This is a Price Proposal Form template for a naval ship repair and maintenance contract. The form is designated for solicitation N6264926RA044 covering repair and maintenance work on the USS HIGGINS (DDG 76) during FY27 7C1 Bundle 3. The proposal template requires offerors to submit pricing in Japanese Yen (JPY) across two Contract Line Items (CLINs): CLIN 0001 for base work and CLIN 0002 for growth work at 8.70 percent. The form requests detailed labor cost breakdowns distinguishing between in-house labor (measured in man-hours) and sub-contractor labor, along with material costs and Other Direct Costs (ODCs), with all costs totaling to a proposed price per line item.

The template includes seven specific work items related to gas turbine maintenance (GTM) and associated equipment inspection, repair, and preservation tasks on the USS HIGGINS, with individual growth percentages ranging from 4 percent to 13 percent. Offerors are instructed to populate only orange-highlighted cells and provide labor hour breakdowns by skill categories including structures (SFTR), installation (INSL), welding (WELD), small metals (SMTL), repairs (RGRS), painting (PNTR), electrical (ELEC), pipe fitter (PFTR), quality assurance (QA), and others. The form is linked to detailed work specifications accessible through DoD SAFE and applies only to sources authorized to operate and conduct business in Japan per DFARS 252.225-7042, with performance to occur at Yokosuka Naval Base from June 29, 2026 through December 8, 2026.

View the file

Other files

File Type Posted
SRF-JRMC_4730-141_(REV 00).xlsx XLSX spreadsheet
HIG_7C1_Bundle3_CDRL.pdf PDF
4200.9J, CONTRACTING OFFICER'S CRANE OVERSIGHT PLAN, dtd 8 Feb 2023.pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings)_REV1.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440009 SF 30.pdf PDF
Att IX HIG_6C1_B3_POP_List.xlsx XLSX spreadsheet
Solicitation Amendment - N6264926RA0440009_Conformed.pdf PDF
Solicitation Amendment N6264926RA0440008 SF 30.pdf PDF
Solicitation Amendment - N6264926RA0440008 Conformed.pdf PDF
Solicitation Amendment N6264926RA0440006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440005 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440007 SF 30.pdf PDF
Att IX HIG_6C1_B3_POP_List_R4.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440003 SF 30.pdf PDF
SOW_TGI_38KB312389A03_c1v1.pdf PDF
SOW_TGI_38KB312389A02_c0v0.pdf PDF
Attachment II Price Proposal Form N6264926RA044 (rev1).xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440001 SF 30.pdf PDF
Exhibits - Contract Data Requirements List (CDRL).pdf PDF
Attachment (II) Price Proposal Form N6264926RA044.xlsx XLSX spreadsheet
SOW_TGI_38KB312387A01_c0v0.pdf PDF
Attachment (III) Request for Information Sheet.docx DOCX document
Attachment (V) Warranty Tracking Information.pdf PDF
Attachment (VIII) Contracts Data Sheet.pdf PDF
SOW_TGI_38KB325102A01_c0v0.pdf PDF
SOW_TGI_38KB312389A01_c1v0.pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
SOW_TGI_38KB313103A01_c1v0.pdf PDF
Attachment (VI) Source of Repair Instruction.pdf PDF
SOW_TGI_38KB386501A01_c0v0.pdf PDF
SOW_TGI_38KB312388A01_c0v0.pdf PDF
SOW_TGI_38KB312386A01_c0v0.pdf PDF
Solicitation - N6264926RA044.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Pre-Solicitation Notice N6264926RA044.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA044CLIN 00010¥0¥0¥0¥0
SHIP/VESSEL NAME:USS HIGGINS (DDG 76)CLIN 0002 (Growth)0.00¥0¥0¥0¥0
DESCRIPTION:FY27 7C1 BUNDLE3Total for All CLIN0.00¥0¥0¥0¥0
Total WI/TGI (Specify)7Total Evaluated Price¥0
Growth CLIN %8.70%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.Work Item/TGI No.DESCRIPTIONProposed LaborMaterial/ODCsCLIN 0001 Proposed Price (JPY)Growth CLIN PercentageCLIN 0002 GROWTH RESERVATION
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)Labor (MH)Labor Cost (JPY)Material Cost (JPY)ODC (JPY)CLIN 0002 TOTAL (JPY)
138KB312386-A01F/O - INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE000¥0¥0¥0¥09%0.00¥0¥0¥0¥0
238KB312387-A01F/O - INSPECT, REPAIR, AND PRESERVE AFT UPTAKE SPACE000¥0¥0¥0¥09%0.00¥0¥0¥0¥0
338KB312388-A01F/O – INSPECT, REPAIR, AND PRESERVE IN NO. ONE GTM AND SSGTG NO. ONE INTAKE000¥0¥0¥0¥09%0.00¥0¥0¥0¥0
438KB325102-A01F/O - REPAIR INTAKE AND UPTAKE LOUVERS000¥0¥0¥0¥013%0.00¥0¥0¥0¥0
538KB386501-A01F/O - INST AND RMV SCAFFOLDING TO/FROM VARIOUS LOCATIONS FOR SHIP’S FORCE WORK000¥0¥0¥0¥04%0.00¥0¥0¥0¥0
638KB312389-A02F/O – INSPECT, REPAIR, AND PRESERVE IN NO. 2 GTM AND SSGTG NO. 2 INTAKE000¥0¥0¥0¥09%0.00¥0¥0¥0¥0
738KB312389-A03F/O – INSPECT, REPAIR, AND PRESERVE IN SSGTG NO. 3 INTAKE000¥0¥0¥0¥09%0.00¥0¥0¥0¥0
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_38KB312386-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - FY27 7C1 BUNDLE31_38KB312386-A01 SUMMARY
SOLICITATION #:N6264926RA044
Work Item/TGI #:1_38KB312386-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.

