This is a Condition Report Form (SRF-JRMC 4730-141, REV 00) used for documenting work findings and recommendations during naval ship repair and maintenance operations at U.S. Naval Ship Repair Facility-JRMC in Yokosuka, Japan. The form template is submitted from contractors (such as Sumitomo Heavy Industries, Ltd.) to the U.S. Fleet Logistics Center, Yokosuka, documenting condition findings for specific vessels undergoing repair work. The form captures essential project information including the ship name, TGI (Technical Guidance Information) number, contract reference number, and fiscal order number, along with contractor condition descriptions and recommendations for work authorization.

The form allows contractors to report on various work categories including work scope or schedule changes, new work items not originally part of the contract scope, clarifications needed on current specifications, requests for deviation from specifications, quality assurance issues, safety concerns, and routine administrative matters. Contractors must indicate whether work should be accomplished, should not be accomplished, or if ship checks have been performed to verify work alignment with basic specifications. The report categories include options for no-cost performance time adjustments, cost increases, and prioritization levels (normal or urgent). The form requires sign-off from both the contractor's representative and the U.S. Naval Ship Repair Facility Work Integration Manager (WIM), ensuring proper authorization and documentation of any changes to the original repair and maintenance scope before proceeding with work completion.

View the file

Other files

File Type Posted
HIG_7C1_Bundle3_CDRL.pdf PDF
Attachment (II) Price Proposal Form N6264926RA044_REV2.xlsx XLSX spreadsheet
4200.9J, CONTRACTING OFFICER'S CRANE OVERSIGHT PLAN, dtd 8 Feb 2023.pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings)_REV1.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440009 SF 30.pdf PDF
Att IX HIG_6C1_B3_POP_List.xlsx XLSX spreadsheet
Solicitation Amendment - N6264926RA0440009_Conformed.pdf PDF
Solicitation Amendment N6264926RA0440008 SF 30.pdf PDF
Solicitation Amendment - N6264926RA0440008 Conformed.pdf PDF
Solicitation Amendment N6264926RA0440006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440005 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440007 SF 30.pdf PDF
Att IX HIG_6C1_B3_POP_List_R4.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440003 SF 30.pdf PDF
SOW_TGI_38KB312389A03_c1v1.pdf PDF
SOW_TGI_38KB312389A02_c0v0.pdf PDF
Attachment II Price Proposal Form N6264926RA044 (rev1).xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440001 SF 30.pdf PDF
Exhibits - Contract Data Requirements List (CDRL).pdf PDF
Attachment (II) Price Proposal Form N6264926RA044.xlsx XLSX spreadsheet
SOW_TGI_38KB312387A01_c0v0.pdf PDF
Attachment (III) Request for Information Sheet.docx DOCX document
Attachment (V) Warranty Tracking Information.pdf PDF
Attachment (VIII) Contracts Data Sheet.pdf PDF
SOW_TGI_38KB325102A01_c0v0.pdf PDF
SOW_TGI_38KB312389A01_c1v0.pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
SOW_TGI_38KB313103A01_c1v0.pdf PDF
Attachment (VI) Source of Repair Instruction.pdf PDF
SOW_TGI_38KB386501A01_c0v0.pdf PDF
SOW_TGI_38KB312388A01_c0v0.pdf PDF
SOW_TGI_38KB312386A01_c0v0.pdf PDF
Solicitation - N6264926RA044.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Pre-Solicitation Notice N6264926RA044.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CFR FORM

