eCASS_FRP_2_RFP_Attachment_6_-_CDRLs_-_2017.06.13.pdf
PDF 434 KB Posted
- Attached to
- eCASS Production Full Rate Production 2
- Solicitation number
- N68335-17-R-0129
About this file
Attachment 6 - CDRLs
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eCASS Contract Data Requirements List Page 1 of 16 eCASS FRP 2 CDRL Package
A001 - A00C Engineering Data B001 - B003 Admin and Management Data
CDRL Title/Subtitle Paragraph(s)
A001 Configuration Status Accounting Information 3.1.3 A002 Manufacturing and Production Plan (M&PP) 3.1.4, 3.1.4.6 A003 Documentation of Commercially Available/Privately Developed
Software 3.1.5.2
A004 Test Procedure 3.1.6.3.1, 3.1.6.3.2
A005 Test/Inspection Report 3.1.6.3.1, 3.1.6.3.2, 3.1.6.8
A006 Data Accession List 3.2.4.1 A007 Technical Report and Study/Services/Problem Identification
Report (PIR) 3.2.6, 3.2.8.1, 3.2.8.2, 3.2.12
A008 Engineering Change Proposal (ECP) 3.2.8.2, 3.2.8.4 A009 Request for Variance (RFV) 3.2.8.5 A00A Reliability and Maintainability Program Plan 3.2.11 A00B Test Procedure/First Article Test (FAT) 3.1.6.2 A00C Test/Inspection Report/First Article Test (FAT) 3.1.6.2 B001 Progress, Status and Management Report 3.2.2, 3.2.14.4 B002 Conference Minutes 3.2.3, 3.2.3.3,
3.2.8.8.1 B003 Operations Security (OPSEC) Plan 3.2.5
eCASS Contract Data Requirements List Page 2 of 16
CONTRACT DATA REQUIREMENTS LIST Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM:
Configuration Status Accounting Information
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-SESS-81253B (See 16)
5. CONTRACT REFERENCE
SOW para. 3.1.3
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
XTIMES
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 4: Contractor format: Any digital format (spreadsheet or comma/tab delimited dataset) is acceptable, MS Access Database Table is the preferred format.
Content: CSA Data submittals will contain, as a minimum, the following information for each eCASS Configuration Item (CI) (Hardware or Software)
1) The As-built configuration information (current up to the time of delivery) to include:
Part number and CAGE Code Serial Number and/or Lot Number (as applicable) Next Higher Assembly Part Number and CAGE Code Next Higher Assembly Serial Number and/or Lot Number (as applicable)
The required information will extend from the Top Assembly down to (and including) the components of the lowest maintenance-significant item. (components of COTS items excluded)
2) Identification of the applicable Functional, Allocated and Product Baseline Documentation for each System, End Item, or Critical Item)
3) Identification of the associated DD Form 250.
4) Identification of all deviations from the approved As-designed Product Baseline (including hardware shortages and approved Engineering Changes not incorporated, as well as Engineering Changes incorporated that are not yet approved).
5) The unique identification (title, version/release, date) of all software installed in or delivered with the eCASS End Item.
Block 8: Government has thirty (30) calendar days to provide comments or approval.
Contractor has fifteen (15) days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 and 13: The CSA Data Set described herein will be submitted NLT 30 days after delivery of each eCASS Station.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date
I. APPROVED BY
S. Demme (PMA260D3) J. Date
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 Pages eCASS Contract Data Requirements List Page 3 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM:
Manufacturing and Production Plan
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-MGMT-81889
5. CONTRACT REFERENCE
SOW para. 3.1.4, 3.1.4.6
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
N/A
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 8: Government has thirty (30) calendar days to review and provide comments or approval. Contractor has fifteen (15) days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit prior to Post Award Review (PAR) or no later than 45 days after contract award. Revisions as changes occur.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date I. APPROVED BY
S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 4 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP ____ TM _____ OTHER ______
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM:
Documentation of Commercially Available/Privately Developed Software
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
(See 16)
5. CONTRACT REFERENCE
SOW para. 3.1.5.2
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
D (See 16)
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
AS REQ
14. DISTRIBUTION
(See 16)
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
AS REQ
Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 4: Contractor format acceptable.
