CNIC | A001AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 23 | EA | |
| CNIC | A001AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 25 | EA | |
| CNIC | A001AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 45 | EA | |
| CNIC | A001AD | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 11 | MO | |
| CNIC | A001AE | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 11 | MO | |
| CNIC | A001AF | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| CNIC | A001AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 11 | MO | |
| CNIC | A001AH | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| CNIC | A001AJ | 1502000 | Inspection, Testing and Certification Program | 3.3.4 | Fire Protection Systems | 11 | MO | |
| CNIC | A001AK | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 11 | MO | |
| CNIC | A001AL | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 11 | MO | |
| CNIC | A001AM | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| CNIC | A001AN | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 75 | EA | |
| CNIC | A001AP | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| CNIC | A001AQ | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 11 | MO | |
| CNIC Subtotal | ||||||||
| A002 | ARMY Special Forces | |||||||
| ARMY SF | A002AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 11 | EA | |
| ARMY SF | A002AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 11 | EA | |
| ARMY SF | A002AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 13 | EA | |
| ARMY SF | A002AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| ARMY SF | A002AF | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| ARMY SF | A002AG | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 11 | MO | |
| ARMY SF | A002AH | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| ARMY SF | A002AJ | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | EA | |
| ARMY SF | A002AK | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| ARMY SF Subtotal | ||||||||
| A003 | Navy Gateway Inn & Suites (NGIS) | |||||||
| NGIS | A003AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 11 | EA | |
| NGIS | A003AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 11 | EA | |
| NGIS | A003AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 11 | EA | |
| NGIS | A003AD | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 11 | MO | |
| NGIS | A003AE | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 11 | MO | |
| NGIS | A003AF | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| NGIS | A003AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 11 | MO | |
| NGIS | A003AH | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| NGIS | A003AJ | 1502000 | Inspection, Testing and Certification Program | 3.3.4 | Fire Protection Systems | 11 | MO | |
| NGIS | A003AK | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 11 | MO | |
| NGIS | A003AM | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 11 | MO | |
| NGIS | A003AN | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| NGIS | A003AP | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 53 | EA | |
| NGIS | A003AQ | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| NGIS | A003AR | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 11 | MO | |
| NGIS Subtotal | ||||||||
| A004 | NBHC BUMED | |||||||
| BUMED | A004AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 11 | EA | |
| BUMED | A004AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 11 | EA | |
| BUMED | A004AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 11 | EA | |
| BUMED | A004AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| BUMED | A004AE | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 11 | MO | |
| BUMED | A004AF | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| BUMED | A004AG | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| BUMED | A004AH | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| BUMED | A0004AJ | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 11 | MO | |
| BUMED Subtotal | ||||||||
| A005 | PWD UEM | |||||||
| PWD UEM | A005AA | 1601000 | Utilities Management | 3.1 | Utilities Operations Support | 25 | EA | |
| PWD Shops Subtotal | ||||||||
| A006 | TARS | |||||||
| TARS | A006AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| TARS | A006AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| TARS | A006AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| TARS Subtotal | ||||||||
| A007 | Defense Commissary Agency (DECA) | |||||||
| DECA | A007AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| DECA | A007AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| DECA | A007AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| DECA Subtotal | ||||||||
| A008 | Navy Research Lab (NRL) | |||||||
| NRL | A008AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| NRL | A008AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| NRL | A008AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| NRL Subtotal | ||||||||
| A009 | HOUSING | |||||||
| HOUSING | A009AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| HOUSING | A009AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| HOUSING | A009AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| HOUSING Subtotal | ||||||||
