This document outlines deliverables required under a solicitation for Base Operations Support Services at Naval Support Activity Panama City, FL and Navy Operational Support Center Tallahassee, FL. The services include Facility Management, Facility Investment, Custodial, Pest Control, Integrated Solid Waste Management, Grounds Maintenance and Landscaping, Pavement Clearance, Environmental, and other related services.
The contractor must submit various reports, plans, schedules, and documentation on a recurring basis as specified in the document. Key deliverables include quality management plans, safety plans, personnel listings, service order reports, preventative maintenance schedules, inspection and testing reports, waste disposal documentation, and environmental monitoring reports. Submission dates range from monthly to annually, and copies must go to the Contracting Officer, Contracting Officer's Representative, and other parties as indicated. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for Base Operations Support Services at the listed locations.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spec. Item 2.6.6
Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify deliverables, as directed by the KO or COR, at no additional cost to the Government.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format. Deliverables shall include the company name, contract number, contract title, date, and shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website.
Each deliverable posting on the website and each email notification shall include the title of the deliverable as stated within Section F, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract. Website failure does not relieve the contractor from providing all deliverables on time by e-mail or other means.
Original Copies
(including original)
0200000/2.2.1.2 N/A
Request to Work Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and COR 1 As required
0200000/2.3.1 N/A Sign-In Sheets and Minutes
Within two working days.
KO, COR and all attendees
1 As required
0200000/2.3.1 N/A Final Revision of Minutes
Within two working days.
KO, COR and all attendees
1 As required
0200000/2.3.4 N/A Permits and Licenses
Before work commences and as requested by the
KO.
KO and COR 1 As specified
0200000/2.3.5 N/A Certificate of Insurance
At least 30 calendar days prior to start of contract performance.
KO and COR 1 As specified
0200000/2.3.10 N/A Phase-in Plan
Within 5 days after award or as requested by the
KO
KO and COR 1 As specified
0200000/2.3.10 N/A Phase-out Plan
Within 5 days after award or as requested by the
KO
KO and COR 1 As specified
0200000/2.6.6.3 List of Personnel Requiring MAXIMO Accounts
At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.
KO and COR 1 As specified
0200000/2.6.7.1 N/A Quality Management Plan
At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.
KO and COR 1 As specified
0200000/2.6.7.2 N/A QC Inspection File
Within five calendar days of completion/ termination of the contract.
KO and COR 1 As specified
Section F – 0200000
Management and Administration
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of
Submission
Distribution
Frequency
(including original)
Section F – 0200000
Management and Administration
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of
Submission
Distribution
Frequency
0200000/2.6.7.3 N/A Contractor Quality Inspection and Surveillance Report
First work day of each month.
KO and COR 1 Monthly
0200000/2.6.8 N/A Property Management Plan
At least 30 calendar days prior to start of contract performance.
KO and COR 1 As specified
0200000/2.7.1 N/A List of Key Personnel and Qualifications
At least 30 calendar days prior to start of contract performance.
KO and COR 1 As specified
0200000/2.7.1 N/A Organizational Chart
At least 15 calendar days prior to start of contract performance.
KO and COR 1 As specified
0200000/2.7.2.6 N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO and COR 1 As specified
0200000/2.7.3 N/A Contractor Labor Hours (eCMRA) Report
No later than 31 October.
KO and COR 1
Annually for labor executed during the period of performance during each Government fiscal year (FY)
0200000/2.8.1 N/A Employee List Upon request. KO and COR 1 As required
0200000/2.8.8 N/A
Personnel Security Investigation (PSI), Fingerprint Card (FD87), and OF-306 Declaration for Federal Employment
Prior to employee access to sensitive unclassified information.
KO and COR 1 As required
0200000/2.9.1 N/A Accident Prevention Plan
At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.
KO and COR 1 As specified
(including original)
Section F – 0200000
Management and Administration
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of
Submission
Distribution
Frequency
0200000/2.9.2 N/A Activity Hazard Analysis
Together with the Accident Prevention Plan and for changes.
