eCASS_FRP_2_RFP_Attachment_8_-_eCASS_PHS&T_Plan_-_2008.11.17.pdf

PDF 139 KB Posted

Attached to
eCASS Production Full Rate Production 2
Solicitation number
N68335-17-R-0129
Issued by

About this file

Attachment 8 - PHS&T Plan

View the file

Other files

File Type Posted
Q&A_092817.docx DOCX document
Attachment_(2)_Government_Furnished_Equipment_(GFE)_Production_Support_Asset_List_RevA.pdf PDF
Att_2_L-2_Vol_2_T-1_Technical_CRM_09132017.xlsx XLSX spreadsheet
Amendment_0004.docx DOCX document
Questions_and_Answers.docx DOCX document
Amendment_0003.docx DOCX document
Questions_&_Answers_0003.docx DOCX document
N68335-17-R-0129-0003_Conformed_Copy.docx DOCX document
eCASS_RFP_Questions_&_Answers.docx DOCX document
N68335-17-R-0129-0002_Conformed_Copy.docx DOCX document
Q&A_for_0002.docx DOCX document
N68335-17-R-0129-0002_Amendment.docx DOCX document
N68335-17-R-0129_Amendment_0001.pdf PDF
N68335-17-R-0129_conform_copy.pdf PDF
QA_for_Amendment_0001.pdf PDF
N68335-17-R-0129_eCASS_final_RFP.docx DOCX document
eCASS_FRP_2_RFP_Attachment_1_-_Technical_Data_Distribution_Statements_-_2017.07.27.pdf PDF
Att_2_L-2_Vol_2_T-1_Technical_CRM_08142017.xlsx XLSX spreadsheet
eCASS_FRP_2_RFP_Attachment_6_-_CDRLs_-_2017.08.03.pdf PDF
Att_6_L-6_Vol_3__PP-1_PP_Cont_Data_08112017.xlsx XLSX spreadsheet
Att_7_L-7_Vol_4_Price_Tables_20170815_RevB.xlsx XLSX spreadsheet
Attachment_(3)_CASS_Reuse_Items_List_for_eCASS_Production.xlsx XLSX spreadsheet
Attachment_(2)_Government_Furnished_Equipment_(GFE)_Production_Support_Asset_List.xlsx XLSX spreadsheet
N68335-17-R-0129__eCASS_FRP2_FRFP.docx DOCX document
Industry_Day_Questions_LLB.pdf PDF
Industry_Day_Attendee_List.pdf PDF
eCASS_Pre-Sol_Conference_Brief_R4_final_after_legal_review_LLB.pdf PDF
Att_1_L-1_Vol_1_ES_Tables_03132017.xlsx XLSX spreadsheet
Att_2_L-2_Vol_2_T-1_Technical_CRM_050217.xlsx XLSX spreadsheet
eCASS_FRP_2_RFP_Attachment_6_-_CDRLs_-_2017.06.13.pdf PDF
Att_7_L-7_Vol_4_Price_Tables_20170605.xlsx XLSX spreadsheet
Att_6_L-6_Vol_3__PP-1_PP_Cont_Data_03132017.xlsx XLSX spreadsheet
Att_5_L-5_Vol_3_PPQ_050217.docx DOCX document
eCASS_FRP_2_RFP_Attachment_7_-_CDRL_Addressee_List_-_2017.05.17.pdf PDF
eCASS_FRP_2_RFP_Attachment_1_-_Technical_Document_Distribution_Statements_-_2017.05.17_legal.pdf PDF
DRFP_N68335-17-R-0129.docx DOCX document
eCASS_FRP_2_RFP_Attachment_9_-_Reliability_and_Maintainability_Program_Plan_-_2017.06.06.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17 November 2008

PACKAGING, HANDLING, STORAGE

AND TRANSPORTATION (PHS&T) PLAN

ELECTRONIC CONSOLIDATED AUTOMATED

SUPPORT SYSTEM (eCASS)

SOW Attachment 8

MASTER EFFECTIVITY PAGE

The date of this document is __November 17, 2008_____.

A zero in the revision column indicates an original page.

Page Rev

Title 0 ii through vi 0

1-1 through 1-9 0

Executive Summary

This Packaging, Handling, Storage and Transportation (PHS&T) Plan contains the requirements for PHS&T for eCASS, the SMAT OTPS, the CAL OTPS, ancillary equipment, spares, and repair parts. NAVICP 0771 is NAVAIR's agent for the development, review, and approval of packaging data requirements. Requirements determination and acquisition of reusable containers are the responsibility of NAVICP. During the pre-operational support period, contractors are responsible for determining the type and extent of packaging for consumable and repairable items, and for making recommendations to NAVICP. Up-to-date information is available in NAVSUP P700, which is available at https://www.icptarp.net/P700.nsf/.

The Navy is currently using CASS as its standardized ATE to provide automated diagnostic support to a multitude of Naval weapon systems. CASS was developed using 1980s technology and fielded in the early 1990s. The average life cycle for ATE is 15-20 years, primarily due to changes in technology, but also due to parts obsolescence. The first of the fielded CASS stations will reach the end of their planned life cycle in 2012. The Navy is actively pursuing alternatives to extend the CASS life cycle until eCASS can be fielded.

Faced with aging equipment and parts obsolescence, the Program Manager, NAVAIR PMA260, conducted an Analysis of Alternatives (AoA) and a Cost Benefits Analysis (CBA) to research and provide recommendations that would provide the best technical and most economical approach to either replace or upgrade CASS. The findings from the AoA and CBA recommend replacing the legacy CASS technology with a modernized and technologically-advanced program. The CASS Modernization Program, known as eCASS, will entail incorporating and integrating new test technologies under the DoD Automatic Test Systems (ATS) technical architecture framework to reduce the effects of future obsolescence as well as to support test requirements that have emerged since CASS was originally designed in the 1980s.

It is the Navy’s intent to replace CASS with eCASS, a technologically advanced test system that will commence production deliveries in 2015. eCASS will mitigate parts and future technology obsolescence to provide a fully integrated, expeditionary, adaptable support system that will significantly reduce the Navy’s ATE Total Ownership Cost (TOC) over the next 20 years.

eCASS will also improve CASS performance parameters such as reliability and maintainability.

eCASS stations will be designed with the software and hardware to provide Communication, Navigation and Identification (CNI), Electro-Optical (EO) and High Power (HP) capability required to replace all mainframe CASS configurations.

1.0 EQUIPMENT PACKAGING

All activities are to ensure that all assets are complete when returned for repair, all shipments are packed according to the below guidelines and the Maintenance Action Form (MAF) is attached to the asset prior to shipment.

1.1 SPECIAL CONTAINERS

The contractor will be required to supply, at a minimum, a detailed Level 2 drawing package(s) (contractor format is acceptable) of all depot-level repairable eCASS Weapons Replaceable Assemblies (WRA) and Shop Replaceable Assemblies (SRA) for NAVICP to determine if existing reusable containers are available or if new special containers must be developed to facilitate the shipping of eCASS equipment through the government supply system. At a minimum, the drawings must contain the equipments’ dimensions (length, height, and width), weight, overall cube dimensions, and any unique requirements (storage temperature, hazard/explosive issues, Electrostatic Discharge (ESD) protection, oversize, fragile, etc.).

1.2 MARKING

All items will be marked for shipment and stored in accordance with MIL-STD-129P, Marking For Shipment and Storage and MIL-STD-130M, Marking and Identification of US Military Property.

1.3 PACKING LIST

A packing list or other suitable shipping document shall accompany each shipment and shall show the (a) name and address of consignor; (b) the name and address of consignee; (c) Government contract (and delivery order, if used) number; (d) Government bill of lading number covering the shipment, if any; and (e) description of the material shipped, including item number, quantity, number of containers, and package number, if any.

1.4 PACKAGING

eCASS hardware, SMAT OTPS, CAL OTPS, ancillary equipment, spares, and repair parts will be packaged in accordance with DoD Standard Practice for Military Packaging, MIL-STD-2073-1D.

All items considered candidates for accommodation by specially designed reusable containers shall be identified and data in accordance with MIL-PRF-49506 shall be furnished. Data shall be in sufficient detail to allow the design of a specialized container and dummy load without having to obtain additional data. Items requiring special marking requirements for shelf life items, constant power source needs, special attitude, controlled storage, hazardous materials and classified items shall be identified. The contractor shall provide the following for all candidate items: unit dimensions, unit weight, special shipping requirements, drawings showing envelope dimensions, detailed drawings showing mounting points, item material and surface finishes, and item fragility.

For large items greater than sixty inches long or over 150 lbs the following additional information shall be provided: center of gravity, radii of gyration, and moment of inertia.

The contractor shall provide data tailored to Appendix B for all new peculiar procurable source coded items. Table 1 shall be completed to provide a list of all eCASS assets that have been assigned containers to be used for return of failed material.

All packing, marking and storage incidental to shipping of equipment to be acquired under this contract shall be made at the Contractor's expense except for government furnished reusable shipping containers.

1.4.1 REPAIRED EQUIPMENT TO BE PLACED INTO NAVICP WAREHOUSES’

FOR ISSUE:

Any item that is destined for long term storage or any equipment that has been returned to the Original Equipment Manufacture (OEM) for repair shall be packaged in accordance with MIL-

STD-2073-1D.

1.5 CLASSIFIED MATTER

Classified matter, if applicable, shall be packed and shipped in accordance with transmission instructions contained in the Industrial Security Manual for Safeguarding Classified Information (DOD 5220.22-M) and the DD Form 254 “Contract Security Classification Specification”.

Other DoD security documents, including but not limited to the following, may pertain to delivery or performance under this contract: DOD 5220.22-S-1 “COMSEC Supplement to Industrial Security Manual for Safeguarding Classified Information” and DOD 5220.22-R “Industrial Security Regulation.”

1.6 RECEIVED DAMAGED EQUIPMENT

Items that are damaged or defective, in the opinion of the Contracting Officer's Representative (COR) or designated Government representative shall be replaced with new items at no additional cost to the Government.

2.0 HANDLING

eCASS handling equipment will be designed in accordance with MIL-STD-1365B, General Design Criteria for Handling Equipment Associated with Weapons and Related Items. Handling Equipment/Common Tool Kits identified for use at the intermediate maintenance level in support of eCASS is included in Appendix C.

3.0 STORAGE

There are no special or unique storage requirements for eCASS known at this time. However, the Contractor will notify NAVICP if any special/unique requirements are identified during the life of the contract.

4.0 TRANSPORTATION

No special or unique transportation requirements have been identified for eCASS at this time.

Transportation of eCASS, SMAT OTPS, CAL OTPS, ancillary equipment, spares, and repair parts will be in accordance with DoD and Navy directives. Shipments to sites during the interim support period will be by commercial bill of lading via air-ride van. Any deviations required by the user site will be addressed on an individual basis. If deviations are required, NAVICP will be notified to ensure that the proper procedures are used.

TABLE 1a. Reusable Containers for eCASS Assets

(Items will be entered here when they are known)

Part Number NIIN Nomenclature Reusable Container

Alternate Container

TABLE 1b. Special Containers (If Required)

(Items will be entered here when they are known)

Part Number NIIN Nomenclature Reusable Container

Alternate Part Number

Appendix A: Glossary

CAL OTPS Calibration Operational Test Program Set

CCAs Circuit Card Assemblies

CLIN Contract Line Item Number

COMSEC Communications Security

CONUS Continental United States

COR Contracting Officer's Representative

DoD Department of Defense eCASS Electronic Consolidated Automated Support System

ESD Electrostatic Discharge

MAF Maintenance Action Form

NAVAIR Naval Air Systems Command

NAVICP Naval Inventory Control Point (Mechanicsburg or Philadelphia)

NAVSUP Naval Supply Systems Command

OCONUS Outside the Continental United States

OEM Original Equipment Manufacturer

OTPS Operational Test Program Set

PHS&T Packaging, Handling, Storage and Transportation

RTCASS Reconfigurable Transportable Consolidated Automated Support System

SMAT OTPS Self Maintenance And Test Operational Test Program Set

SRA Shop Replaceable Assembly

WRA Weapons Replaceable Assembly

Appendix B: Packaging Data Requirements

DATA PRODUCT TITLE SELECT

Reference Number N CAGE Code N Center of Gravity N, as applicable Cleaning and Drying Procedure N Cushioning and Dunnage Material Code N Cushioning Thickness N Detailed Drawings Showing Mounted Points N Drawing or Part Number - Container N Drawing or Part Number - Item to be Packed/Packaged N Drawing or Part Number - Preservation of Packing Material N Degree of Protection Code N Estimated Price N Intermediate Container Code N Intermediate Container Quality N Item Fragility N, as applicable < 50G's Item Material and Surface Finishes N, as applicable Hazardous Code N Method of Preservation N Moment of Inertia N, as applicable National Stock Number and Related Data - Container N National Stock Number and Related Data - Item to be Packed/Packaged N National Stock Number and Related Data - Preservation or Packing Material N Optional Procedure Indicator N Packaging Category Code N Packing Code N Preservation Material Code N Quantity Per Unit Pack N Radii of Gyration N, as applicable Shelf Life N Shelf Life Action Code N Source Maintenance Recovery Code N Special Marking Code N Special Material Content Code (SMCC) N Special Packaging Instruction Code N, as applicable Special Packaging Instruction Number Revision N, as applicable Special Shipping Instructions N, as applicable Supplemental Instructions N, as applicable Supplemental Packaging Data N, as applicable Type of Storage Code N Unit Container Code N Unit Container Level N Unit Pack Code N Unit Pack Cube N Item Length N Item Width N

Item Height N Item Weight N Packaged Length N Packaged Width N Packaged Height N Packaged Weight N Wrapping Material N

Appendix C: Handling Equipment/Common Tool Kits

* NOTE * Equipment will be listed here when identified by the prime contractor.

1.0 Equipment Packaging
2.0 HANDLING
Nomenclature
NIIN
Part Number