SOW_TGI_38KB312386A01_c0v0.pdf

PDF 249 KB Posted

Attached to
USS HIGGINS (DDG 76) 6C1 BUNDLE 3
Solicitation number
N6264926RA044
Issued by

About this file

This is a Task Group Instruction (TGI) for maintenance work on the USS Higgins (DDG-76), a naval destroyer. The instruction document establishes requirements for inspection, repair, and preservation of the forward uptake space system, with work scheduled from June 29, 2026 through December 8, 2026.

The work encompasses multiple compartments and systems across the vessel, including the 05 Level Weather deck (Frames 189-216, Port and Starboard), Uptake Engine Room No. One, Ships Service Gas Turbine Generator (SSGTG) exhaust and intake trunks, passage ways, fan rooms, communication centers, Halon Cylinder Room, administrative offices, Tomahawk Equipment Room, and Auxiliary Machinery Room No. One. Specific deliverables include visual inspection of exterior and interior surfaces for corrosion and structural integrity; power tool cleaning to bare metal (up to 3,578 square feet); ultrasonic thickness measurements at up to 100 locations; removal and installation of three Boundary Layered Infrared Suppression (BLISS) caps; base metal weld build-up (up to 160 square inches); plate replacement (up to 94 square feet); stiffener installation (up to 75 linear feet); weld repairs (up to 25 linear feet); and surface coating per SSPC-SP 11 standards. The contractor must submit inspection reports with sketches identifying deficiencies and repair areas. A critical special requirement mandates fabrication and staging of a non-flammable closure to maintain fire zone boundaries during access work. Government-furnished materials include fibrous glass gaskets and ferrules, with the Navy providing crane services, utilities, and QA inspections. The instruction references multiple engineering drawings, maintenance standards, and nondestructive testing requirements per Navy and military specifications.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0440008 SF 30.pdf PDF
Solicitation Amendment - N6264926RA0440008 Conformed.pdf PDF
Solicitation Amendment N6264926RA0440006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440005 SF 30.pdf PDF
Att IX HIG_6C1_B3_POP_List_R4.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440007 SF 30.pdf PDF
SOW_TGI_38KB312389A02_c0v0.pdf PDF
Attachment II Price Proposal Form N6264926RA044 (rev1).xlsx XLSX spreadsheet
SOW_TGI_38KB312389A03_c1v1.pdf PDF
Solicitation Amendment N6264926RA0440003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440001 SF 30.pdf PDF
Exhibits - Contract Data Requirements List (CDRL).pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
SOW_TGI_38KB313103A01_c1v0.pdf PDF
Attachment (VIII) Contracts Data Sheet.pdf PDF
SOW_TGI_38KB386501A01_c0v0.pdf PDF
SOW_TGI_38KB325102A01_c0v0.pdf PDF
SOW_TGI_38KB312389A01_c1v0.pdf PDF
SOW_TGI_38KB312388A01_c0v0.pdf PDF
SOW_TGI_38KB312387A01_c0v0.pdf PDF
Attachment (VI) Source of Repair Instruction.pdf PDF
Attachment (V) Warranty Tracking Information.pdf PDF
Attachment (III) Request for Information Sheet.docx DOCX document
Solicitation - N6264926RA044.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment (II) Price Proposal Form N6264926RA044.xlsx XLSX spreadsheet
Pre-Solicitation Notice N6264926RA044.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: FWD UPTAKE SPACE AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-76 USS HIGGINS KB3

CU PHASE TITLE:

F/O - INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

KAZUMI WATANABE 231A 315-243-4518 19-DEC-2025

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 19-DEC-2025

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

SURFMEPP

This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: FWD UPTAKE SPACE AY A 0

FOUO

SHIP: DDG-76 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-7 J1-2 M1-4

1. SCOPE/PURPOSE

1.1 Title: Inspection, Repair, and Preservation of Forward Uptake Space; accomplish

1.2 Location of Work:

1.2.1 05 Level Weather, Frames between 189 and 216, Port and Starboard (Stbd)