KO and COR 1 As specified
0200000/2.9.3 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and for changes.
KO and COR 1 As specified
0200000/2.9.5 J-0200000-04-07
NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and COR 1 As required
0200000/2.9.5 J-0200000-04-07 Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO and COR 1 As required
0200000/2.9.5 J-0200000-04-07 Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO and COR 1 As required
0200000/2.9.7 N/A Monthly On-Site Labor Report
First work day of each month.
KO and COR 1 Monthly
0200000/2.9.8 N/A
OSHA Citations and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and COR 1 As required
0200000/2.9.10 N/A Safety Certifications
At least 15 calendar days prior to start of contract performance and prior to expiration of certifications.
KO and COR 1 As specified
0200000/2.10.1.1 N/A Water Conservation Plan
At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.
KO and COR 1 As specified
0200000/2.10.2.1 N/A Written Sampling Plan
Prior to each sampling event
KO and COR 1 As required
0200000/2.10.2.1 N/A Sampling Results Within 24 hours after receipt of laboratory analysis
KO and COR 1 As required
0200000/2.10.2.2 N/A Class I and II ODS Report
Within 24 hours following delivery of refrigerant to
DLA
KO and COR 1 As required
(including original)
Section F – 0200000
Management and Administration
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of
Submission
Distribution
Frequency
0200000/2.10.2.3 N/A Solid Waste Management Reports
Within three months after start of contract performance and annually by October 10th thereafter
KO and COR 1 As specified
0200000/2.10.2.3 N/A Recycling Weight Ticket Receipts
As Specified KO and COR 2 Quarterly
0200000/2.10.2.5 N/A Waste Stream Determination
At least 30 calendar days prior to start of contract performance.
Annually to verify identification of any new waste stream.
KO and COR 1 Annually
0200000/2.10.2.7 N/A Spill Report Within 48 hours of spill occurrence
KO and COR 1 As required
0200000/ 2.10.2.8 J-0200000-04-04
Emergency Planning and Community Right-To-Know Act (EPCRA) Report
At least 15 calendar days prior to start of contract performance and not less than 10 working days prior to planned use of hazardous material.
KO and COR 2 As specified
0200000/ 2.10.2.8 J-0200000-04-04 Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and COR 2 Annually
0200000/2.10.2.12 N/A Asbestos Containing Material (ACM)
Written notification within 24 hours of discovery
KO and COR 2 As specified
0200000/2.10.2.13 J-0200000-04-05 Hazardous Air Pollutant (HAP) Monthly Data
First work day of each month.
KO and COR 1 Monthly
0200000/2.10.2.13 J-0200000-05 Hazardous Air Pollutant (HAP) Semi-annual Report
Semi-annually by
July 10th and
January 10th
KO and COR 1 Semi-Annually
(including original)
Section F – 0200000
Management and Administration
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of
Submission
Distribution
Frequency
0200000/2.10.3 N/A Sustainable Procurement and Practices Plan
At least 15 calendar days prior to start of contract performance and within 15 calendar days after exercised option periods.
KO and COR 1 Annually
0200000/2.10.3 N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO and COR 1 Annually
0200000/2.10.3.2 N/A Recovered Material Certification
As specified KO and COR 1
When a product containing recovered materials is equal to or better than the original and could be used.
0200000/2.14.1 N/A Detailed Scope of Work and Detailed Estimate
Within two work days
KO and COR 2 As required
0200000 2.14.2 N/A
Notification to the Government for Work Above the Recurring Work Limitations
Within 2 hours
KO, COR,
FMD,
Requirements Branch Head and FMSs
6 As required
0200000/2.15.1.1 N/A Non-Recurring Work Quantities Ordered via FedMall
First work day of each month.
