N68335-17-R-0129
Amendment 0001 Questions and Answers:
1. Did the Government receive at least two competent/viable Small Business responses? When you state that the SBA has determined this procurement will be full and open, did you mean NAVAIR Small
Business Advocate (SBA) or Small Business Administration (SBA)?
Answer: As a result of the market research which includes responses from the RFI, the NAVAIR Small
Business Advocate and the Small Business Administration have found this procurement appropriate for a full and open competition.
3. Are all the ECPs incorporated?
Answer: Engineering Change Notices (eCNs) will be provided in the supplement to Attachment 4 -
TDP.
4. It is believed that the following were developed under contract N68335-10-C-0225.
a. For all mechanical details and assemblies: 3D models and silkscreenartwork files.
b. For Circuit Card details/assemblies: Gerber files and drill files for
一 i.4027AS0981
一 ii.4027AS0600
一 iii.4027AS0824
一 iv.4027AS0982
一 v.3528AS521
Can these be provided?
Answer: All drawings cited will be provided in the supplement to attachment 4.
4. The following procedure was not included in the Draft RFP documentation:
a. Lockheed procedure R17485
Please confirm this will be included in the Final RFP documentation.
Answer: Procedure R17485 is not required.
5. The following assemblies are missing Bill of Materials (BOM) from the provided Draft RFP drawing package.
a.4027AS0808 b.2055AS375 c.4027AS0432 d.4027AS0758
Please confirm these will be provided with the Final RFP.
Answer: All P/Ls (BOMs) cited will be addressed in the supplement to Attachment 4.
7. The following drawings were not included with the Draft RFP documentation:
a.4027AS0658 b.2055AS334 c.2055AS484 d.3791AS131 e.2055AS468 f.2055AS462 g.2055AS304
h. 1894AS914
i. 2055AS435
j. 1894AS674
k. 1894AS969
l. 2055AS381
m. 1894AS652
n. 1894AS653
o. 1895AS053
p. 3528AS242
q. 2055AS643
r. 3528AS522
s. 3528AS523
t. 4027AS1567
u. 3528AS251
v. 3528AS998
w. 4027AS0630
x. 4027AS0632
y. 4027AS0977
z. 2037AS630
aa. 2042AS512
bb. 3528AS300 (-5 drawing only)
cc. 2046AS152
dd. 2061AS540
ee. 4027AS0614
ff. 4027AS0615
gg. 4027AS0617
hh. 4027AS0619
ii. 4027AS0621
jj. 4027AS0709
kk. 4027AS0710
ll. 4027AS0711
mm. 4027AS0712
nn. 4027AS0714
oo. 4027AS0717
pp. 4027AS0718
qq. 4027AS0719
rr. 4027AS0721
ss. 4027AS0722
tt. 4027AS0723
uu. 4027AS0736 vv.4027AS0738
ww. 4027AS0739 xx.4027AS0789
yy. 4027AS0790
zz. 4027AS0894 aaa. 4027AS0895 bbb. 4027AS0896 ccc. 4027AS0897 ddd. 4027AS0898 eee. 4027AS0899 fff. 4027AS0901 ggg. 4027AS0953 hhh. 4027AS0956 iii.4027AS2011 jjj. 4027AS2014 kkk. 4027AS2015
Please confirm this will be provided with the Final RFP drawing package
Answer: All drawings cited will be addressed in the supplement to Attachment 4.