Answers to Industry Questions

View the file

Other files

File Type Posted
Q&A_092817.docx DOCX document
Attachment_(2)_Government_Furnished_Equipment_(GFE)_Production_Support_Asset_List_RevA.pdf PDF
Att_2_L-2_Vol_2_T-1_Technical_CRM_09132017.xlsx XLSX spreadsheet
Amendment_0004.docx DOCX document
Questions_and_Answers.docx DOCX document
Amendment_0003.docx DOCX document
Questions_&_Answers_0003.docx DOCX document
N68335-17-R-0129-0003_Conformed_Copy.docx DOCX document
eCASS_RFP_Questions_&_Answers.docx DOCX document
N68335-17-R-0129-0002_Conformed_Copy.docx DOCX document
Q&A_for_0002.docx DOCX document
N68335-17-R-0129-0002_Amendment.docx DOCX document
N68335-17-R-0129_Amendment_0001.pdf PDF
N68335-17-R-0129_conform_copy.pdf PDF
N68335-17-R-0129_eCASS_final_RFP.docx DOCX document
eCASS_FRP_2_RFP_Attachment_1_-_Technical_Data_Distribution_Statements_-_2017.07.27.pdf PDF
Att_2_L-2_Vol_2_T-1_Technical_CRM_08142017.xlsx XLSX spreadsheet
eCASS_FRP_2_RFP_Attachment_6_-_CDRLs_-_2017.08.03.pdf PDF
Att_6_L-6_Vol_3__PP-1_PP_Cont_Data_08112017.xlsx XLSX spreadsheet
Att_7_L-7_Vol_4_Price_Tables_20170815_RevB.xlsx XLSX spreadsheet
Attachment_(3)_CASS_Reuse_Items_List_for_eCASS_Production.xlsx XLSX spreadsheet
Attachment_(2)_Government_Furnished_Equipment_(GFE)_Production_Support_Asset_List.xlsx XLSX spreadsheet
N68335-17-R-0129__eCASS_FRP2_FRFP.docx DOCX document
Industry_Day_Questions_LLB.pdf PDF
Industry_Day_Attendee_List.pdf PDF
eCASS_Pre-Sol_Conference_Brief_R4_final_after_legal_review_LLB.pdf PDF
Att_1_L-1_Vol_1_ES_Tables_03132017.xlsx XLSX spreadsheet
Att_2_L-2_Vol_2_T-1_Technical_CRM_050217.xlsx XLSX spreadsheet
eCASS_FRP_2_RFP_Attachment_8_-_eCASS_PHS&T_Plan_-_2008.11.17.pdf PDF
eCASS_FRP_2_RFP_Attachment_6_-_CDRLs_-_2017.06.13.pdf PDF
Att_7_L-7_Vol_4_Price_Tables_20170605.xlsx XLSX spreadsheet
Att_6_L-6_Vol_3__PP-1_PP_Cont_Data_03132017.xlsx XLSX spreadsheet
Att_5_L-5_Vol_3_PPQ_050217.docx DOCX document
eCASS_FRP_2_RFP_Attachment_7_-_CDRL_Addressee_List_-_2017.05.17.pdf PDF
eCASS_FRP_2_RFP_Attachment_1_-_Technical_Document_Distribution_Statements_-_2017.05.17_legal.pdf PDF
DRFP_N68335-17-R-0129.docx DOCX document
eCASS_FRP_2_RFP_Attachment_9_-_Reliability_and_Maintainability_Program_Plan_-_2017.06.06.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N68335-17-R-0129

Amendment 0001 Questions and Answers:

1. Did the Government receive at least two competent/viable Small Business responses? When you state that the SBA has determined this procurement will be full and open, did you mean NAVAIR Small

Business Advocate (SBA) or Small Business Administration (SBA)?

Answer: As a result of the market research which includes responses from the RFI, the NAVAIR Small

Business Advocate and the Small Business Administration have found this procurement appropriate for a full and open competition.

3. Are all the ECPs incorporated?

Answer: Engineering Change Notices (eCNs) will be provided in the supplement to Attachment 4 -

TDP.

4. It is believed that the following were developed under contract N68335-10-C-0225.

a. For all mechanical details and assemblies: 3D models and silkscreenartwork files.

b. For Circuit Card details/assemblies: Gerber files and drill files for

一 i.4027AS0981

一 ii.4027AS0600

一 iii.4027AS0824

一 iv.4027AS0982

一 v.3528AS521

Can these be provided?

Answer: All drawings cited will be provided in the supplement to attachment 4.

4. The following procedure was not included in the Draft RFP documentation:

a. Lockheed procedure R17485

Please confirm this will be included in the Final RFP documentation.

Answer: Procedure R17485 is not required.

5. The following assemblies are missing Bill of Materials (BOM) from the provided Draft RFP drawing package.

a.4027AS0808 b.2055AS375 c.4027AS0432 d.4027AS0758

Please confirm these will be provided with the Final RFP.

Answer: All P/Ls (BOMs) cited will be addressed in the supplement to Attachment 4.

7. The following drawings were not included with the Draft RFP documentation:

a.4027AS0658 b.2055AS334 c.2055AS484 d.3791AS131 e.2055AS468 f.2055AS462 g.2055AS304

h. 1894AS914

i. 2055AS435

j. 1894AS674

k. 1894AS969

l. 2055AS381

m. 1894AS652

n. 1894AS653

o. 1895AS053

p. 3528AS242

q. 2055AS643

r. 3528AS522

s. 3528AS523

t. 4027AS1567

u. 3528AS251

v. 3528AS998

w. 4027AS0630

x. 4027AS0632

y. 4027AS0977

z. 2037AS630

aa. 2042AS512

bb. 3528AS300 (-5 drawing only)

cc. 2046AS152

dd. 2061AS540

ee. 4027AS0614

ff. 4027AS0615

gg. 4027AS0617

hh. 4027AS0619

ii. 4027AS0621

jj. 4027AS0709

kk. 4027AS0710

ll. 4027AS0711

mm. 4027AS0712

nn. 4027AS0714

oo. 4027AS0717

pp. 4027AS0718

qq. 4027AS0719

rr. 4027AS0721

ss. 4027AS0722

tt. 4027AS0723

uu. 4027AS0736 vv.4027AS0738

ww. 4027AS0739 xx.4027AS0789

yy. 4027AS0790

zz. 4027AS0894 aaa. 4027AS0895 bbb. 4027AS0896 ccc. 4027AS0897 ddd. 4027AS0898 eee. 4027AS0899 fff. 4027AS0901 ggg. 4027AS0953 hhh. 4027AS0956 iii.4027AS2011 jjj. 4027AS2014 kkk. 4027AS2015

Please confirm this will be provided with the Final RFP drawing package

Answer: All drawings cited will be addressed in the supplement to Attachment 4.