This document contains questions and answers related to solicitation N62742-21-R-1303 for the construction of a consolidated headquarters facility at Naval Support Activity, Marine Corps Base Guam. The project involves construction of a reinforced concrete building with all appropriate mechanical, electrical and informational systems designed for Guam's earthquake and environmental conditions. Support facilities include utilities, site improvements, an emergency generator, access roads, parking and incidental related work. The questions and answers provide clarification on specifications, drawings and finishes to resolve conflicts between documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1303_Amd0021-Issued.zip | ZIP file | |
| 21R1303_Notice22-Issued.pdf | ||
| 21R1303_Amd0020-Issued.pdf | ||
| 21R1303_Notice21-Issued.pdf | ||
| 21R1303_Amd0019-Issued.pdf | ||
| 21R1303_Notice20-Issued.pdf | ||
| 21R1303_Amd0018-Issued.zip | ZIP file | |
| 21R1303_Amd0017-Issued.zip | ZIP file | |
| 21R1303_Notice19-Issued.pdf | ||
| 21R1303_Amd0016-Issued.zip | ZIP file | |
| 21R1303_Notice18-Issued.pdf | ||
| 21R1303_Notice17-Issued.pdf | ||
| 21R1303_Notice16-Issued.pdf | ||
| 21R1303_Amd0015-Issued.pdf | ||
| 21R1303_Amd0013-Issued.pdf | ||
| 21R1303_Amd0012-Issued.pdf | ||
| 21R1303_Amd0011-Issued.pdf | ||
| 21R1303_Amd0010-Issued.pdf | ||
| 21R1303_Amd0006-Issued.pdf | ||
| 21R1303_Notice4-Issued.pdf | ||
| 21R1303_Amd0003-Issued.zip | ZIP file | |
| 21R1303_Notice3-Issued_NoExplicitAccess.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-21-R-1303
Notice No. 23
24 Aug 2022
PRE-PROPOSAL QUESTIONS & ANSWERS
WON 1639790, J-301 GOJ – CONSOLIDATED HEADQUARTERS,
U.S. NAVAL SUPPORT ACTIVITY (NAVSUPPACT),
MARINE CORPS BASE (MCB) GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
261. 06 41 16.00 10
Specification section 06 41 16.00 10 calls for face frame construction. Can 32 mm frameless casework construction be used as an acceptable alternative?
ANSWER: Provide face frame per specifications.
262. A1/AS108
Please confirm the schedule of post and the number of 3/8" anchor bolts to be used in fuel tank fence. Also indicate the reference you use for concrete footing.
ANSWER: Provide minimum of four (4) 3/8” anchor bolts for each post base plate. Reference details B1 & B2/ S-301 (middle detail) for similar slab edge and concrete curb reinforcement requirements. Sheet AS108 will be revised in a future Amendment.
263. CS103, CG401
Please provide the schedule use for flagpole concrete pad.
ANSWER: Reference detail B4/CP502 for concrete pad (walkway). Sheet AS101 will be revised in a future Amendment.
264. A-108, A-503
The column at grids 2 & H on A-108 references detail B1/A-503. Detail B1/A-503 does not appear to be correct. Please advise.
ANSWER: The detail reference should be C1/ A-503. Sheet A-108 will be revised in a future Amendment.
265. A-613
Please provide specification/ type of PT-3 Bullnose for Room 1-234 Vest A.
ANSWER: Provide RB-2 in lieu of PT-3 Bullnose. Sheet A-613 will be revised in a future
266. A-120
Please provide ceiling height for Room 1-234 Vest A.
ANSWER: 9’- 0” AFF. Sheet A-120 will be revised in a future Amendment.
267. A-404, A-612
There is a conflict in wall finish between Room Finish Schedule and Internal Elevation Drawing for Room 1-142 Office. On Room Finish Schedule Drawing wall Finish for Elevation C is Paint P-1B while at Internal Elevation Drawing wall finish is Paint P-6B.
ANSWER: Wall elevation “C” to have P-1B finish. Sheet A-404 will be revised in a future
268. A-404, A-612
There is a conflict in wall finish between Room Finish Schedule and Internal Elevation Drawing for Room 1-147 Lactation. On Room Finish Schedule Drawing wall Finish for Elevation D is Paint P-1B while at Internal Elevation Drawing wall finish is Paint P-1C.
Please confirm which drawing were going to follow.
