N6945021R0056 Section F_0002.pdf
PDF 148 KB Posted
- Solicitation number
- N6945021R0056
About this file
This document outlines the deliverables required under a solicitation for Base Operations Support Services at two Navy facilities. Key deliverables include facility management, facility investment, custodial services, pest control, integrated solid waste management, grounds maintenance and landscaping, pavement clearance, and environmental services. Many deliverables are required on a recurring basis, such as monthly reports and schedules. Other deliverables include initial plans and certifications due within 15 days of award. The solicitation is for the Naval Support Activity in Panama City, Florida and the Navy Operational Support Center in Tallahassee, Florida. The services will be provided by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration
N6945021R0056
Amendment 0002
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes
Within two working days
KO, COR
and all attendees
1 As Required
2.3.1 N/A Final Revision of
Minutes
Within two working days
KO, COR
and all attendees
1 As Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.10 N/A Phase-in Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As required
2.3.10 N/A Phase-out Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As required
2.6.8.3 N/A List of personnel
requiring access to Government’s Maximo
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.9.3 N/A Contractor Quality
Inspection and Surveillance Report
First work day of each month.
KO and
COR
1 Monthly
2.6.8 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.7.1 N/A List of Key
Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31 October
KO and
COR
1 Annually for labor executed during the period of performanc e during each Governmen t fiscal year
(FY)
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As required
2.8.8 N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
and
Security Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security Manager
1 As required
2.9.1 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.9.2 N/A Activity Hazard
Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.3 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.5 J-0200000-05-
NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.9.5 J-0200000-05-
Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.5 J-0200000-05-
Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.10 N/A Safety Inspection
and Monitoring Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy Measurement Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 N/A Sampling Plan Prior to Sampling KO and
COR
1 As required
2.10.2.1 N/A Laboratory
Analysis
Upon Request KO and
COR
1 As specified
2.10.2.2 N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
1 As required
2.10.2.3 J-0200000-05 Solid Waste
Management and Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
2.10.2.3 J-0200000-05 Summary Solid
Waste Management and Recycling Report
By October 10th KO and
COR
1 Annually
2.10.2.5 N/A Waste Stream
Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
required
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.10.2.8 N/A Emergency
Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.8 J-0200000-05 Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.12 N/A Asbestos
Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
1 As specified
2.10.2.13 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation Environme ntal Division, City, State, and EPA
1 Semi-annually
2.10.2.13 N/A Hazardous Air
Pollutants Monthly Data
First workday of each month.
KO, COR,
Installation Environme ntal Division
1 Monthly
2.10.3 N/A Sustainable
Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
2.10.3 N/A Sustainable
Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.10.3.2 N/A Recovered
Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Mission Essential
Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
2.11 N/A Mission
Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.14.1 Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.14.2 N/A Notification to the
Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
1 As required
2.15.1.1 N/A Non-Recurring
Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
Section F – 1501000 Facility Management
Form Attachmen t Number Deliverable Title
Date (s) of Submission
Distribution
Frequency Original/ Copies
Number of Copies (includin g original)
2.2.1 N/A Certification and
Licenses
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
2.3.1 N/A System Access
Personnel Listing
