N6945020R0031_JM2_Safety_Data.docx

DOCX document 15 KB Posted

Attached to
Base Operations Support (BOS) Services at NOSC Miami, FL, NOSC West Palm Beach, FL and NSWCCD Dania Beach, FL
Solicitation number
N69450-20-R-0031
Issued by

View the file

Other files

File Type Posted
N6945020R0031_ RFP_0005.pdf PDF
JL-9_N6945020R0031_GPI_Responses0004.pdf PDF
N6945020R0031_site_visit_brief.pdf PDF
N6945020R0031_site_visit_attendee.pdf PDF
N6945020R0031_ RFP_0004.pdf PDF
J020000015_ELINs_Amend0003.xlsx XLSX spreadsheet
N6945020R0031_RFP_0003.pdf PDF
N6945020R0031_SectionJ_Amend0003.pdf PDF
N6945020R0031_JL6_GPI_Responses0003.pdf PDF
N6945020R0031_SectionC_Amend003.pdf PDF
N6945020R0031_Site_Visit_Itinerary.pdf PDF
J020000006_SERVICE_PROVIDER_INFORMATION_Amend0003.xlsx XLSX spreadsheet
N6945020R0031_0002.pdf PDF
JL-6_N6945020R0031_GPI_Responses0002.pdf PDF
J150200007_HVACandRefrigerationSystems_Amend0001.xlsx XLSX spreadsheet
JL-5_N6945020R0031_GPIs_0001.pdf PDF
N6945020R0031_SectionJ_Amend0001.pdf PDF
N6945020R0031_RFP_Amend0001.pdf PDF
N6945020R0031_SectionJ.pdf PDF
N6945020R0031_RFP.pdf PDF
J020000006_SERVICE_PROVIDER_INFORMATION.xlsx XLSX spreadsheet
N6945020R0031_JL3_AMAG.xls XLS spreadsheet
J020000008_ASSET_SPECIFICATION.xlsx XLSX spreadsheet
N6945020R0031_Service_PalmBeach_WD2015_4573_Rev11.pdf PDF
N6945020R0031_Construction_Broward_WD02_2020.pdf PDF
N6945020R0031_SectionC.pdf PDF
N6945020R0031_JL4_SECNAV5512.pdf PDF
N6945020R0031_Service_Broward_WD2015_4535_Rev14.pdf PDF
N6945020R0031_Construction_PalmBeach_WD02_2020.pdf PDF
N6945020R0031_SectionF.pdf PDF
J020000009_CHARACTERISTIC_METER_READING_INFORMATION.xlsx XLSX spreadsheet
N6945020R0031_JM1_Corporate_Experience.docx DOCX document
N6945020R0031_Service_Miami_WD2015_4543_Rev13.pdf PDF
J020000007_ASSET_INFORMATION.xlsx XLSX spreadsheet
N6945020R0031_JM3_PPQ.doc DOC document
J020000013_CNRSEINST41011.pdf PDF
N6945020R0031_JL1_Labor_Hours.xlsx XLSX spreadsheet
N6945020R0031_Service_Elevator_WD1986-0452_Rev45.pdf PDF
J150200007_HVACandRefrigeration_Systems.xlsx XLSX spreadsheet
N6945020R0031_Construction_Miami_WD02_2020.pdf PDF
J020000015_ELINs.xlsx XLSX spreadsheet
N6945020R0031_JL2_GPIF.xls XLS spreadsheet
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAFETY DATA SHEET

This form is to be completed by the offeror. Use this form to provide safety information for the Safety factor. EMR, DART and TRC rates shall not be submitted for subcontractors.

Joint Venture (JV) or Partnership: Provide a Safety Data Sheet for each contractor who is part of the JV or partnership; however, only one safety narrative is required.

1. Offeror Name:

Name of JV partner providing the information below (if applicable):

Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:

Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.

2. Experience Modification Rate (EMR):
2019
2018
2017

2a. Explain any extenuating circumstances resulting in any EMRs greater than 1.0:

2b. Explain any upward or downward EMR trends:

2c. If you do not have an EMR for a given year, state so here and explain why:

3. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
2019
2018
2017

3a. Explain any extenuating circumstances resulting in any DART Rates of 3.0 or greater:

3b. Explain any upward or downward DART Rate trends:

3c. If you do not have a DART Rate for a given year, state so here and explain why:

4. Total Recordable Case (TRC) Rate
2019
2018
2017

4a. Explain any extenuating circumstances resulting in any TRC Rates of 4.5 or greater:

4b. Explain any upward or downward TRC Rate trends:

4c. If you do not have a DART Rate for a given year, state so here and explain why:

SAFETY DATA SHEET (Continuation)

5. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed 2 pages. Any additional pages will not be considered.

Describe the plan that the offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:

Describe any innovative methods that the offeror will employ to ensure and monitor safe work practices at self-performed and/or all subcontractor levels:

Describe proposed methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.

File details come from the government source that posted it. Updated .