ID0CHECKIDBODYID2YRID3MNID4D
22CONDITION REPORTCR DATE:2YEAR2MONTH2DAY
33SRF-JRMC 4730-141 (REV 00)3202633
4444REPORT NO:4
55URGENCY:5NORMAL55
6FROM:6SUMITOMO HEAVY INDUSTRIES, Ltd666
7TO:7U.S. FLEET LOGISTICS CENTER, YOKOSUKA, JAPAN777
8VIA:8U.S. NAVAL SHIP REPAIR FACILITY-JRMC, YOKOSUKA, JAPAN888
99999
10SUBJ: (SHIP NAME)10USS BLUE RIDGE (LCC-19)10The project ID consists of '38' followed by a 3-digit characters of TGI No. i.e., 19P1010
11TGI TITLE:11Project ID:1119P1111
12REF CONTRACT NO.:12TGI NO:1212FISC J/O NO:12
1313131313
14ENCL:14(1) CONTRACTOR CONDITION DESCRIPTION & RECOMMENDATION.141414
1515151515
161. ▢16WORK LISTED ON ENCLOSURE (1) MUST BE AUTHORIZED BYDATE:16YEAR16MONTH16DAY
1717171717
1818TO ENSURE COMPLETION WITHIN WORK SCHEDULE.181818
1919191919
202. ▢20THIS REPORT IS ISSUED FOR ADJUSTMENT OF PERFORMANCE TIME202020
2121FROMDATE:21YEAR21MONTH21DAY
2222222222
2323TODATE:23YEAR23MONTH23DAY
2424242424
2525WITH NO COST INCREASE.25
262626
273. ☑27REPORT IS CATEGORIZED AS:27
2828ODB - OTHER, AS DESCRIBED BELOWIf ODB is selected, describe in CONTRACTOR COMMENTS28
292929
304. ▢30CONTRACTOR COMMENTS30
313131
NAME OF CONTRACTOR'S REP32

ORIG

CONDITION REPORTDATE:YEARMONTHDAY
NAVSHIPREPFAC 4730-14l(REV.12-09)
REPORT NO:
FROM:
TO:U.S. FLEET AND INDUSTRIAL SUPPLY CENTER, YOKOSUKA, JAPAN
VIA:U.S. NAVAL SHIP REPAIR FACILITY-JRMC, YOKOSUKA, JAPAN
SUBJ: (SHIP NAME)TGI NO:JCN:
TGI TITLE:
REF CONTRACT NO.:FISC JO NO.:

ENCL: (1) CONTRACTOR CONDITION DESCRIPTION & RECOMMENDATION.

1WORK LISTED ON ENCLOSURE (1) MUST BE AUTHORIZED BY
YEARMONTHDAY

TO INSURE COMPLETION WITHIN WORK SCHEDULE.

2THIS REPORT IS ISSUED FOR ADJUSTMENT OF PERFORMANCE TIME FROM
YEARMONTHDAY
TO
YEARMONTHDAY

WITH NO COST INCREASE.

3REPORT IS CATEGORIZED AS:
If "OTHER" is selected, describe details →

4 COMMENTS

NAME OF CONTRACTOR'S REP
VIA:SRF-JRMC WORK INTEGRATION MANAGER (WIM) (C333)
1. SHIP CHECK OF ENCL HAS/HAS NOT BEEN PERFORMED.
THE WORK LISTED IS NOT IN THE BASIC SPECIFICATION
2. THIS WORK SHOULD BE ACCOMPLISHED
3. THIS WORK SHOULD NOT BE ACCOMPLISHED
4. COMMENTS
NAME OF CONTRACTOR'S REP
(DATE)
VIA:SRF-JRMC WORK INTEGRATION MANAGER (WIM) (C333)

ORIG (2)

ID1YR1YR2
CONDITION REPORTDATE:YEARMONTHDAY
NAVSHIPREPFAC 4730-14l(REV.12-09)
REPORT NO:
FROM:
TO:U.S. FLEET AND INDUSTRIAL SUPPLY CENTER, YOKOSUKA, JAPAN
VIA:U.S. NAVAL SHIP REPAIR FACILITY-JRMC, YOKOSUKA, JAPAN
SUBJ: (SHIP NAME)TGI NO:JCN:
TGI TITLE:
REF CONTRACT NO.:FISC JO NO.:

ENCL: (1) CONTRACTOR CONDITION DESCRIPTION & RECOMMENDATION.

1WORK LISTED ON ENCLOSURE (1) MUST BE AUTHORIZED BY
YEARMONTHDAY

TO INSURE COMPLETION WITHIN WORK SCHEDULE.

2THIS REPORT IS ISSUED FOR ADJUSTMENT OF PERFORMANCE TIME FROM
YEARMONTHDAY
TO
YEARMONTHDAY

WITH NO COST INCREASE.