| A010 | Tactical Combat Training Systems (TCTS) | |||||||
| TCTS | A010AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| TCTS | A010AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| TCTS | A010AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| TCTS Subtotal | ||||||||
| A011 | Defense Logistics Agency (DLA) | |||||||
| DLA | A011AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| DLA | A011AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| DLA | A011AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| DLA Subtotal | ||||||||
| A012 | NELO | |||||||
| NELO | A012AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 11 | MO | |
| NELO | A012AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 11 | MO | |
| NELO | A012AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 11 | MO | |
| NELO Subtotal | ||||||||
| A013 | Navy Exchange (NEX) | |||||||
| NEX | A013AA | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 11 | MO | |
| NEX Subtotal | ||||||||
| A014 | Joint InterAgency Task Force (JIATF) | |||||||
| JIATF | A014AA | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 11 | MO | |
| JIATF Subtotal | ||||||||
| A015 | United States Coast Guard (USCD) | |||||||
| USCG | A015AA | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 11 | MO | |
| USCG Subtotal |
&"Times New Roman,Regular"&A Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
CLIN 0002 - Base Period
| Attachment J-0200000-12 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N69450-22-R-0028 | ||||||
| Line Item 0002 - Non-Recurring Work - Base Period | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN A700 through A731 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Unit Price Labor Work |
| MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |
| 275 | LH | |
| A701 | Material Costs |
| MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700. | 27,500 | EA | $ 1.00 | $ 27,500.00 |
| A702 | Emergency Service Orders - |
| Available on DoD FedMall | Order Facility Investment emergency service orders as necessary when quantities are exhausted for a specific Client ELIN or when a client wants to order an emergency service call who is not covered under the Recurring Work service call section in Spec Item 3.1 of the Facilities Investment Annex. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.1 of Section 1502000 Section C. | 2 | EA |
| A703 | Urgent Service Orders - |
| Available on DoD FedMall | Order Facility Investment urgent service orders as necessary when quantities are exhausted for a specific Client ELIN or when a client wants to order a urgent service call who is not covered under the Recurring Work service call section in Spec Item 3.1 of the Facilities Investment Annex. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.2 of Section 1502000 Section C. | 2 | EA |
| A704 | Routine Service Orders - |
| Available on DoD FedMall | Order Facility Investment routine service orders as necessary when quantities are exhausted for a specific Client ELIN. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.3 of Section 1502000 Section C. | 2 | EA |
| A705 | Bat Control in Buildings |
| Available on DoD FedMall | Provide labor and materials to control/exclude bats from buildings in accordance with state regulations. Time Period to Respond: Same day as ordered. Complete work per time periods specified in J-1503020-11. | 2 | EA | $0.00 |
| A706 | Infestation Bee, Wasp, Hornet, and Stinging Arthropod Control |
| Available on DoD FedMall | Provide labor and materials to control stinging arthropod infestations in and around buildings, structures, and areas. Pests include, but are not limited to, bees, wasps, hornets, carpenter bees, cicada killers, yellow jackets, and solitary wasps (mud daubers, umbrella wasps). European honeybee swarms/nests: Contractor shall contact state or local authorities to determine if local beekeepers can remove honeybee swarms/nests. Time Period to Respond: 4 hours. If swarm, respond immediately at discretion of KO. Complete work per time periods specified in J-1503020-07. | 8 | EA Infestation | $0.00 |
| A707 | Pest Bird Control (including Bird Aircraft Strike Hazard Reduction Activities) |
| Available on DoD FedMall | Provide labor and materials to prevent and control birds inside and outside buildings/structures, and prevent and control birds roosting/nesting on aircraft operation areas. Time Period to Respond: General Bird Control: 3 working days, one day in occupied spaces. BASH: 24 hours BASH Emergency Call: (Mission affected) Immediately. Complete work per time periods specified in J-1503020-11. | 2 | EA Infestation | $0.00 |
| A708 | Filth Fly Control |
| Available on DoD FedMall | Provide labor and materials to prevent and control filth flies including house flies, flesh flies, bottle flies, blow flies, fruit flies, and other related insects that breed or are attracted to garbage and trash in area designated by the KO. Identify source, if applicable. Time Period to Respond: 2 working days. Complete work per time periods specified in J-1503020-07. | 8 | EA Infestation | $0.00 |
