N68335-17-R-0129 Questions and Answers:
1. Reference: RFP Attachment 4, Technical Data Package We reviewed the Updated Drawing package and determined the following files are missing. There is insufficient data for us to price the
· MISSING GERBERS/DRILL DATA
· 4027AS0981
· 4027AS0600
· 4027AS0824
· 4027AS0982
· 3528AS521
Respectfully request an extension of 28 days after receipt of the Gerber files Answer:
- 4027AS0981 is a PWA, not a PWB (use 4027AS0982), so Gerber files/drill data is not applicable.
- 3528AS521 is part of the GFE for the HP MEK, so Gerber files/drill data is not applicable.
- 4027AS0600 is a PWB and the drawing provide indicates material required, size, and number of layers which the government team feels is sufficient to estimate as a part of the associated PWA.
- 4027AS0824 is a PWB and the drawing provided indicates material required, size, and number of layers which the government team feels is sufficient to estimate as a part of the associated PWA.
- 4027AS0982 is a PWB and the drawing provide indicates material required, size, and number of layers which the government team feels is sufficient to estimate as a part of the associated PWA.
No extension will be granted at this time.
Gerber files and drill data will be provided prior to Award.
2. Reference: RFP, Sec. F: “The Delivery Schedule from the proposed IMS will be incorporated into the contract...The period of performance (POP) for CLINS 0017, 0018 and 0019 shall be for the duration of the base year, no longer than 36 months, and will end upon acceptance of the units.”
Question: Does the Navy want a schedule for the entire base contract with yearly pricing for CLINS 0017, 0018 and 0019?
Answer: The schedule is for an entire base year. The technical data deliverables, CLIN 0018, would be included in the schedule but the Engineering services, CLIN 0017 and travel CLIN 0019, would be as required and therefore is not expected to be in the schedule. CLIN 0018 (data) is not separately priced. Pricing for CLINs 0017 and 0019 are to be included in Sections B and the Section L pricing table, Attachment L-7.
3. Reference: RFP Section L, Part A, Sec. 3.0, top of pg. 208 and Table G-3: “The title and table of contents pages, as well as tables, are not included in the suggested page count.”
Reference: RFP, Section L, Part B, Sec. 1.d: “Contract Administration” contents Question: Do the SF33, Section K and Section F documents count against the Volume 1 25-page limitation? .
Answer: it is a suggested page amount, not a limit.
4. Reference: RFP Amendment 0001, Section A: Page 1, block 9: “The proposal submittal date has been extended from 18 September 2017 to 26 September 2017”, extending the proposal due date by eight days.
Reference: FBO RFP Synopsis, 18 August 2017: “Any questions/comments on the RFP package are to be sent to both Government Contract POCs by 1200 EST 1 September 2017 to ensure that there is enough time to respond prior to RFP close.”
Question: May the due date to submit questions also be extended by eight days, to 9 September 2017?
Answer: the due date to submit questions is hereby extended to 9/12/17.