Within 30 calendar days after contract award
COR/KO 2 Upon award and any change in personnel
3.1.1 N/A MAXIMO Asset
Changes Report
By COB the third workday of each month
COR/KO
& FMD
3 Monthly
Section F – 1502000 Facility Investment
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original / Copies
Number of Copies
(including original)
2.2.1 N/A
Certification and Licenses
Within 15 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested
3.1 N/A Service Order
Summary Report
First work day of each month
KO 2 Monthly
3.2 N/A
Preventive Maintenance Program Plan
30 calendar days after contract award
KO 2 Annually
3.2 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO 1 Monthly
3.2.912 N/A
Auto-Run Report Within 5 days of the closure of the data collection and reporting cycle
3.3 N/A
Integrated Maintenance Program Plan
30 calendar days after contract award
KO 2 Annually
3.3 N/A Monthly IMP
Schedule and IMP Maintenance and Repair Status
Five work days prior to the beginning of each month
3.4 N/A
Inspection, Testing, and Certification Program Summary Report
First work day of each month
3.4 N/A
Inspection, Testing and Certification Schedule and Equipment Certifications
First work day of each month
3.4.4 N/A
Monthly Tank and Certification
Five work days after the start of each month
KO,
COR and Environ mental
Director
3 Monthly
3.4.4 N/A
Annual Tank and Certification
Five work days after the
Inspection is completed
KO,
COR and Environ mental
Director
3 As Completed
3.4.5 N/A
Inspection and Test Report for Vertical
First work day of each month
Section F – 1502000 Facility Investment
Transportation Equipment
3.4.6 N/A
Inspection and Test Report for Engine Test Facilities
First work day of each month
3.5 N/A
Other Recurring Services Program Summary Report
First work day of each month
3.5.3 N/A
Monitoring, Maintenance and Oil Waste Removal Plan
30 calendar days after contract award
KO 2 Annually
Section F – 1503010 Custodial
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original/ Copies
Number of Copies (including original)
2.2.1 N/A Pathogen
Training Certificates
Upon request KO/COR 1 Upon request
3.1 N/A Annual Work
Schedule
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
3.1 N/A Monthly Work
Plan
First work day of each month and five calendar days prior to implementing any changes to the schedule
KO/COR 2 Monthly
3.2 N/A Custodial Service
Order Report
First work day of each month
KO/COR 2 Monthly
Section F – 1503020 Pest Control
Form Attachment
Number
Deliverable Title Date(s) of
Submission
Distribution Frequency
Original/ Copies
Number of Copies (includin g original)
2.2.1 N/A Copy of State
Certification for Contractor Personnel
15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO, PAR,
PMC
3 As required
2.3.1 N/A Copy of
Local/State Business License
Prior to contract award.
Copies of renewed licenses shall also be submitted.
KO, PAR 2 1 per state
2.3.2 N/A Permits 5 days prior to
the start of work requiring permits.
KO, PAR 2 As required
2.3.4 N/A Ultra-Low Volume
(ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO, PAR 2 As required
2.3.5 J-1503020-02 Planned Pesticide
Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)
With the proposal.
Note: Any proposed changes in pesticide usage shall be submitted for approval at least 10 business days in advance of pesticide use.
KO, PAR,
PMC
3 1 for each pesticide per pest as required
3 N/A Contractor's Work Plan
With the proposal.
KO, PAR 2 1 per proposal
Section F – 1503020 Pest Control
Form Attachment
Number
Deliverable Title Date(s) of
Submission
Distribution Frequency
Original/ Copies
Number of Copies (includin g original)
3 N/A Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO, PAR 2 As required
3, 4 N/A Adult Mosquito Catch (per the appropriate Pest Group Sheet)
The same day as collected in a labeled, resealable plastic bag.
Installation Preventive Medicine
Department, KO, PAR
2 As required
3, 4 N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO, PAR 2 As required
3, 4 N/A Pharaoh Ant Treatment: Floor Plan Diagram (per the appropriate Pest Group Sheet)
2 calendar days prior to beginning the treatment.
KO, PAR 2 As required
3, 4 N/A Aerial Spray Operations - FAA Approval (per the appropriate Pest Group Sheet)
24 hours prior to performing aerial operations.
KO, PAR 2 As required
3.3 J-1503020-09 Report of Pest
Management Operations
Electronically once per month by the 15th of the following month (Example:
July data must be submitted by August 15) on the format approved by
PMC.
KO, PAR,
PMC
3 Monthly
3.2 N/A Pest Control
Service Order Report
By the fifth day of each month.