| A709 | Fire Ant Control |
| Available on DoD FedMall | Provide labor and materials to prevent and control fire ants indoors and outdoors. Sites include all developed and semi-developed areas and other designated sites. Time Period to Respond: Indoors: Immediately. Outdoors: 1 day. Complete work per time periods specified in J-1503020-07. | 33 | Indoors: 1,000 SF |
| Outdoors: 0.25 acre | $0.00 | ||
| A710 | Flea Control In and Around Buildings and Structures |
| Available on DoD FedMall | Provide labor and materials to control flea infestations in and around buildings and structures. Time Period to Respond: 2 working days. Complete work per time periods specified in J-1503020-06. | 10 | 1,000 SF | $0.00 |
| A711 | Commensal Rodents In and Around Buildings and Structures |
| Available on DoD FedMall | Provide labor and materials to prevent and control rodents indoors or within 75 linear feet of the exterior walls of designated buildings and structures. Rodent pests include, but are not limited to Norway rats, roof rats, house mice, and field mice. Service requires removal of dead animals. Time Period to Respond: Indoors: 1 day. Outdoors: 3 working days. Complete work per time periods specified in J-1503020-11. | 75 | 1,000 SF | $0.00 |
| A712 | Stored Product Pest Control (Arthropods) |
| Available on DoD FedMall | Provide labor and materials to control and prevent stored product pests at designated sites. Time Period to Respond: 3 working days. Complete work per time periods specified in J-1503020-06. | 25 | 1,000 SF | $0.00 |
| A713 | Survey for Termite and Wood Destroying Organisms |
| Available on DoD FedMall | Provide labor and materials to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 1 week. Complete work per time periods specified in J-1503020-08. | 25 | 1,000 SF | $0.00 |
| A714 | Subterranean Termite Control |
| Available on DoD FedMall | Provide labor and materials to control infestations of subterranean termites in accordance with J-1503020-04 (Termite Control Specifications). Time Period to Respond: 7 working days after receipt of the task order. Complete work per time periods specified in J-1503020-12. | 115 | 100 LF | $0.00 |
| A715 | Drywood Termite Control |
| Available on DoD FedMall | Provide labor and materials to prevent, manage, and control Drywood Termites in accordance with J-1503020-04 (Termite Control Specifications). Time Period to Respond: 7 working days after receipt of the task order. Complete work per time periods specified in J-1503020-04. | 180 | 1000 CF | $0.00 |
| A716 | Other Wood Destroying Organism Controls |
| Available on DoD FedMall | Provide labor and materials to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 10 working days. Complete work per time periods specified in J-1503020-08. | 25 | 1000 SF | $0.00 |
| A717 | Tick Survey and Control Outdoors |
| Available on DoD FedMall | Provide labor and materials to survey for and control of ticks outdoors. Time Period to Respond: 3 calendar days. Complete work per time periods specified in J-1503020-01. | 5 | 5,000 SF | $0.00 |
| A718 | Pest Vertebrate Control |
| Available on DoD FedMall | Provide labor and materials to control pest vertebrate animals including, but not limited to, feral dogs and cats, squirrels, skunks, snakes, opossums, raccoons, and mongoose. Comply with local laws and regulations. Time Period to Respond: Within 24 hours. Emergency (animal possibly rabid) or indoors, immediately. Complete work per time periods specified in J-1503020-11. | 6 | EA | $0.00 |
| A719 | Ant Control |
| Available on DoD FedMall | Provide labor and materials to prevent and control ants in and around buildings and structures. Time Period to Respond: 10 working days Complete work per time periods specified in J-1503020-06. | 25 | 1,000 SF | $0.00 |
| A720 | Turf and Ornamental Pest Control |
| Available on DoD FedMall | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work per time periods specified in J-1503020-09. | 3 | 1,000 SF | $0.00 |
| A721 | Cockroach Control |
| Available on DoD FedMall | Provide labor and materials to prevent and control all cockroaches. Time Period to Respond: 3 days. Complete work per time periods specified in J-1503020-06. | 25 | 1,000 SF | $0.00 |
| A722 | Mole Cricket Control |
| Available on DoD FedMall | Provide labor and materials to control mole crickets in lawns. Time Period to Respond: 7 calendar days. Complete work per time periods specified in J-1503020-09. | 2 | 1,000 SF | $0.00 |
| A723 | Miscellaneous Arthropod Pest Control |
| Available on DoD FedMall | Provide labor and materials to prevent and control nuisance arthropod pests in and around buildings and structures. Excludes but is not limited to spiders, silverfish, scorpions, crickets, centipedes, millipedes, boxelder bugs, mites, beetles, etc. (Excludes ants, cockroaches, filth flies, and bees/wasps/hornets covered in separate sections.) Time Period to Respond: 7 days. Complete work per time periods specified in J-1503020-06. | 12 | 1,000 SF | $0.00 |
| A724 | Arthropod Control in Food Handling Establishments |