Block 8: Government has thirty (30) calendar days to review and provide comments or approval. Contractor has fifteen (15) days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Technical Document Distribution Statements, Attachment 1.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31)
H. Date I. APPROVED BY S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 5 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER ____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM:
Test Procedure
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-NDTI-80603A (See 16)
5. CONTRACT REFERENCE
SOW para. 3.1.6.3.1, 3.1.6.3.2
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 4: Test Procedures shall address component and subsystem testing and integrated system testing. At a minimum the test procedures shall include: test descriptions, test specification, test objectives, description of the test setup, test parameters, pass/fail criteria, test equipment, support equipment, instrumentation requirements, validation procedure, test location, test personnel/responsibilities. Test Procedures may reference other test plans and procedures (e.g. Reliability Testing, EMI Testing) as applicable.
Block 8: Government has fifteen (15) calendar days to review and provide comments or approval. Contractor has fifteen (15) calendar days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit a Plan 60 days prior to each of the following events: TRR* for TRR* for initial PAT and PRAT.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
*Non-SETR TRR event.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date I. APPROVED BY
S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 6 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM:
Test/Inspection Report (TIR)
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SOW para. 3.1.6.3.1, 3.1.6.3.2, 3.1.6.8
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
See 16
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
XTIMES
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 7: A DD250 is required for TIRs associated with CLINs 0001-0017, 0101-0117, 0201-0217, 0301-0317, 0401-0417 and 0501-0517. Additionally, for each TIR associated with the aforementioned CLINs, the contractor shall include a copy of the associated Assembly Build Book in Contractor format as an artifact and this artifact will not require Govt approval as part of this CDRL.
Block 8: Government has thirty (30) calendar days to provide comments or approval.
Contractor has fifteen (15) calendar days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit one (1) TIR for each FRP system upon completion of acceptance testing. Submit one (1) TIR upon completion of each Installation/OSV performed.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date I. APPROVED BY
S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 7 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM:
Data Accession List
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-MGMT-81453A
5. CONTRACT REFERENCE
SOW para. 3.2.4.1
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 8: Government has thirty (30) calendar days to review and provide comments or approval. Contractor has fifteen (15) days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Block 12 & 13: Submit 60 days prior to delivery of the last FRP system in the base year and each option year.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date I. APPROVED BY
S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 8 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. Title of Data Item:
Technical Report and Study/Services
3. SUBTITLE:
Problem Identification Report (PIR)
4. AUTHORITY (DATA IDENTIFICATION NO.)
See 16
5. CONTRACT REFERENCE
SOW para. 3.2.6, 3.2.8.1, 3.2.8.2, 3.2.12
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 4: Contractor format acceptable. Content shall include a description of the problem, a proposed solution, alternatives and hours/costs estimated to correct the problem. Standard format provided in PMA260 CM Plan. PIRs shall also be submitted as notification for Obsolescence issues.
Block 8: Government has thirty (30) calendar days to review and provide comments or approval. Contractor has fifteen (15) calendar days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this Contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit ten (10) calendar days after identification of problem.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date I. APPROVED BY
S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 9 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM:
Engineering Change Proposal (ECP)
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-SESS-80639D
5. CONTRACT REFERENCE
SOW para. 3.2.8.2, 3.2.8.4
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 8: Government has thirty (30) calendar days to review and provide comments or approval. Contractor has thirty (30) days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit 45 days after identification of required change.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date I. APPROVED BY
S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 10 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM:
Request for Variance (RFV)
3. SUBTITLE:
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-SESS-80640D
5. CONTRACT REFERENCE
SOW para. 3.2.8.5
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 8: Government has fifteen (15) calendar days to review and provide comments or approval. Contractor has fifteen (15) days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit 15 days after identification of proposed variance.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed addressees.
