This is a Task Group Instruction (TGI) document for the U.S. Navy detailing repair work on the USS Higgins (DDG-76). The document specifies structural repairs to the main deck weather area, frames 370-379 on the starboard side, with contractor work scheduled to commence on 29 June 2026 and complete by 8 December 2026.

The work scope includes removal, fabrication, and installation of corroded structural members including Stringer 21, Stringer 22, tripping brackets, vertical stiffeners, and a brass shield on a watertight transverse bulkhead. Materials required include 7 square feet of plate steel (stock number 002375333) and 14 square feet of additional plate steel (stock number 002243086), ordered through the contractor. The repair effort also encompasses surface treatment and reinstallation of rubber tile coverings on affected areas, with rubber tile work covered under separate TGIs 38KB313103U01 and 38KB313103R01. Special requirements mandate hot work procedures in magazine and adjacent spaces per S6740-AA-SAF-010 and NAVSEA OP 4, with prior verification required from Code 294 (VLS Subject Matter Expert) before work commencement. Support services to be provided by the shipyard include crane and rigging, electrical utilities, low/medium pressure air and water supply, safety and gas-free inspections, and QA inspections. The work responds to CCIMS deficiency report CCIMS-G1N6-DDG76-067-25 and resolves deficiency DDG-76-1023-2025.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0440008 SF 30.pdf PDF
Solicitation Amendment - N6264926RA0440008 Conformed.pdf PDF
Solicitation Amendment N6264926RA0440006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440005 SF 30.pdf PDF
Att IX HIG_6C1_B3_POP_List_R4.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0440007 SF 30.pdf PDF
SOW_TGI_38KB312389A02_c0v0.pdf PDF
Attachment II Price Proposal Form N6264926RA044 (rev1).xlsx XLSX spreadsheet
SOW_TGI_38KB312389A03_c1v1.pdf PDF
Solicitation Amendment N6264926RA0440003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0440001 SF 30.pdf PDF
Exhibits - Contract Data Requirements List (CDRL).pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
Attachment (VIII) Contracts Data Sheet.pdf PDF
SOW_TGI_38KB386501A01_c0v0.pdf PDF
SOW_TGI_38KB325102A01_c0v0.pdf PDF
SOW_TGI_38KB312389A01_c1v0.pdf PDF
SOW_TGI_38KB312388A01_c0v0.pdf PDF
SOW_TGI_38KB312387A01_c0v0.pdf PDF
SOW_TGI_38KB312386A01_c0v0.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment (II) Price Proposal Form N6264926RA044.xlsx XLSX spreadsheet
Attachment (VI) Source of Repair Instruction.pdf PDF
Attachment (V) Warranty Tracking Information.pdf PDF
Attachment (III) Request for Information Sheet.docx DOCX document
Solicitation - N6264926RA044.pdf PDF
Pre-Solicitation Notice N6264926RA044.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: MAIN WEA STRCT AY A 0 1

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-76 USS HIGGINS KB3

CU PHASE TITLE:

F/O - REPAIR STRUCTURAL MEMBER IN MAIN DECK WEATHER

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

KEIGO ABE 231A 315-243-3161 18-DEC-2025

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 18-DEC-2025

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

Contractor work start/completion date of 1.6 and 1.7 were missing.

CHANGE INSTRUCTIONS:

CH-1: Add contractor work start/completion date of 1.6 and 1.7.

SPECIAL REQUIREMENTS:

HOT WORK IN MAGAZINE AND ADJACENT SPACES IAW S6740-AA-SAF-010 AND NAVSEA OP 4

TGI CONCURRENCE BY CODE 294 MR. A. Kumagaya, DATED 12/12/2025

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: MAIN WEA STRCT AY A 0

FOUO

SHIP: DDG-76 CHG/VER: 1/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-4 J-1 M-1

1. SCOPE/PURPOSE

1.1 Title: Structural Member in Main Deck Weather; repair

1.2 Location of Work:

1.2.1 Main Deck Weather, Frames between 370 and 379, Starboard (Stbd)

1.2.2 Supply Department Storeroom No. 2 (2-370-3-A)

1.2.3 B-Size Module 61 Cell Vertical Launching System (3-338-0-M)

1.3 Identification:

1.3.1 Quantity (One Lot), Structural Member in Main Deck Weather, Frames between 372 and 378, Stbd

JCN: ES01-NALT

1.3.1.1 Quantity (One Lot), Stringer 21 (S) on Fashion Plate (S), Frames between 370 and 378, Stbd

Remarks: See Plan 4-A of 2.3 for material and detail

1.3.1.2 Quantity (One Lot), Tripping Bracket of Stringer 21 (S) and Vertical Stiffener on Fashion Plate (S), Frame 378, Frames between 375 and 377, Stbd

Remarks: See Detail 4-B of 2.3 for material and detail

1.3.1.3 Quantity (One Lot), Stringer 22 (S) on Fashion Plate (S), Frames between 373 and 379, Stbd

Remarks: See Plan 5-A of 2.3 for material and detail

1.3.1.4 Quantity (One Lot), Vertical Stiffener on Fashion Plate (S), Frame 374, Stbd

Remarks: See Plan 5-B of 2.3 for material and detail

1.3.2 Quantity (One EA), Brast Sheild on Watertight Transverse Bulkhead in Main Deck Weather, Frame 370, Stbd

Remarks: See Detail 152A-A of 2.4 for material and detail

1.3.3 Quantity (4 SF), Stringer 21 (S) on Fashion Plate (S), Frames between 370 and 378, Stbd

Remarks: The area where rubber tile is installed.

1.3.4 Quantity (2 SF), Stringer 22 (S) on Fashion Plate (S), Frames between 373 and 379, Stbd

Remarks: The area where rubber tile is installed.

1.3.5 Quantity (8 SF), Vertical Stiffener on Fashion Plate (S), Frame 374, Stbd

FOUO

SHIP: DDG-76 CHG/VER: 1/0

Remarks: The area where rubber tile is installed.

1.3.6 Quantity (6 SF), Vertical Stiffener on Fashion Plate (S), Frame 378, Stbd

Remarks: The area where rubber tile is installed.

1.3.7 Quantity (14 SF), Fashion Plate (S), Frames between 372 and 379, Stbd

Remarks: The area where rubber tile is installed.

1.3.8 Quantity (6 SF), Watertight Transverse Bulkhead, Frame 370, Stbd

Remarks: The area where rubber tile is installed.

1.4 Security Classification:

1.4.1 Spaces – 1.2.3

1.5 Initial Condition:

1.5.1 Contact Code 294 VLS SME prior to conducting the work procedure out of sequence in this TGI.

1.5.2 Potential Asbestos Hazard

1.6 Contractor work start date: 29/JUN/2026

1.7 Contractor work completion date: 8/DEC/2026

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 PDD 100-

ELM-260041

RPR PLAN OF CORRODED

STIFFENERS ON STBD FASHION

PL (MN DK, FR 372-378)

- Y AL

L

4 DWG 611-

6221132

FABRICATION OF MISC DECK

FITTING - ZONE 3

AK Y 15

2A

5 DWG 600-

6219304

HULL OUTFIT INSTL DESIGN

ZONE 3350 MN DK FR 370 - 410

(WEA)

AD Y 5C

6 DWG 100-

6218940

UNIT STRL ARR DWG ASSY UNIT

Y Y 5A -10

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

FOUO

SHIP: DDG-76 CHG/VER: 1/0

5. PROCEDURE:

5.1 Remove existing, fabricate, and install new each structural member and blast shield listed in 1.3.1 and 1.3.2 in accordance with 2.3 through 2.5, using 2.6 for guidance.

5.1.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.

5.2 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 46, for each area listed in 1.3.3 through 1.3.8.

5.3 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.

5.4 Notes:

5.4.1 Planner: Code 231A K. Abe, 243-3161

5.4.2 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG76-067-25 from TGI No. 38KBA11021I03.

5.4.3 This TGI clears DFS DDG-76-1023-2025 in its entirety.

5.4.4 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

5.4.5 Removal and installation of rubber tile on stringer, vertical stiffener, fashion plate, and watertight transverse bulkhead in main deck weather frames between 370 and 379 will be covered by TGI No(s). 38KB313103U01 and

38KB313103R01 (SRF-JRMC TGI).

5.4.6 Prior to commencement of the work, verification by Code 294 is required for work control and oversight relating to above, inside, or below the VLS launcher.

5.4.7 JCNs ES01-NALT, ES01-NALU, and ES01-NALW are related to this TGI.

5.5 Government Furnished Material (GFM):

5.5.1 SRF-JRMC will provide GFM listed in Appendix “M”.

5.6 SRF-JRMC will provide the following service work: (TGI No. 38KB313103S02).

5.6.1 [C740] Crane and crane rigging service.

5.6.2 [X99E] Utility service, electrical.

5.6.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

5.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.6.6 [C133] QA Inspection for (G) symbol(s).

5.6.7 [C294] Work scope review and verification for VLS relating work prior to commencement of the work.

FOUO

J-1

SHIP: DDG-76 CHG/VER: 1/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

MAIN WEA STRCT AY A 0 0

CU PHASE TITLE:

F/O - REPAIR STRUCTURAL MEMBER IN MAIN DECK WEATHER

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

MAIN DECK EXT STBD MS

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

38KB313103 A01

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI is to repair structural member in main deck weather.

Location of Work:

Main Deck Weather, Frames between 370 and 379, (Stbd) Supply Department Storeroom No. 2 (2-370-3-A) B-Size Module 61 Cell Vertical Launching System (3-338-0-M)

FOUO

M-1

SHIP: DDG-76 CHG/VER: 1/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

MAIN WEA STRCT AY A 0 0

CU PHASE TITLE:

F/O - REPAIR STRUCTURAL MEMBER IN MAIN DECK WEATHER

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38KB313103 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M PLATE,ME, ORDER FOR KTR

ORIGINATOR C231A K. ABE

243-3161

9B 9515 002375333 NA 4 N 53535127 7/SF

002 M PLATE,ME, ORDER FOR KTR

ORIGINATOR C231A K. ABE

243-3161

9B 9515 002243086 NA 4 N 53535129 14/SF

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-76 MAIN WEA STRCT AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38KB313103 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-76 MAIN WEA STRCT AY A 0