ANSWER: Wall elevation “D” to have P-1B finish. Sheet A-404 will be revised in a future
269. A-405, A-612
There is a conflict in wall paint and skirting between Room Finish Schedule and Internal Elevation Drawing for Room 1-177 Secure B & Room 1-222 Secure C. On Room Finish Schedule Drawing wall paint and skirting (Elevation C&D) are Paint P-1B and PT-3 while at Internal Elevation Drawing wall paint and Skirting were both P-1C. Please confirm which drawing were going to follow.
ANSWER: Skirts (wall bases) on elevations “C & D” should be PT-3. Sheet A-405 will be revised in a future Amendment.
270. A-406, A-612
There is a conflict in wall paint between Room Finish Schedule and Internal Elevation Drawing for Room 1-185 & 1-208 Open Office. On Room Finish Schedule Drawing wall paint (Elevation A&D) is Paint P-1B while at Internal Elevation Drawing wall paint both P-1C. Please confirm which drawing were going to follow.
ANSWER: Wall elevations “A & D” to have P-1B finish. Sheet A-406 will be revised in a future Amendment.
271. A-612
There are 2 types of wall finish (P-1B & AWP-1) for Room 1-202 Office, please provide wall demarcation for each wall finish type.
ANSWER: New interior elevation detail “C3” for room 1-202 will be added to Sheet A-411 in a future Amendment.
272. A-407, A-613
There is a conflict in wall paint between Room Finish Schedule and Internal Elevation Drawing for Room 1-219 Conf G . On Room Finish Schedule Drawing wall paint for Elevation D is Paint P-1C while at Internal Elevation Drawing wall paint is Paint P-1C.
Please advise.
ANSWER: Wall elevation “D” to have P-6B finish. Sheet A-407 will be revised in a future
273. A-408, A-613
Drawing for Room 2-115 Corr G. On Room Finish Schedule Drawing wall paint (Elevation B) is Paint P-1B while at Internal Elevation Drawing wall paint both P-1C. Please confirm
ANSWER: Wall elevation “B” to have P-1B finish. Sheet A-408 will be revised in a future
274. A-408, A-613
Drawing for Room 2-120 Comm Inter. On Room Finish Schedule Drawing wall paint (Elevation A) is Paint P-1B while at Internal Elevation Drawing wall paint both P-6B.
ANSWER: All walls to have P-1B finish. Sheet A-408 will be revised in a future Amendment.
275. A-408, A-613
Drawing for Room 2-121 Open Office. On Room Finish Schedule Drawing wall paint (Elevation A) is Paint P-1B while at Internal Elevation Drawing wall paint both P-6B.
ANSWER: Wall elevation “A” indicates a P-1B wall finish. However, wall elevation “D” will be revised from the P-6B finish to a P-1B finish. Sheet A-408 will be revised in a
276. A-408, A-613
Please verify skirting to be used at Room 2-126 COC B. At Room Schedule Drawing skirting is RB-2 while at Internal Elevation Drawing, skirting is P-1C.
ANSWER: Wall elevation “A” skirting (wall base) is RB-2. Sheet A-409 will be revised in a
277. A-411, A-613
Drawing for Room 2-134 Conf I. On Room Finish Schedule Drawing wall paint (Elevation D) is Paint P-6B while at Internal Elevation Drawing wall paint both P-1C. Please confirm
ANSWER: All walls to have P-6B finish. Sheet A-411 will be revised in a future Amendment.
278. A-411, A-613
Drawing for Room 2-140 OPS Cell. On Room Finish Schedule Drawing wall paint (Elevation C) is Paint P-1B while at Internal Elevation Drawing wall paint both P-1C.
ANSWER: Wall elevation “C” to have P-1B finish. Sheet A-411 will be revised in a future
279. A-413, A-613
Drawing for Room 2-164 CO Office. On Room Finish Schedule Drawing wall paint (Elevation A) is Paint P-6B while at Internal Elevation Drawing wall paint both P-1B.
ANSWER: Finish schedule and interior wall elevations are correct. Only wall elevation “A” has a P-6B finish, but with P-1B finish at the soffit portion. All other walls and the soffit will have a P-1B finish.
280. A-104
Please provide room finish for corridor at grid 4 and between grids B and C.
ANSWER: Floor will be CPT-3 with RB-2 skirting. Walls will have P-1B finish and ACT-1 ceiling. This space will be designated as 1-116A - CORR K. This will be noted on sheets A-104 and A-612 and provided in a future Amendment.
281. A-106
Please confirm if the box in entry of Room 1-111 at grids E and 3.5 is a FEC.
ANSWER: Confirmed. See A-401, elevation D2.