AIR 2 LT
AIR 3 LT
AIR 4 LT
AIR 5 LT
15. TOTAL 0 5 0
G. PREPARED BY
P. Hawkins (PMA260D31) H. Date I. APPROVED BY
S. Demme (PMA260D3) eCASS Contract Data Requirements List Page 11 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A00A
2. TITLE OF DATA ITEM:
Reliability and Maintainability Program Plan
DI-SESS-81613A
5. CONTRACT REFERENCE
SOW para. 3.2.11
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
AS REQ
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
AS REQ
Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 8: Government has thirty (30) calendar days to review and provide comments or approval. Contractor has fifteen (15) days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
eCASS Contract Data Requirements List Page 12 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0016
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER ____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A00B
2. TITLE OF DATA ITEM:
Test Procedure
3. SUBTITLE:
First Article Test (FAT)
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-NDTI-80603A (See 16)
5. CONTRACT REFERENCE
SOW para. 3.1.6.2
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 4: Test Procedures shall address component and subsystem testing and integrated system testing. At a minimum the test procedures shall include: test descriptions, test specification, test objectives, description of the test setup, test parameters, pass/fail criteria, test equipment, support equipment, instrumentation requirements, validation procedure, test location, test personnel/responsibilities. Test Procedures may reference other test plans and procedures (e.g. Reliability Testing, EMI Testing) as applicable.
Block 8: Government has fifteen (15) calendar days to review and provide comments or approval. Contractor has fifteen (15) calendar days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit a Plan 60 days prior to TRR* for FAT.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
*Non-SETR TRR event.
AIR 2 LT
AIR 3 LT
eCASS Contract Data Requirements List Page 13 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0016
B. EXHIBIT
A
C. CATEGORY
TDP _____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A00C
2. TITLE OF DATA ITEM:
Test/Inspection Report (TIR)
3. SUBTITLE:
First Article Test (FAT)
4. AUTHORITY (DATA IDENTIFICATION NO.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SOW para. 3.1.6.2
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
See 16
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
XTIMES
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 7: A DD250 is required for TIRs associated with CLINs 0001-0017, 0101-0117, 0201-0217, 0301-0317, 0401-0417 and 0501-0517. Additionally, for each TIR associated with the aforementioned CLINs, the contractor shall include a copy of the associated Assembly Build Book in Contractor format as an artifact and this artifact will not require Govt approval as part of this CDRL.
Block 8: Government has thirty (30) calendar days to provide comments or approval.
Contractor has fifteen (15) calendar days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit one (1) TIR for the first two (2) First Article Test (FAT) FRP eCASS stations and SMAT/CAL OTPSs upon completion of acceptance testing for both stations and both OTPSs.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
eCASS Contract Data Requirements List Page 14 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
B
C. CATEGORY
TDP ____ TM _____ OTHER _____
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM:
Progress, Status and Management Report
DI-MGMT-80227 (See 16)
5. CONTRACT REFERENCE
SOW para. 3.2.2, 3.2.14.4
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
MNTHLY
12. DATE OF FIRST
SUBMISSION
45 DAC
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 4: Contractor format acceptable. Content shall be in accordance with the specified Data Item and shall include the following:
(1) Separate report by program discipline, i.e., Management, Engineering, Logistics, etc.
Provide detailed events and status of each. Identify all issues/problems encountered during the reporting period that may affect program schedule.
(2) Provide a chart showing status of all milestones and events. Include schedule as established at contract award and proposed schedule at time of submittal.
(3) Provide a listing of all reviews and meeting completed from contract award thru current reporting period. Include dates meetings were conducted. Provide a listing of upcoming reviews and meetings scheduled within the next 3 months including dates and location.
(4) Provide a status of all data deliverables.
(5) Provide a complete listing of all GFE/GFP provided under the contract to include P/N, S/N, Nomenclature and all repair actions initiated under the contract to include type of repair, date of repair, status and cost.
(6) Provide a status of all production activities, to include quality metrics.
(7) Provide a status of Engineering Support activities to include: Task Description, Hours/Travel/Material authorized for each Task, Bid Code and/or Labor Rate charged to each Task, Hours/Travel/Material incurred for the Reporting period for each Task, Cumulative Hours/Travel/Material incurred for each Task, Status of each Task, Reporting Period and Cumulative totals.
Block 8: Government has fifteen (15) calendar days to review and provide comments or approval. Contractor has ten (10) calendar days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Block 13: Submit on the 15th calendar day of each month.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
eCASS Contract Data Requirements List Page 15 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
B
C. CATEGORY
TDP _____ TM _____ OTHER __X Am/Mgt Data
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM:
Conference Minutes
DI-ADMN-81250B (See 16)
5. CONTRACT REFERENCE
SOW para. 3.2.3, 3.2.3.3, 3.2.8.8.1
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
LT
9. DIST STATEMENT REQD.
See 16
10. FREQUENCY
XTIMES
12. DATE OF FIRST
SUBMISSION
See 16
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS See 16
Block 4: Minutes should be captured and documented by the Contractor during conference meetings and reviews. Submittals should include:
a) Narrative summary of meeting events, pertinent decisions and notification of follow-on meetings scheduled
b) Action Items (Date/Actionee/Action/Status/Due Date)
c) Attendee List
d) All presentation materials provided at the meeting
Block 8: Government has thirty (30) calendar days to review and provide comments or approval. Contractor has fifteen (15) calendar days after receipt of Government comments to resubmit.
Block 9: Apply and use distribution statements in accordance with the Distribution Statement Attachment to this contract. See SECNAVINST 5510.36 for guidance.
Blocks 12 & 13: Submit ten (10) calendar days after each conference/review.
Block 14: Electronic copies of all data submittals shall be provided to all meeting attendees and others listed in Block 14 of this CDRL accessible via secure on-line access. A Letter of Transmittal (LT) shall also be provided by email to all meeting attendees and others listed in Block 14 of this CDRL.
AIR 1 LT
AIR 2 LT
AIR 3 LT
eCASS Contract Data Requirements List Page 16 of 16
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these Addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN: 0018, 0118, 0218, 0318, 0418, 0518
B. EXHIBIT
B
C. CATEGORY
TDP _____ TM _____ OTHER ______
D. SYSTEM/ITEM
electronic Consolidated Automated Support System (eCASS)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM:
Operations Security (OPSEC) Plan
DI-MGMT-80934C (See 16)
5. CONTRACT REFERENCE
SOW para. 3.2.5
6. REQUIRING OFFICE
PMA260
7. DD 250 REQ
DD
9. DIST STATEMENT REQD.
FOUO (See 16)
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
90 DAC (See 16)
14. DISTRIBUTION
See 16
a. Addressee
b. Copies
8. APP CODE
A (See 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See 16 Draft
Final
Reg Repro
16. REMARKS AIR 1 LT
Block 4: Use the definition of sensitive information given in Title 15, US Code, Section 278g- 3(d)(4). Security policy, procedures and requirements for classified information (as defined in FAR 4-401), are provided in DOD Manual 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). Use OPNAVINST 3432.1 and National Security Decision Directive 298 of 22 January 1988 for the concept of Operations Security and apply the framework for telecommunications security in DFARS clause 252.239-7016, as appropriate. Delete the last two sentences of Paragraph 10.3.4, and add “TEMPEST requirements are not considered when pricing OPSEC requirements. TEMPEST requirements, if applicable, are addressed separately in the DD Form 254 incorporated into this contract”. “Information pertinent to Section 3.3 is To Be Determined (TBD) and shall be provided in a subsequent CDRL revision.”
Block 8: Government has thirty (30) calendar days to review and provide comments or approval.
Contractor has fifteen (15) days after receipt of Government comments to resubmit.
Block 9: The words "FOR OFFICIAL USE ONLY" shall be conspicuously marked at the bottom of the outside cover (if any), on the bottom of each page, and on the bottom of the outside back cover (if any). The front cover (if any) or the first page of the document shall also be conspicuously marked with the following statement: "This document contains information EXEMPT FROM MANDATORY PUBLIC DISCLOSURE under the Freedom of Information Act.
Exemption b(2) applies." These markings shall also be applied in an approprioate manner to any data provided in electronic media or transmission. Electronic transmission of such data must be via Federal Information Processing Standard (FIPS) I40-1 compliant means.
EXEMPTIONS: b(2) shall be used on documents which concern internal working processes or procedures (e.g., OPSEC Plans or Program Protection Implementation Plans).
Blocks 12 & 13: Submit in MS Word 6.0 (or later) format on compact disc and hard copy.
Revisions are required after approval of plan only to comply with Government Data Protection Policy document revisions.
Block 14: Electronic copies of all data submittals shall be provided and accessible via secure on-line access. A Letter of Transmittal (LT) shall be provided by email to the listed Addressees.
AIR 2 LT
AIR 3 LT
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A001 |
| Configuration Status Accounting Information |
| SOW para. 3.1.3 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A002 |
| Manufacturing and Production Plan |
| DI-MGMT-81889 |
| SOW para. 3.1.4, 3.1.4.6 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP ____ TM _____ OTHER ______ |
| electronic Consolidated Automated Support System (eCASS) |
| A003 |
| Documentation of Commercially Available/Privately Developed Software |
| SOW para. 3.1.5.2 |
| PMA260 |
| LT |
| D |
| (See 16) |
| AS REQ |
| (See 16) |
| A (See 16) |
| N/A |
| AS REQ |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER ____ |
| electronic Consolidated Automated Support System (eCASS) |
| A004 |
| Test Procedure |
| SOW para. 3.1.6.3.1, 3.1.6.3.2 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A005 |
| Test/Inspection Report (TIR) |
| SOW para. 3.1.6.3.1, 3.1.6.3.2, 3.1.6.8 |
| PMA260 |
| See 16 |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A006 |
| Data Accession List |
| SOW para. 3.2.4.1 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A007 |
| Problem Identification Report (PIR) |
| SOW para. 3.2.6, 3.2.8.1, 3.2.8.2, 3.2.12 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A008 |
| Engineering Change Proposal (ECP) |
| SOW para. 3.2.8.2, 3.2.8.4 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A009 |
| Request for Variance (RFV) |
| SOW para. 3.2.8.5 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A00A |
| Reliability and Maintainability Program Plan |
| SOW para. 3.2.11 |
| PMA260 |
| LT |
| See 16 |
| AS REQ |
| See 16 |
| A (See 16) |
| N/A |
| AS REQ |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER ____ |
| electronic Consolidated Automated Support System (eCASS) |
| A00B |
| Test Procedure |
| First Article Test (FAT) |
| SOW para. 3.1.6.2 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| A |
| TDP _____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| A00C |
| Test/Inspection Report (TIR) |
| First Article Test (FAT) |
| SOW para. 3.1.6.2 |
| PMA260 |
| See 16 |
| See 16 |
| See 16 |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| B |
| TDP ____ TM _____ OTHER _____ |
| electronic Consolidated Automated Support System (eCASS) |
| B001 |
| Progress, Status and Management Report |
| SOW para. 3.2.2, 3.2.14.4 |
| PMA260 |
| LT |
| See 16 |
| 45 DAC |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| B |
| TDP _____ TM _____ OTHER __X Am/Mgt Data |
| electronic Consolidated Automated Support System (eCASS) |
| B002 |
| Conference Minutes |
| SOW para. 3.2.3, 3.2.3.3, 3.2.8.8.1 |
| PMA260 |
| LT |
| See 16 |
| See 16 |
| See 16 |
| A |
| N/A |
| See 16 |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
| CONTRACT DATA REQUIREMENTS LIST |
| B |
| TDP _____ TM _____ OTHER ______ |
| electronic Consolidated Automated Support System (eCASS) |
| B003 |
| Operations Security (OPSEC) Plan |
| SOW para. 3.2.5 |
| PMA260 |
| DD |
| FOUO (See 16) |
| 90 DAC (See 16) |
| See 16 |
| A (See 16) |
| N/A |
| See 16 |
| AIR 1 |
| LT |
| AIR 2 |
| LT |
| AIR 3 |
| LT |
| AIR 4 |
| LT |
| AIR 5 |
| LT |
| 0 |
| 5 |
| 0 |
File details come from the government source that posted it. Updated .