1.2.2 Uptake Engine Room No. One (02-186-0-Q)

1.2.3 Intake/Uptake Engine Room No. One (01-174-0-Q)

1.2.4 Ships Service Gas Turbine Generator (SSGTG) Exhaust Trunk (2-166-2-Q)

1.2.5 Intake/Uptake Engine Room No. One (1-174-3-Q)

1.2.6 Passage (01-118-1-L)

1.2.7 SSGTG Intake Trunk (2-161-2-Q)

1.2.8 Fan Room Radio Transmitter Room Communication Center, Combat Information Center (01-158-0-Q)

1.2.8.1 Vent Plenum for HVAC Recirculating System (RS) 01-169-1

1.2.9 Halon Cylinder Room No. One (1-186-1-A)

1.2.10 Administer Office (1-158-4-Q)

1.2.11 Tomahawk Equipment Room (2-153-2-C)

1.2.12 Auxiliary Machinery Room No. One (4-126-0-E)

1.3 Identification:

1.3.1 Quantity (One Lot), Exterior Surface of 05 Level Deck Plating, Frames between 189 and 216, including vertical surface up to height of top of shroud from above 76 feet 5 inches above base line, Port and Stbd

1.3.2 Quantity (One EA), Boundary Layered Infrared Suppression System (BLISS) Cap, 1A Propulsion Gas Turbine Exhaust

1.3.3 Quantity (One EA), BLISS Cap, 1B Propulsion Gas Turbine Exhaust

1.3.4 Quantity (One EA), BLISS Cap, No. One SSGTG Exhaust

1.3.5 Quantity (One EA), 1A Propulsion Gas Turbine Exhaust Duct

1.3.6 Quantity (One EA), 1B Propulsion Gas Turbine Exhaust Duct

1.3.7 Quantity (One EA), SSGTG No. One Exhaust Duct

FOUO

SHIP: DDG-76 CHG/VER: 0/0

1.3.8 Quantity (One EA), 02 Level, 1A Module Gas Turbine Engine Deck Foundation and Bolting Ring

1.3.9 Quantity (One EA), 02 Level, 1B Module Gas Turbine Engine Deck Foundation and Bolting Ring

1.3.10 Quantity (One EA), 02 Level, Engine Room No. One SSGTG Deck Foundation and Bolting Ring

1.4 Security Classification:

1.4.1 Spaces - 1.2.11

1.5 Initial Condition: None.

1.6 Contractor work start date: 29/JUN/2026

1.7 Contractor work completion date: 8/DEC/2026

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 MP AL14-

KB312386-

CF03ZBM0

NO.1 SSGTG INTAKE SYSTEM

FOD PROTECTION FOR UPTAKE

PRESERVATION IN 2-166-2-Q

- Y AL

L

4 DWG 180-

6219046

Fdn Arr Dwg Dsgn Zone 4420 Bklt No.1

R Y SE

E N

OT

E

5 DWG 100-

6218913

UNIT STRL ARR DWG ASSY UNIT

W Y 3-

6 DWG 100-

6218918

UNIT STRL ARR DWG ASSY UNIT

R Y 3-

7 DWG 100-

6218914

UNIT STRL ARR DWG ASSY UNIT

W Y SE

E N

OT

E

8 DWG 100-

6218919

UNIT STRL ARR DWG ASSY UNIT

V Y SE

E N

OT

E

9 DWG 100-

6218915

UNIT STRL ARR DWG ASSY UNIT

V Y SE

E N

OT

E

10 DWG 100-

6218920

UNIT STRL ARR DWG ASSY UNIT

V Y SE

E N

OT

E

11 DWG 150-

6218955

UNIT STRL ARR DWG ASSY UNIT

Y Y SE

E N

OT

E

FOUO

SHIP: DDG-76 CHG/VER: 0/0

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

12 DWG 150-

6218962

UNIT STRL ARR DWG ASSY UNIT

V Y SE

E N

OT

E

13 DWG 150-

6218964

UNIT STRUCTURAL ARR DWG

ASSY UNIT 4410

W Y SE

E N

OT

E

14 DWG 150-

6218965

UNIT STRL ARR DWG ASSY UNIT

U Y SE

E N

OT

E

15 DWG 259-

6218406

FAB & INSTL OF GTRB UPTAKE &

AIR INTAKE ENG RM NO.1 &

ABOVE

W N

16 DWG 259-

6218421

FAB & INSTL of SS GTRB Uptake & Air Intakes AUX MCHRY RM

NO.1 & ABV

AB N

17 DWG 259-

8436353

SHIPALT DDG-51-76087 GTRB &

SS GTRB BLISS CAP MODS & ML

A Y AL

L

18 LAR

76087/DDG7

2/1141796

EXHAUST ANCHOR FDN CHOCK

NOT CONFIGURED LIKE

DRAWING

- Y AL

L

19 TM

SYSTEMS &

SPECIFICAT

IONS

SSPC Painting Manual Volume 2 - N

20 TM T9074-

AS-GIB-

010/271

Requirements for Nondestructive Testing Methods

1 N

21 TM S9086-

DA-STM-

010/CH-100

Hull Structures 4 N

22 MIL MIL-

STD-2035

Nondestructive Testing Acceptable Criteria

A N

3. APPENDICES:

3.1 Appendix “J” TGI Job Summary Information Sheet

3.2 Appendix "M" TGI Material List

3.3 Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 2.3.

(V)(G) “GAS TURBINE MAINTENANCE PROCEDURE”

5.2 Accomplish a visual inspection of the current ship condition, listed in 1.3.1 through 1.3.10, located in 1.2.1 through 1.2.5, using 2.4 through 2.18 for guidance, and as designated by the SUPERVISOR.

FOUO

SHIP: DDG-76 CHG/VER: 0/0

5.2.1 Ensure to inspect each exterior vertical, horizontal, step platform, deck, and foundation surface, and each interior exhaust stack, uptake duct, anchor foundation, eductor, eductor nozzle, eductor foundation, flange joint, overhead, bulkhead, deck, restraint, steel channel, penetration, deck spool, ladder foundation, bolting ring, and pipe hanger.

5.2.2 Mark each identified and designated area requiring repair.

5.2.3 Submit one legible copy, in hard copy or approved transferrable media, of a report with a sketch listing results of the requirements of 5.2 to the SUPERVISOR.

5.3 Remove each BLISS cap listed in 1.3.2 through 1.3.4, located in 1.2.1, using 2.17 and 2.18 for guidance.

5.4 Power tool clean to bare metal for each location reported in 5.2.3, listed in 1.3.1 through 1.3.10, located in 1.2.1 through 1.2.5, to include each exposed longitudinal, vertical, and transverse stiffener, for up to 3,578 square feet.

Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.19, as designated by the

SUPERVISOR.

5.5 Accomplish a visual inspection in each location for coating removed in 5.4, listed in 1.3.1 through 1.3.10, located in 1.2.1 through 1.2.5 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, using

2.4 through 2.18 for guidance.

5.5.1 Mark each corroded, damaged and/or deteriorated area.

5.5.2 Submit one legible copy, in hard copy or approved transferable media, of a report with a sketch listing results of the requirements of 5.5 to the SUPERVISOR.

5.6 Accomplish each ultrasonic thickness measurement (UTM) up to 100 locations in each location reported in 5.5.2, listed in 1.3.1 through 1.3.10, located in 1.2.1 through 1.2.5 in accordance with Paragraph 6.7 of 2.20 and 2.21, as designated by the SUPERVISOR, using 2.4 through 2.18 for guidance. The acceptance criteria must be in accordance with 2.22.

5.6.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 5.6 to the SUPERVISOR.

5.6.2 Ensure a sketch showing each location of each UTM reading, original material thickness, existing material thickness, and percentage of material thickness reduction.

5.7 Accomplish the following repairs to each BLISS Cap listed in 1.3.2 through 1.3.4, located in 1.2.1, in accordance with 2.15 through 2.18 as designated by the SUPERVISOR. See 5.15.4 and 5.15.5.

5.7.1 Remove existing and install new, up to 30 square feet of BLISS Cap.

5.8 Accomplish the following repairs reported in 5.2.3, 5.5.2, and 5.6.1, listed in 1.3.1 and 1.3.5 through 1.3.10, located in 1.2.1 through 1.2.5, using 2.4 through 2.18 for guidance, as designated by the SUPERVISOR. See 5.15.4 and 5.15.5.

5.8.1 Base metal weld build-up, up to 160 square inches.

5.8.1.1 Ensure each base metal buildup area does not exceed 2 inches in diameter.

5.8.1.2 Estimate the base metal buildup repair to be one quarter inch thick for pricing purposes.

5.8.1.3 Fill each local pit and groove with weld metal prior to the application of each principal build-up layer.

5.8.1.4 Ensure each surface is ground smooth to metal.

FOUO

SHIP: DDG-76 CHG/VER: 0/0

5.8.2 Remove existing and install new, up to 94 square feet of plate for each bulkhead, overhead, and deck plate.

5.8.3 Remove existing and install new, up to 75 linear feet of longitudinal, vertical, and traverse stiffener.

5.8.4 Remove existing and install new, up to 5 square feet of eductor foundation and flange joint.

5.8.5 Remove existing and install new each deck spool, gasket and bolting ring.

5.8.6 Vee out and weld up to 25 linear feet of cracked, split, broken or damaged weld.

5.8.7 Chip and grind each surface flush in way of each repair.

5.8.8 Template exact size, configuration, and location from each existing shipboard condition.

5.8.9 Accomplish the requirements of 009-012 of 2.1, including Table 2, Columns A, B, and D, Lines One through 7.

5.8.10 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld seam. Allowable leakage: None.

5.9 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 3, for coating removed in 5.4, listed in 1.3.1.

5.10 Accomplish the requirements of 009-032 of 2.1, including Table 3, Line(s) 22A, for coating removed in 5.4, located in 1.2.2 through 1.2.5.

5.11 Accomplish the requirements of 009-032 of 2.1, including Table 5, Line(s) 15A, for each Bliss Cap listed in

1.3.2 through 1.3.4.

5.12 Install each BLISS cap listed in 1.3.2 through 1.3.4, located in 1.2.1, in accordance with 2.17 and 2.18.

5.13 Confirm that all personnel have exited the space prior to closure of the space listed in 1.2.3 through 1.2.5, and

1.2.8.1. Designate one person to account for all personnel who may have entered the space.

5.14 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.

5.15 Notes:

5.15.1 Planner: Code 231A K. Watanabe, 243-4518

Planner: Code 234 T. Tsunoi, 070-7787-2058

5.15.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

5.15.3 This TGI meets the intent of DDG CSWT File No. 259-089.

5.15.4 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair in 5.7 and 5.8 are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.

5.15.5 Materials for structural members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.

5.15.6 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The

FOUO

SHIP: DDG-76 CHG/VER: 0/0

closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.15.7 WPC will copy the following pages in reference.

REF. 2.4: Pages 4, 4A-5, 5A1-9, 5B1-9, 5C1-9, 5D1-9, 5E1-9, 5F1-9, 7A1-7, 7B1-7, and 7C1-7.

REF. 2.7: Pages 5B-9, 7-11, 3-11, and 6-9.

REF. 2.8: Pages 5-11 and 3-10.

REF. 2.9: Pages 3-11, 5A-11, and 6-11.

REF. 2.10: Pages 3-11, 3A-11, and 5-11.

REF. 2.11: Pages 3-11, 5B-11, 7-11, and 5C-7.

REF. 2.12: Pages 7-1, 3-5, 6-5, 6A-5, 7B-10, and 5-5.

REF. 2.13: Pages 7-5, 6A-9, 3-11, and 5A-11.

REF. 2.14: Pages 3B-9, 3-7, 3D-7, 3A-10, and 3H-10.

5.15.8 JCNs CF03-ZBM0, EM01-ZCJ1, EM01-ZCJ2, EM01-ZCJ3, and EM01-ZCJ4 are related to this TGI.

5.16 Government Furnished Material (GFM):

5.16.1 SRF-JRMC will provide GFM listed in Appendix ”M”.

5.17 SRF-JRMC will provide the following service work: (TGI No. 38KB312386S02).

5.17.1 [C740] Crane and crane rigging service.

5.17.2 [X99E] Utility service, electrical.

5.17.3 [X99M] Utilities service, including water supply, steam supply, and low pressure air supply except onboard blasting work.

5.17.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.17.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.17.6 [C133] QA Inspection for (G) symbol(s).

5.17.7 [C285] Inspection for (G) symbol(s).

FOUO

J-1

SHIP: DDG-76 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FWD UPTAKE SPACE AY A 0 0

CU PHASE TITLE:

F/O - INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

CMPT 01-174-0-Q MS #1 SSGTG UPTAKE UT 05LVL & ABV EXTERIOR MS CMPT 2-166-2-Q

MS CMPT 1-174-3-Q MS #1 SSGTG INTAKE IT VNT RS 01-169-1 DT #1A GTM

UPTAKE UT #1B GTM UPTAKE UT CMPT 02-186-0-Q MS

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

38KB312386 A01

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI is to inspect, repair, and preserve forward uptake space.

Location of Work:

05 Level Weather, Frames between 189 and 216, Port and Starboard (Stbd) Uptake Engine Room No. One (02-186-0-Q) Intake/Uptake Engine Room No. One (01-174-0-Q) Ships Service Gas Turbine Generator (SSGTG) Exhaust Trunk (2-166-2-Q) Intake/Uptake Engine Room No. One (1-174-3-Q) Passage (01-118-1-L) SSGTG Intake Trunk (2-161-2-Q) Fan Room Radio Transmitter Room Communication Center, Combat Information Center (01-158-0-Q) Vent Plenum for HVAC Recirculating System (RS) 01-169-1 Halon Cylinder Room No. One (1-186-1-A) Administer Office (1-158-4-Q) Tomahawk Equipment Room (2-153-2-C) Auxiliary Machinery Room No. One (4-126-0-E)

FOUO

J-2

SHIP: DDG-76 CHG/VER: 0/0

FOUO

M-1

SHIP: DDG-76 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FWD UPTAKE SPACE AY A 0 0

CU PHASE TITLE:

F/O - INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

1 259-8436353

JOB ORDER: KEY OP:

38KB312386 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

400 M GASKET,FIBROUS GLASS,

GASKET, FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

TAPE,

SPEC: HH-P-31, TYPE I, CLASS

2, SIZE: 1/2"W X 1/8"THK X 20FT

L, REMARKS: NON ASBESTOS

REQUIRED,

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5330 LL4924382 NA 4 N 13/RO

NOTES:

FOUO

M-2

SHIP: DDG-76 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

401 M GASKET,FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, MATERIAL: FIBER GLASS,

WIRE INSERT, FIBER GLASS

SIZE: 81-11/16" OD X 76-7/16"

ID X 3/8" THK, BOLT CIRCLE

DIA: 79-11/16" , 36 BOLT

HOLES, 25/32 DIA HOLES,

HOLES EQUALLY SPACED

BIW CAT# 52248-469,

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5330 LL9810157 NA 4 N 4/EA

402 M FERRULE, FERRULE, FIBROUS

GLASS, WIRE-REINFORCED

PLAIN, CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 31/32"OD X 21/32"ID X

1/2" THK,

REMARKS: NON ASBESTOS

REQUIRED,

BIW CAT NO. 54638-027,

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5340 LL4941032 NA 4 N

350/EA

403 M WASHER,2, WASHER,

FIBROUS GLASS, WIRE-

REINFORCED PLAIN, CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

SIZE: 2" OD X 21/32" ID, 3/8"

THK.

BIW CAT#: 52419-026

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9Z 5310 LL4917124 NA 4 N 53467404

420/EA

404 M GASKET,FIBROUS GLASS,

GASKET, FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 88-11/16” OD X 83-7/16”

ID X 3/8” THK,

BOLT CIRCLE DIA: 86-11/16”,

40 BOLT HOLES, 25/32” DIA

HOLES, HOLES EQUALLY

SPACED,

BIW CAT# 52248-442

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5330 LL9810187 NA 4 N 2/SH

FOUO

M-3

SHIP: DDG-76 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

405 M GASKET,FIBROUS GLASS,

GASKET, FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 53-11/16"OD X 48-7/16"ID

X 3/8"THK,

REMARKS:BOLT CIRCLE DIA

51-11/16" (24) 25/32"DIA

HOLES* HOLES EQUALLY

SPACED*

BIW CAT NO. 52248-434

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5330 LL9604082 NA 4 N 3/EA

406 M FERRULE, FERRULE, FIBROUS

GLASS, WIRE-REINFORCED

PLAIN, CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 31/32"OD X 21/32"ID X

3/8"LG,

REMARKS: NON ASBESTOS

REQUIRED,

BIW CAT#: 54638-035,

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5340 LL4941033 NA 4 N

120/EA

407 M GASKET,FIBROUS GLASS,

GASKET, FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

CLOTH

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 62-11/16"OD X 57-7/16"ID

X 3/8"THK,

BOLT CIRCLE DIA: 60-11/16",

30 BOLT HOLES, 25/32" DIA

HOLES, EQUALLY SPACED,

REMARKS: NON ASBESTOS

REQUIRED,

BIW CAT NO. 52248-426,

C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5330 LL4941030 NA 4 N 1/EA

408 105 1 M GASKET,FIBROUS GLASS,

GASKET, FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 104-7/8" OD X 95-1/8" ID X

3/8" THK,

BOLT CIRCLE DIA: 102-3/8", 40

BOLT HOLES, 9/16" DIA

HOLES, EQUAL SPACED,

BIW CAT#: 52248-710 (OLD:

88033-507), C234 T.TSUNOI, 070-7787-2058

9B 5330 LL7051201 NA 4 N 2/EA

FOUO

M-4

SHIP: DDG-76 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

409 119 1 M GASKET,FIBROUS GLASS,

GASKET, FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 60-7/8" OD X 51-1/8" ID X

3/8" THK,

BOLT CIRCLE DIA: 58-3/8", 24

BOLT HOLES, 9/16" DIA

HOLES, EQUALLY SPACED,

BIW CAT#: 52248-728 (OLD:

88033-493), C234 T.TSUNOI, 070-7787-2058

ORDER FOR KTR

9B 5330 LL7051200 NA 4 N 1/EA

410 M GASKET,FIBROUS GLASS,

GASKET, FIBROUS GLASS,

WIRE-REINFORCED PLAIN,

CLOTH,

SPEC: HH-P-31, TYPE I, CLASS

1, SIZE: 106-11/16"OD X 101-

7/16"ID X 3/8"THK,

BOLT CIRCLE DIA: 104-11/16",

40 BOLT HOLES, 25/32" DIA

HOLES, HOLES EQUALLY

SPACED,

BIW CAT NO. 52248-451

C234 T.TSUNOI, 070-7787-2058

9B 5330 LL4941031 NA 4 N 2/EA

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-76 FWD UPTAKE SPACE AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38KB312386 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-76 FWD UPTAKE SPACE AY A 0

File details come from the government source that posted it. Updated .