KO and COR 1 Monthly
0200000/2.15.2.1 N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO and COR 1 As required
Annex/ Form
Spec Item Attachment
Number Original/ Copies
Number of Copies
(including original)
1501000/ 2.2.1 N/A Certification and Licenses
Within 15 days after award or as requested by the
KO
KO 1
Once for initial submittal, then as requested
1501000/ 2.3.1 N/A System Access Personnel Listing
Within 30 calendar days after contract award
COR/KO 2
Upon award and any change in personnel
1501000/3.1.1 N/A
MAXIMO
Asset Changes Report
By COB the third workday of each month
COR/KO &
FMD
3 Monthly
Section F - 1501000
Facility Management
DELIVERABLES
Deliverable Title
Date (s) of Submission
Attachment
Number Original/ Copies
Number of Copies
(including original)
1502000/2.2.1 N/A Certification and Licenses
Within 15 days after award or as requested by the KO
KO 1
Once for initial submittal, then as requested
1502000/3.1 N/A Service Order Summary Report
First work day of each month
KO 2 Monthly
1502000/3.2 N/A Preventive Maintenance Program Plan
30 calendar days after contract award
KO 2 Annually
1502000/3.2 N/A Monthly PM Work Schedule
Five work days prior to the beginning of each month KO 1 Monthly
1502000/3.2.12 N/A Auto-Run Report
Within 5 days of the closure of the data collection and reporting cycle
KO 1 Monthly
1502000/3.3 N/A Integrated Maintenance Program Plan
30 calendar days after contract award
KO 2 Annually
1502000/3.3 N/A
Monthly IMP Schedule and IMP Maintenance and Repair Status
Five work days prior to the beginning of each month KO 1 Monthly
1502000/ 3.4 N/A
Inspection, Testing, and Certification Program Summary Report
First work day of each month
KO 2 Monthly
1502000/ 3.4 N/A
Inspection, Testing and Certification Schedule and Equipment Certifications
First work day of each month
KO 2 Monthly
1502000/ 3.4.4 N/A
Monthly Tank Inspection, Testing and Certification
Five work days after the start of each month
KO, COR
and
Environme ntal
Director
3 Monthly
Section F - 1502000
Facility Investment
DELIVERABLES
Deliverable Title Date (s) of Submission
Attachment
Number Original/ Copies
Number of Copies
(including original)
Section F - 1502000
Facility Investment
DELIVERABLES
Deliverable Title Date (s) of Submission
Distribution
Frequency
1502000/ 3.4.4 N/A
Annual Tank Inspection, Testing and Certification
Five work days after the Inspection is completed
KO, COR
and
Environme ntal
Director
3 As Completed
1502000/ 3.4.5 N/A
Inspection and Test Report for Vertical Transportation Equipment
First work day of each month
KO 2 Monthly
1502000/ 3.4.6 N/A
Inspection and Test Report for Engine Test Facilities
First work day of each month
KO 2 Monthly
1502000/ 3.5 N/A Other Recurring Services Program Summary Report
First work day of each month
KO 2 Monthly
1502000/ 3.5.3 N/A
Monitoring, Maintenance and Oil Waste Removal Plan
30 calendar days after contract award
KO 2 Annually
Attachment
Number Original/
Copies
Number of Copies
(including original)
1503010/2.2.
N/A Pathogen Training Certificates
Upon request KO/COR 1 Upon request
1503010/3.1 N/A Annual Work Schedule
Within 15calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
1503010/3.1 N/A Monthly Work Plan First work day of each month and five calendar days prior to implementing any changes to the schedule
KO/COR 2 Monthly
1503010/3.2 N/A Custodial Service Order Report
First work day of each month
KO/COR 2 Monthly
1503010/3.2 N/A Custodial Service Order Report
First work day of each week
KO/COR 2 Weekly
Section F – 1503010
Custodial
DELIVERABLES
Deliverable Title Date (s) of Submission
Original/ Copies
Number of Copies
(including original)
1503020/2.2.1 N/A Copy of State Certification for Contractor Personnel
15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO, PAR, PMC 3 As required
1503020/2.3.1 N/A Copy of Local/State Business License
Prior to contract award.