| Available on DoD FedMall | Provide labor and materials to prevent and control arthropod pests in food handling establishments. Arthropod pests include, but are not limited to, cockroaches, ants (excludes fire ants which are covered under a separate pest group), silverfish, centipedes, ground beetles, fleas, spiders, stored product pests, etc. Time Period to Respond: 24 hours. Complete work per time periods specified in J-1503020-07. | 20 | 1,000 SF | $0.00 |
| A725 | Bed Bug Control |
| Available on DoD FedMall | Provide labor and materials to control bed bugs. Time Period to Respond: 24 hours. Complete work per time periods specified in J-1503020-07. | 15 | EA |
| ROOM | $0.00 | ||
| A726 | Childcare Facilities/Sensiti ve Areas Pest Control (Includes: Schools, Hospital, Veterinary Clinic and Kennels, Child Development Center, Youth Activities Center) |
Available on DoD FedMall Provide labor and materials to prevent and control all nuisance arthropod pests (including, but not limited to), cockroaches, ants, silverfish, spiders, crickets, flies, centipedes, box elder bugs, mites, bees, wasps, other venomous arthropods, AND all species of rodents in areas where children frequent including child care, schools, day care, nurseries and other locations as designated. Time Period to Respond: 2 days, same day if venomous. Complete work per
| time periods specified in J-1503020-07. | 5 | 1,000 SF | $0.00 |
| A727 | Iguana Control |
| Available on DoD FedMall | Provide labor and materials to prevent and control iguanas indoors or within 75 linear feet of the exterior walls of designated buildings and structures. Service requires removal of dead animals. Comply with federal, state and local laws and regulations. Time Period to Respond: 48 hours, immediately if emergency / indoors. Complete work per time periods specified in J-1503020-11. | 25 | EA | $0.00 |
| A728 | Small Reptile Control |
| Available on DoD FedMall | Provide labor and materials to prevent and control small reptiles indoors or within 75 linear feet of the exterior walls of designated buildings and structures. Small reptiles include, but are not limited to anoles, geckos, and skinks. Service requires removal of dead animals.. Time to Respond: 1 day indoors, 3 days outdoors. Complete work per time periods specified in J-1503020-11 | 2 | 1,000 SF | $0.00 |
| A729 | General Waste |
| Available on DoD FedMall | The Contractor shall remove general waste from containers to ensure refuse is properly collected. | 6 | EA | $0.00 |
| A730 | Recyclable Waste |
| Available on DoD FedMall | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 6 | EA | $0.00 |
| A731 | Bulky Waste |
Available on DoD FedMall The Contractor shall remove bulky waste to ensure it is properly collected. 6 EA $0.00
&"Times New Roman,Regular"&A Page &P of &N
CLIN 0003 - 1st Option Period
| Attachment J-0200000-12 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N69450-22-R-0028 | ||||||||
| Line Item 0003 - Recurring Work - 1st Option Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs B001 through B015 | ||||||||
| Customer | ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | |||||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| B001 | CNIC | |||||||
| CNIC | B001AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 25 | EA | |
| CNIC | B001AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 30 | EA | |
| CNIC | B001AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 50 | EA | |
| CNIC | B001AD | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | |
| CNIC | B001AE | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 12 | MO | |
| CNIC | B001AF | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| CNIC | B001AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO | |
| CNIC | B001AH | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| CNIC | B001AJ | 1502000 | Inspection, Testing and Certification Program | 3.3.4 | Fire Protection Systems | 12 | MO | |
| CNIC | B001AK | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 12 | MO | |
| CNIC | B001AL | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 12 | MO | |
| CNIC | B001AM | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| CNIC | B001AN | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 85 | EA | |
| CNIC | B001AP | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| CNIC | B001AQ | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 12 | MO | |
| CNIC Subtotal | ||||||||
| B002 | ARMY Special Forces | |||||||
| ARMY SF | B002AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 12 | EA | |
| ARMY SF | B002AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 12 | EA | |
| ARMY SF | B002AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 15 | EA | |
| ARMY SF | B002AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| ARMY SF | B002AF | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| ARMY SF | B002AG | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 12 | MO | |
| ARMY SF | B002AH | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| ARMY SF | B002AJ | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | EA | |
| ARMY SF | B002AK | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| ARMY SF Subtotal | ||||||||