Offerors opting not to propose on this specific work item/TGI shall leave the fields blank.

IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
MATERIAL TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
ODC TOTAL (¥)¥0

2_38KB312387-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - FY27 7C1 BUNDLE32_38KB312387-A01 SUMMARY
SOLICITATION #:N6264926RA044
Work Item/TGI #:2_38KB312387-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - INSPECT, REPAIR, AND PRESERVE AFT UPTAKE SPACE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.

Offerors opting not to propose on this specific work item/TGI shall leave the fields blank.

IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
MATERIAL TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
ODC TOTAL (¥)¥0

3_38KB312388-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - FY27 7C1 BUNDLE33_38KB312388-A01 SUMMARY
SOLICITATION #:N6264926RA044
Work Item/TGI #:3_38KB312388-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – INSPECT, REPAIR, AND PRESERVE IN NO. ONE GTM AND SSGTG NO. ONE INTAKE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.

Offerors opting not to propose on this specific work item/TGI shall leave the fields blank.

IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
MATERIAL TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
ODC TOTAL (¥)¥0

4_38KB325102-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - FY27 7C1 BUNDLE34_38KB325102-A01 SUMMARY
SOLICITATION #:N6264926RA044
Work Item/TGI #:4_38KB325102-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPAIR INTAKE AND UPTAKE LOUVERS00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.

Offerors opting not to propose on this specific work item/TGI shall leave the fields blank.

IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
MATERIAL TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
ODC TOTAL (¥)¥0

5_38KB386501-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - FY27 7C1 BUNDLE35_38KB386501-A01 SUMMARY
SOLICITATION #:N6264926RA044
Work Item/TGI #:5_38KB386501-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - INST AND RMV SCAFFOLDING TO/FROM VARIOUS LOCATIONS FOR SHIP’S FORCE WORK00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.

Offerors opting not to propose on this specific work item/TGI shall leave the fields blank.

IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
MATERIAL TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
ODC TOTAL (¥)¥0

6_38KB312389-A02

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - FY27 7C1 BUNDLE36_38KB312389-A02 SUMMARY
SOLICITATION #:N6264926RA044
Work Item/TGI #:6_38KB312389-A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – INSPECT, REPAIR, AND PRESERVE IN NO. 2 GTM AND SSGTG NO. 2 INTAKE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.

Offerors opting not to propose on this specific work item/TGI shall leave the fields blank.

IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
MATERIAL TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
ODC TOTAL (¥)¥0

7_38KB312389-A03

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - FY27 7C1 BUNDLE37_38KB312389-A03 SUMMARY
SOLICITATION #:N6264926RA044
Work Item/TGI #:7_38KB312389-A03In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – INSPECT, REPAIR, AND PRESERVE IN SSGTG NO. 3 INTAKE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.

Offerors opting not to propose on this specific work item/TGI shall leave the fields blank.

IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
MATERIAL TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
MATERIAL BURDEN RATE (%)0.00%<--- Please input material burden rate
ODC TOTAL (¥)¥0

File details come from the government source that posted it. Updated .