3REPORT IS CATEGORIZED AS:
If "OTHER" is selected, describe details →

4 COMMENTS

NAME OF CONTRACTOR'S REP
VIA:SRF-JRMC WORK INTEGRATION MANAGER (WIM) (C333)
1. SHIP CHECK OF ENCL HAS/HAS NOT BEEN PERFORMED.
THE WORK LISTED IS NOT IN THE BASIC SPECIFICATION
2. THIS WORK SHOULD BE ACCOMPLISHED
3. THIS WORK SHOULD NOT BE ACCOMPLISHED
4. COMMENTS
NAME OF CONTRACTOR'S REP
(DATE)
VIA:SRF-JRMC WORK INTEGRATION MANAGER (WIM) (C333)

DropDownList

USS BLUE RIDGE (LCC-19)INFO ONLY - REPORTS/DATA NOT REQUIRED PER DIRECTION OF AN TGI.202211PLANNINGCFR - CONDITION FOUND REPORTNORMALWITH NO COST INCREASE.1. ☑2. ☑3. ☑4. ☑
USS ROBERT SMALLS (CG-62)MANDATORY REPORT - REPORTS/DATA THAT IS REQUIRED PER DIRECTION OF AN TGI.202322EXECUTIONODB - OTHER, AS DESCRIBED BELOWURGENTWITH COST INCREASE.1. ▢2. ▢3. ▢4. ▢
USS BENFOLD (DDG-65)DELAY AND DISRUPTION - EXAMPLE: OUTSIDE INTERFERENCE, LACK OF GFM, WAF NOT OPEN PER SCHEDULE, DELAY OF DECISION.202433
USS MILIUS (DDG-69)WORK SCOPE OR SCHEDULE CHANGE - GROWTH, DE-SCOPE, MATERIAL, OR PERFORMANCE PERIOD CHANGES RELATED TO ORIGINAL WORK SCOPE.202544CD - CONFIGURATION DATA
USS HIGGINS (DDG-76)NEW WORK - WORK RECOMMENDED WHICH IS NOT ORIGINALLY PART OF WORK SCOPE.202655DOL - DAMAGED OR LOST
USS HOWARD (DDG-83)TGI CLARIFICATION - CURRENT SPECIFICATION DOESN'T INCLUDE SUFFICIENT INFORMATION TO CONTINUE/COMPLETE WORK.202766ENV - ENVIRONMENTAL REPORTS
USS MCCAMPBELL (DDG-85)DFS REQUEST - CAN'T COMPLETE PRODUCTION AS PER SPECIFICATION DUE TO MATERIAL,INSUFFICIENT ON-SITE CONDITIONS, OR OTHER. ALSO REPORTS ON ITEMS WHICH WERE COMPLETED, BUT NOT TO SPEC.202877FIO - FOR INFORMATION ONLY
USS SHOUP (DDG-86)OTHER202988PCP - PROCESS CONTROL PROCEDURE
USS PREBLE (DDG-88)203099QA - QA REPORTS
USS MUSTIN (DDG-89)20311010RFI - REQUEST FOR INFORMATION
USS DEWEY (DDG-105)20321111RQ - REQUIRED REPORT SUBMITTAL
USS JOHN FINN (DDG-113)20331212RU - ROUTINE
USS RALPH JOHNSON (DDG-114)203413SAF - SAFETY REPORTS
USS RAFAEL PERALTA (DDG-115)203514SDD - SUBMITTAL OF DELAY AND DISRUPTION
USS GEORGE WASHINGTON (CVN-73)203615
APL 67 (APL-67)203716
YR 85 (YR-85)203817
YR 95 (YR-95)203918
YR 96 (YR-96)204019
YRB-30 BERTHING AND MESSING BG (YRB-30)204120
YRBM 57 (YRBM-57)204221
MERCER (APL-39)204322
NUECES (APL-40)204423
ASSAULT CRAFT UNIT 5 DET (LCAC-70)204524
ASSAULT CRAFT UNIT 1 DET (LCU-1627)204625
USS AMERICA (LHA-6)204726
USS NEW ORLEANS (LPD-18)204827
USS GREEN BAY (LPD-20)204928
USS SAN DIEGO (LPD-22)205029
USS RUSHMORE (LSD-47)205130
USS WARRIOR (MCM-10)205231
USS CHIEF (MCM-14)
USS PATRIOT (MCM-7)
USS PIONEER (MCM-9)
NAVAL BEACHMASTER UNIT (NBU-7)

File details come from the government source that posted it. Updated .