Copies of renewed licenses shall also be submitted.
KO, PAR 2 1 per state
1503020/2.3.2 N/A Permits 5 days prior to the start of work requiring permits.
KO, PAR 2 As required
1503020/2.3.4 N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO, PAR 2 As required
1503020/2.3.5 J-1503020-02 Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)
With the proposal.
Note: Any proposed changes in pesticide usage shall be submitted for approval at least 10 business days in advance of pesticide use.
KO, PAR, PMC 3
1 for each pesticide per pest as required
1503020/3 N/A Contractor's Work Plan With the proposal. KO, PAR 2 1 per proposal
1503020/3 N/A Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO, PAR 2 As required
1503020/3, 4 N/A Adult Mosquito Catch (per the appropriate Pest Group Sheet)
The same day as collected in a labeled, resealable plastic bag.
Installation Preventive Medicine
Department, KO, PAR
2 As required
1503020/3, 4 N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO, PAR 2 As required
1503020/3, 4 N/A Pharaoh Ant Treatment: Floor Plan Diagram (per the appropriate Pest Group Sheet)
2 calendar days prior to beginning the treatment.
KO, PAR 2 As required
1503020/3, 4 N/A Aerial Spray Operations - FAA Approval (per the appropriate Pest Group Sheet)
24 hours prior to performing aerial operations.
KO, PAR 2 As required
1503020/3.3 J-1503020-09 Report of Pest Management Operations
Electronically once per month by the 15th of the following month (Example: July data must be submitted by August 15) on the format approved by
PMC.
KO, PAR, PMC 3 Monthly
1503020/3.2 N/A Pest Control Service Order
Report By the fifth day of each month
KO/COR 2 Monthly
Section F - 1503020
Pest Control
Annex/Spec Item Form Attachment Number Date(s) of Submission
Distribution
DELIVERABLES
Deliverable Title Frequency
Original/
Number of Copies
(including original)
1503030 /2.3.1 N/A Revenue Receipts As specified KO 12 With invoice/Monthly
1503030 / 2.3.2
N/A Weight Tickets As specified KO 12 With invoice/Monthly
1503030 / 3.1 N/A Solid Waste Collection Schedule
As specified KO 1 15 days after award/Annually
1503030 / 3.1 N/A Annual Recycable Report
5 Working days after the end of the FY
KO, COR
and
Environme ntal
Director
3 Annually
Section F 1503030
ISWM
DELIVERABLES
Annex/ Spec Item
Form Attachment Number Deliverable Title Date (s) of Submission
Attachment
Number Original
Copies (including original)
1503040/2.2.1 N/A Certifications and Training
Within 15 days after award or as requested by the KO
KO 1
Once for initial submittal, then as requested
1503040/3.1.1 N/A Water
Analysis Report
First work day of each month
KO 1 Monthly
Section F ‐ 1503040
Other (Swimming Pools)
DELIVERABLES
Deliverable Title
Date (s) of Submission
Original Copies (including original)
1503050/ 2.2.1
N/A Certification, Training, and Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO/COR 2 Annually and as required by Section H – Special Contract Requirements, FAC 5252.237-9301
Substitutions of Key Personnel (JUN 1994)
1503050/ 2.3.1.1
N/A Business Licensing
Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO/COR 2 As required
1503050/ 2.3.1.4
N/A Planned Pesticide/Herbi cide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted. start and at least 10 business days for any proposed changes.
KO, COR,
PPMC
3 Annually for each pesticide/herbicide, as required.
1503050/ 2.3.1.5
N/A Pest Management Operations Report
Electronically by the 15th of the following month (Example: July data must be submitted by August 15) on the format approved by PMC.
KO, COR,
PPMC
2 Monthly
1503050/ 2.3.2
N/A Permits Within 15 calendar days prior to start of work.
KO/COR 2 As required
1503050/ 2.3.9.1
N/A Water Conservation Plan
Within 15 calendar days prior to contract start.
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
1503050/
N/A Weight Tickets With Invoice KO/COR 2 As Specified
Section F – 1503050
Grounds Maintenance and Landscaping
DELIVERABLES
Spec Item Form Attachment Number
Deliverable Title
Date (s) of Submission
Distribution Frequency
Original Copies (including original)
Section F – 1503050
Grounds Maintenance and Landscaping
DELIVERABLES
Spec Item Form Attachment Number
Deliverable Title
Date (s) of Submission
Distribution Frequency
1503050/
J-0200000-05-02 Recycling Reporting Form
As specified KO/COR 2 With each invoice
1503050/
N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch
Prior to bringing on-board installation and prior to use
KO/COR 2 As Required
1503050/
N/A Contractor Work Schedules
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
1503050/ 3.1.1.3
N/A Soil Analysis Within 15 days after receipt of the test results by the Contractor
KO/COR 2 As Required
1503050/ 3.1.1.3
N/A Top Dressing and Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
1503050/ 3.4
N/A Grounds Maintenance Service Order Summary of Completion Report
By the fifth day of each month
KO/COR 2 Monthly
Original/
Number of Copies
(including original)
1503060 /3.1.1 N/A Pavement Sweeping Schedule
15 working days after award and 15 working days after the start of each option year
KO 4 Annually
Section F - 1503060
Pavement Clearance
DELIVERABLES
Annex/Spec Item
Form Attachment
Number
Deliverable Title
Date (s) of Submission
Attachment
Number Original/ Copies
Number of Copies
(including original)
1800000/2.2.1 N/A Training Plan 15 days after award/ Annually KO 1 Annually
1800000/2.2.1 N/A Training Documentation
15 days after award/ Annually
KO 1 Once
1800000/3.1 N/A Sampling Plan 15 days after award/ Annually
KO/COR/
Installation
Environmental Office
2 Annually
1800000/3.1.1 N/A Sample Collection Logs
7 days after sampling
KO/COR/
Installation
Environmental Office
As
Required
1800000/3.1.2 N/A Field Testing Reports
7 days after testing
KO/COR/
Installation
Environmental Office
As
Required
1800000/3.1.3 N/A Laboratory Analysis Reports
14 days after receipt of sample
KO/COR/
Installation
Environmental Office
As
Required
1800000/3.2.2 N/A Used Oil Disposal and Recycling Summary Report
10 days after the end of the reporting period
KO/COR/
Installation
Environmental Office
2 Annually
1800000/3.4 N/A Storm Water Monitoring Report
10 days after the end of the reporting period
KO/COR/
Installation
Environmental Office
2 Quarterly
1800000/3.5.1 N/A Safe Drinking Water Act Sampling (Annual)
7 days after testing
KO/COR/
Installation
Environmental Office
3 Annually
1800000/3.5.2 N/A Safe Drinking Water Act Sampling (Quarterly)
7 days after testing
KO/COR/
Installation
Environmental Office
3 Quarterly
1800000/3.5.3 N/A Safe Drinking Water Act Sampling (Monthly)
7 days after testing
KO/COR/
Installation
Environmental Office
3 Monthly
Section F - 1800000
Environmental
DELIVERABLES
Deliverable Title Date (s) of Submission
Attachment
Number Original/ Copies
Number of Copies
(including original)
Section F - 1800000
Environmental
DELIVERABLES
Deliverable Title Date (s) of Submission
Distribution
Frequency
1800000/3.7 N/A
Environmental Service Order Summary of Completion Report
By the fifth day of each month
KO/COR/
Installation
Environmental Office
2 Monthly
| Section F - Copy.pdf |
| Section F NSA PC BOS Revised.pdf |
| Section F NSA PC BOS Revised - 1.pdf |
| Section F NSA PC BOS Revised - 2.pdf |
| Section F NSA PC BOS Revised - 3.pdf |
File details come from the government source that posted it. Updated .