21R1303_Notice19-Issued.pdf
PDF 518 KB Posted
- Solicitation number
- N62742-21-R-1303
About this file
This document contains pre-proposal questions and answers regarding solicitation number N62742-21-R-1303 from the Department of the Navy Naval Facilities Engineering Command Pacific for the construction of a consolidated headquarters facility at Naval Support Activity, Marine Corps Base Guam. The project involves construction of a reinforced concrete building with exterior walls, flooring, foundation, windows, roofing, mechanical, electrical, and information systems designed to meet Guam earthquake and environmental standards. Support facilities include utilities, site improvements, emergency generator, access roads, parking, and incidental related work. Questions were asked regarding specifications for raised access flooring tile sizes and transitions between flooring types, and answers indicated flooring details would be provided in a future amendment along with depressed slab and raised flooring extent.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R1303_Amd0021-Issued.zip | ZIP file | |
| 21R1303_Notice23-Issued.pdf | ||
| 21R1303_Notice22-Issued.pdf | ||
| 21R1303_Amd0020-Issued.pdf | ||
| 21R1303_Notice21-Issued.pdf | ||
| 21R1303_Amd0019-Issued.pdf | ||
| 21R1303_Notice20-Issued.pdf | ||
| 21R1303_Amd0018-Issued.zip | ZIP file | |
| 21R1303_Amd0017-Issued.zip | ZIP file | |
| 21R1303_Amd0016-Issued.zip | ZIP file | |
| 21R1303_Notice18-Issued.pdf | ||
| 21R1303_Notice17-Issued.pdf | ||
| 21R1303_Notice16-Issued.pdf | ||
| 21R1303_Amd0015-Issued.pdf | ||
| 21R1303_Amd0013-Issued.pdf | ||
| 21R1303_Amd0012-Issued.pdf | ||
| 21R1303_Amd0011-Issued.pdf | ||
| 21R1303_Amd0010-Issued.pdf | ||
| 21R1303_Amd0006-Issued.pdf | ||
| 21R1303_Notice4-Issued.pdf | ||
| 21R1303_Amd0003-Issued.zip | ZIP file | |
| 21R1303_Notice3-Issued_NoExplicitAccess.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-21-R-1303
Notice No. 19
27 June 2022
PRE-PROPOSAL QUESTIONS & ANSWERS
WON 1639790, J-301 GOJ – CONSOLIDATED HEADQUARTERS,
U.S. NAVAL SUPPORT ACTIVITY (NAVSUPPACT),
MARINE CORPS BASE (MCB) GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
251. 09 69 13, A-611
09 69 13, A-611 The specifications state the base access floor module is 24 by 24 inches.
Drawing A-611 states the finish for RAF-2 is to be Tarket/Centiva “Event-Classic Stone” ECL #7107. The website for Tarkett stone only lists sizes 12 x 18 inches & 18 x 18 inches.
Please advise.
ANSWER: See response to Question 215.
252. 09 69 13, A-611
09 69 13, A-611 The specifications state the base access floor module is 24 by 24 inches.
Drawing A-611 states the finish for RAF-3 is to be Forbo “Colorex SD” Static Dissipative Tile, Color: Moonstone #SD150206. The website for Forbo only lists sizes 24.4x24.4 inches. Please advise.
ANSWER: See response to Question 215.
253. 09 69 13
Please confirm locations of raised access flooring (corridors, storage, open offices, breakout room). How will the raised flooring transition to all other flooring in surrounding rooms with different finishes?
ANSWER: The raised access floor system occurs only on the second level and its extent is shown on the next page (yellow shaded area). The structural floor is depressed 2’- 0” throughout (red & yellow shaded areas) to accommodate the access floor system
– see building section C1/ A-301, wall section A1/A-304 and C4/ A-732. The top of the raised access flooring system (minus finish) to align with the concrete floor level. The depressed slab and raised flooring extent along with additional details for flooring transitions will be shown in a future Amendment.