KO, COR 2 Monthly
Section F – 1503030 Integrated Solid Waste Management
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original/
Copies
Number of Copies (including original)
2.3.1 N/A Revenue
Receipts
As specified
KO 12 With invoice/Monthly
2.3.2 N/A Weight Tickets As
specified
KO 12 With invoice/Monthly
3.1 N/A Solid Waste
Collection Schedule
As specified
KO 1 15 days after award/Annually
3.1 N/A Annual
Recyclable Report
5 Working days after the end of the FY
KO, COR and Environmental
Director
3 Annually
Section F – 1503040 Other (Swimming Pools)
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.2.1 N/A Certifications and
Training
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
3.1.1 N/A Water Analysis
Report
First work day of each
Section F – 1503050 Grounds Maintenance and Landscaping
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.2.1 N/A Certification, Training, and Licensing
Within 15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO/COR 2 Annually and as required by Section H – Special Contract Requirements, FAC 5252.237-
9301 Substitutions of Key Personnel
(JUN 1994)
2.3.1.1 N/A Business
Licensing
Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO/COR 2 As required
2.3.1.4 N/A Planned
Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO,
COR,
PPMC
3 Annually for each pesticide/herbicide, as required.
2.3.1.5 N/A Pest
Management Operations Report
Electronically by the 15th of the following month (Example:
July data must be submitted by August 15) on the format approved by
PMC.
KO,
COR,
PPMC
2 Monthly
2.3.2 N/A Permits Within 15
calendar days prior to start of work.
KO/COR 2 As required
2.3.9.1 N/A Water
Conservation Plan
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
Section F – 1503050 Grounds Maintenance and Landscaping
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
3 N/A Weight Tickets
With Invoice KO/COR 2 As Specified
3 J-0200000- 05-02
Recycling Reporting Form
As specified KO/COR 2 With each invoice
3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch
Prior to bringing on-board installation and prior to use
KO/COR 2 As Required
3 N/A Contractor Work Schedules
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
3.1.1.3 N/A Soil Analysis Within 15
days after receipt of the test results by the Contractor
KO/COR 2 As Required
3.1.1.3 N/A Top Dressing
and Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3.4 N/A Grounds
Maintenance Service Order Summary of Completion Report
By the fifth day of each
KO/COR 2 Monthly
Section F – 1503060 Pavement Clearance
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original/
Copies
Number of Copies (including original)
3.1.1 N/A Pavement
Sweeping Schedule
15 working days after award and 15 working days after the start of each option year
KO 4 Annually
Section F – 1800000 Environmental
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original/ Copies
Number of Copies
(including original)
2.2.1 N/A Training Plan 15 days after
award/
Annually
KO 1 Annually
2.2.1 N/A Training
Documentation
15 days after award/
Annually
KO 1 Once
3.1 N/A Sampling Plan 15 days after
award/
Annually
KO/COR
Installation
Environmental Office
3 Annually
3.1.1 N/A Sample Collection
Logs
7 days after sampling
KO/COR
Installation
Environmental Office
3 As Required
3.1.2 N/A Field Testing
Reports
7 days after testing
KO/COR
Installation
Environmental Office
3 As Required
3.1.3 N/A Laboratory
Analysis Reports
14 days after receipt of sample
KO/COR
Installation
Environmental Office
3 As Required
3.2.2 N/A Used Oil Disposal
and Recycling Summary Report
10 days after the end of the reporting period
KO/COR
Installation
Environmental Office
3 Annually
3.4 N/A Storm Water
Monitoring Report
10 days after the end of the reporting period
KO/COR
Installation
Environmental Office
3 Quarterly
3.5.1 N/A Safe Drinking
Water Act Sampling (Annual)
7 days after testing
KO/COR
Installation
Environmental Office
3 As Required
3.5.2 N/A Safe Drinking
Water Act Sampling (Quarterly)
7 days after testing
KO/COR
Installation
Environmental Office
3 As Required
3.5.3 N/A Safe Drinking
Water Act Sampling (Monthly)
7 days after testing
KO/COR
Installation
Environmental Office
3 Annually
3.7 N/A Environmental
Service Order Summary of Completion Report
By the fifth day of each month
KO/COR
Installation
Environmental Office
3 Quarterly