| B003 | Navy Gateway Inn & Suites (NGIS) | |||||||
| NGIS | B003AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 12 | EA | |
| NGIS | B003AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 12 | EA | |
| NGIS | B003AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 12 | EA | |
| NGIS | B003AD | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | |
| NGIS | B003AE | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 12 | MO | |
| NGIS | B003AF | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| NGIS | B003AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO | |
| NGIS | B003AH | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| NGIS | B003AJ | 1502000 | Inspection, Testing and Certification Program | 3.3.4 | Fire Protection Systems | 12 | MO | |
| NGIS | B003AK | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 12 | MO | |
| NGIS | B003AM | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 12 | MO | |
| NGIS | B003AN | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| NGIS | B003AP | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 53 | EA | |
| NGIS | B003AQ | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| NGIS | B003AR | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 12 | MO | |
| NGIS Subtotal | ||||||||
| B004 | NBHC BUMED | |||||||
| BUMED | B004AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 12 | EA | |
| BUMED | B004AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 12 | EA | |
| BUMED | B004AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 12 | EA | |
| BUMED | B004AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| BUMED | B004AE | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO | |
| BUMED | B004AF | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| BUMED | B004AG | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| BUMED | B004AH | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| BUMED | B0004AJ | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 12 | MO | |
| BUMED Subtotal | ||||||||
| B005 | PWD UEM | |||||||
| PWD UEM | B005AA | 1601000 | Utilities Management | 3.1 | Utilities Operations Support | 25 | EA | |
| PWD Shops Subtotal | ||||||||
| B006 | TARS | |||||||
| TARS | B006AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| TARS | B006AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| TARS | B006AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| TARS Subtotal | ||||||||
| B007 | Defense Commissary Agency (DECA) | |||||||
| DECA | B007AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| DECA | B007AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| DECA | B007AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| DECA Subtotal | ||||||||
| B008 | Navy Research Lab (NRL) | |||||||
| NRL | B008AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| NRL | B008AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| NRL | B008AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| NRL Subtotal | ||||||||
| B009 | HOUSING | |||||||
| HOUSING | B009AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| HOUSING | B009AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| HOUSING | B009AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| HOUSING Subtotal | ||||||||
| B010 | Tactical Combat Training Systems (TCTS) | |||||||
| TCTS | B010AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| TCTS | B010AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| TCTS | B010AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| TCTS Subtotal | ||||||||
| B011 | Defense Logistics Agency (DLA) | |||||||
| DLA | B011AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| DLA | B011AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| DLA | B011AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| DLA Subtotal | ||||||||
| B012 | NELO | |||||||
| NELO | B012AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO | |
| NELO | B012AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | MO | |
| NELO | B012AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO | |
| NELO Subtotal | ||||||||
| B013 | Navy Exchange (NEX) | |||||||
| NEX | B013AA | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 12 | MO | |
| NEX Subtotal | ||||||||
| B014 | Joint InterAgency Task Force (JIATF) | |||||||
| JIATF | B014AA | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 12 | MO | |
| JIATF Subtotal | ||||||||
| B015 | United States Coast Guard (USCD) | |||||||
| USCG | B015AA | 1503030 | Integrated Solid Waste Management | 3 | Integrated Solid Waste Management | 12 | MO | |
| USCG Subtotal |
&"Times New Roman,Regular"&A Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
CLIN 0004 - 1st Option Period
| Attachment J-0200000-12 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N69450-22-R-0028 | ||||||
| Line Item 0004 - Non-Recurring Work - 1st Option Period | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN B700 through B731 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Unit Price Labor Work |
| MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |
| 300 | LH | |
| B701 | Material Costs |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .