This notice provides answers to questions from offerors on solicitation number N62742-21-R-1303 issued by the Department of the Navy Naval Facilities Engineering Command for the construction of a consolidated headquarters facility at Naval Support Activity, Marine Corps Base Guam. The facility will consist of a reinforced concrete structure with exterior walls, flooring, foundation, windows, roofing and mechanical, electrical and information systems designed for Guam's earthquake and environmental conditions. Support facilities such as utilities, site improvements, an emergency generator, access roads, parking and incidental work are also included. The notice answers seventeen questions from offerors seeking clarification on aspects of the solicitation including room layouts, wall and floor finishes, and revisions that will be included in amendment number 0003 to address discrepancies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1303_Amd0021-Issued.zip | ZIP file | |
| 21R1303_Notice23-Issued.pdf | ||
| 21R1303_Notice22-Issued.pdf | ||
| 21R1303_Amd0020-Issued.pdf | ||
| 21R1303_Notice21-Issued.pdf | ||
| 21R1303_Amd0019-Issued.pdf | ||
| 21R1303_Notice20-Issued.pdf | ||
| 21R1303_Amd0018-Issued.zip | ZIP file | |
| 21R1303_Amd0017-Issued.zip | ZIP file | |
| 21R1303_Notice19-Issued.pdf | ||
| 21R1303_Amd0016-Issued.zip | ZIP file | |
| 21R1303_Notice18-Issued.pdf | ||
| 21R1303_Notice17-Issued.pdf | ||
| 21R1303_Notice16-Issued.pdf | ||
| 21R1303_Amd0015-Issued.pdf | ||
| 21R1303_Amd0013-Issued.pdf | ||
| 21R1303_Amd0012-Issued.pdf | ||
| 21R1303_Amd0011-Issued.pdf | ||
| 21R1303_Amd0010-Issued.pdf | ||
| 21R1303_Amd0006-Issued.pdf | ||
| 21R1303_Notice4-Issued.pdf | ||
| 21R1303_Amd0003-Issued.zip | ZIP file |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-21-R-1303
Notice No. 3
12 July 2021
PRE-PROPOSAL QUESTIONS & ANSWERS
WON 1639790, J-301 GOJ – CONSOLIDATED HEADQUARTERS,
U.S. NAVAL SUPPORT ACTIVITY (NAVSUPPACT),
MARINE CORPS BASE (MCB) GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
1. Drawing A-401 in detail A1 which is wall D1 just to the right side of the two “cg” notes is a rectangle drawn with a “fec” inside it. The rectangle does not have a designation for it.
Please confirm if this is a “AWP-1”.
ANSWER: That is AWP-1. Panel to be cut around the FEC. Will be revised in forthcoming
Amendment No. 0003.
2. Drawing A-612 room number 117 indicates “AWP-1” on all four walls. However there are no elevations for room 117. Please provide the elevations for this room so the number of “AWP-1” can be determined.
ANSWER: See A-406, elevation D3 and the note next to title.
3. Drawing A-612 room number 157 indicates “AWP-1” on all four walls. However there are no elevations for room 157. Please provide the elevations for this room so the number of “AWP-1” can be determined.
ANSWER: Provide two (2) 3’-6” wide each AWP-1 panels on walls A and D. Center panels on wall A between door and adjoining wall. Center panels on wall D between adjoining wall and door (in 90 degree open position). Elevation for Room 157 will be provided in forthcoming Amendment No. 0003.
4. Drawing C1/A-406 indicate that Room 1-212 is “opposite/similar” to this detail. However;
drawing C1/A-407 also provides information for room 1-212.
ANSWER: Disregard “(1-212 OPP SIM.)” note on C1/ A-406. Will be deleted in forthcoming
5. Drawing A-407 detail B1 Wall A does not indicate “AWP-2” which is noted in the room schedule on drawing A-613. Please clarify.
ANSWER: Provide two (2) 4’-0” wide AWP-2 on wall elevation A – center on wall. Will be revised in forthcoming Amendment No. 0003.
6. Drawing A-412 detail B1 for Room 2-155 indicates 5 each rectangles on the wall these are not identified. Furthermore, Drawing A-613 room 2-155 does not indicate other than paint on the walls. Please clarify what these objects are.
ANSWER: These are AWP-1 panels. Will be revised in forthcoming Amendment No. 0003.
7. Drawing A-612 the room schedule first line item is “Corr K”. Please provide a room number for this corridor as it cannot be identified on the floor plans.
ANSWER: Corridor K does not exist. Will remove in forthcoming Amendment No. 0003.
8. Drawing A-613 Room 1-223 indicates the floor is PT-3B with a PT-3 Bullnose base.
However; drawing AI-106 indicates this room to be CPT-2. Please clarify which is correct.
ANSWER: It should be CPT-2 with RB-2. Will revise in forthcoming Amendment No. 0003.
9. Drawing A-613 Room 1-234 indicates the floor is PT-3b/WM-1 with a Bullnose base.
However, drawing A-104 indicates this room to be completely WM-1. Please clarify which is correct.
ANSWER: Floor finish is entirely WM-1 as shown on AI104. Retain PT-3 bullnose base.
Will revise in forthcoming Amendment No. 0003.
10. Drawing AI-111 on the East side of column line 5 between column lines D and E there is no flooring indicated. To the north of column line D and to the south of column line E there is “PT” flooring. Please confirm if this section of the floor is not to receive tile.
ANSWER: This is part of CORR I with a PT-3C finish. Will revise drawing in forthcoming
11. Drawing A-414 Detail A1 Part A and Detail B1 Part A do not agree. Detail B1 is the PT-3 base and PT-3E from the wall with the door into the restroom. Please confirm this is the intent.
ANSWER: Detail B1, elevation A, PT-3E should be on all wall faces. Will revise drawing in forthcoming Amendment No. 0003.
12. Drawing A-414 Detail C4 Part A does not indicate the type of wall tile to be used. Please provide the specific wall type of tile
ANSWER: Elevation A should have a PT-3 base with P-1C wall finish. The vertical “hatch” on the right side is in error. Will revise drawing in forthcoming Amendment No. 0003.
13. Drawing A-414 Detail D3 Part C does not indicate the type of wall tile to be used. Please provide the specific wall type of tile.
ANSWER: Elevation C should follow detail C3. Will add Note on drawing in forthcoming
Amendment No. 0003.
14. Drawing A-115 Room 2-164 Column line 3 between the two W1 type windows running in the East to West direction is a wall. Please provide the wall designation.
ANSWER: This wall will be removed in a revised drawing in the forthcoming Amendment No.
0003.
15. Drawing A-502 wall type DX indicates a “5/8” impact resistant sound dampening gypsum board” on top of the 7/8” furring channels. However; drawing A-732 detail C2 indicates a “5/8” foil faced gypsum wall board”. Please clarify which is correct.
ANSWER: A revised Drawing A-732 will be revised in the forthcoming Amendment No. 0003 to indicate Detail C2 as 5/8” impact resistant sound dampening gypsum board.
16. Drawing A-613 Rooms 2-123 (RF RM) and 2-143 (ELEC G) have ACT-1 indicated for the ceilings however drawings A-126 and A-128 do not indicate ACT in these rooms. Please clarify.
ANSWER: No ACT-1 in either room. Will remove ACT-1 in forthcoming Amendment No.
0003.
17. Drawing A-613 Room 2-155 does not indicate Acoustic Wall Panels on Wall A as indicated in detail B1/A-412. Please confirm the AWP is required in Corr M per detail B1/A-412.
ANSWER: Yes, provide five (5) AWP-1 panels as shown on B1/A-412; elevation A. Will be revised in forthcoming Amendment No. 0003.