This is a Task Group Instruction (TGI) document for ship maintenance work on the USS Higgins (DDG-76), prepared by the U.S. Navy. The instruction outlines inspection, repair, and preservation work on Ship Service Gas Turbine Generator (SSGTG) No. 3 dirty side intake system located in compartment 1-378-0-Q.
The work scope includes: visual inspection of current ship condition for corrosion, damage, and deterioration across decks, bulkheads, overhead surfaces, steel channels, stiffeners, penetrations, pipe hangers, and vibration damping; power tool cleaning to bare metal up to 300 square feet using SSPC-SP 11 surface preparation standards; ultrasonic thickness measurements at up to 50 locations with acceptance criteria per MIL-STD-2035; base metal buildup totaling 30 square inches (maximum 2-inch diameter per area, one-quarter inch thick); removal and installation of 10 square feet of deck, overhead, and bulkhead; removal and installation of 5 linear feet of stiffeners; vee out and welding of 2 linear feet of cracked or damaged welds; and coating application per SSPC Painting Manual Volume 2. Contractor work commences June 29, 2026, with completion by December 8, 2026. The instruction specifies that a non-flammable closure must be fabricated and staged per COMNAVDEASYSCOM requirements due to fire zone boundary work. Supporting reference materials include NSI and LI standard items, drawing packages, nondestructive testing procedures, and hull structure specifications. SRF-JRMC will provide ancillary services including crane operations, utilities, safety inspections, gas-free inspections, QA inspection, and on-site engineering support. The material list (Appendix M) is currently blank, with materials to be provided based on contractor condition reports.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: AFT INTAKE AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-76 USS HIGGINS KB3
CU PHASE TITLE:
F/O – INSPECT, REPAIR, AND PRESERVE IN SSGTG NO. 3 INTAKE
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
MISAKI KANEHIRA 231A 315-243-9883 30-APR-2026
APPROVED BY: CODE PHONE DATE
YUUJI NAKMURA 231A 315-243-6041 30-APR-2026
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Need to revise task name.
CHANGE INSTRUCTIONS:
CH-1: Revised task name. (05/06/2026)
SPECIAL REQUIREMENTS:
SURFMEPP
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: AFT INTAKE AY A 0
FOUO
SHIP: DDG-76 CHG/VER: 1/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J1-2 M-1
1. SCOPE/PURPOSE
1.1 Title: Ship Service Gas Turbine Generator (SSGTG) No. 3 Dirty Side Intake; inspect, repair, and preserve
1.2 Location of Work:
1.2.1 SSGTG Intake Trunk (Dirty Side) (1-378-0-Q)
1.2.2 SSGTG Intake Trunk (Clean Side) (1-378-0-Q)
1.3 Identification:
1.3.1 Quantity (One EA), Dirty Side of SSGTG No. 3 Intake in 1-378-0-Q
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 29/JUN/2026
1.7 Contractor work completion date: 8/DEC/2026
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 MP LM23-
KB312389-
EM02ZBY2
2A /2B GTM & NR.2/NR.3 SSGTG
INTK SYS FOD PRTN FOR INTK
DIRTY SIDE PARTIALLY RPR
- Y AL
L
4 DWG 100-
6218944
UNIT STRUCTURAL ARR DWG
ASSY UNIT 3350
W Y SE
E N
OT
E
5 DWG 100-
6218943
UNIT STRL ARR DWG ASSY UNIT
AB Y 3-
6 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
7 TM T9074-
AS-GIB-
010/271
Requirements for Nondestructive Testing Methods
1 N
8 TM S9086-
DA-STM-
010/CH-100
Hull Structures 4 N
FOUO
SHIP: DDG-76 CHG/VER: 1/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
9 MIL MIL-
STD-2035
Nondestructive Testing Acceptable Criteria
A N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 2.3.
(V)(G) "GAS TURBINE MAINTENANCE PROCEDURE"
5.2 Accomplish a visual inspection of the current ship condition, listed in 1.3.1 and located in 1.2.1, using 2.4 and 2.5 for guidance.
5.2.1 Ensure to inspect each deck, bulkhead, overhead surface, steel channel, stiffener, penetration, pipe hanger and vibration damping.
5.2.2 Mark each corroded, damaged and/or deteriorated area.
5.2.3 Submit one legible copy, in hard copy or approved transferable media, of a report with a sketch listing results of the requirements of 5.2 to the SUPERVISOR.
5.3 Power tool clean to bare metal each location reported in 5.2.3, located in 1.2.1, to include each exposed longitudinal, vertical, and traverse stiffener, for up to 300 square feet. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.6, as designated by the SUPERVISOR.
5.4 Accomplish a visual inspection of each surface power tool cleaned to bare metal in 5.3, listed in 1.3.1, located in
1.2.1 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, using 2.4 and 2.5 for guidance.
5.4.1 Mark each corroded, damaged and/or deteriorated area.
5.4.2 Submit one legible copy, in hard copy or approved transferable media, of a report with a sketch listing results of the requirements of 5.4 to the SUPERVISOR.
5.5 Accomplish each ultrasonic thickness measurement (UTM) up to 50 locations in each location reported in 5.4.2, listed in 1.3.1, located in 1.2.1 in accordance with Paragraph 6.7 of 2.7 and 2.8, as designated by the SUPERVISOR, using 2.4 and 2.5 for guidance. The acceptance criteria must be in accordance with 2.9.
5.5.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 5.5 to the SUPERVISOR.
FOUO
SHIP: DDG-76 CHG/VER: 1/1
5.5.2 Ensure a sketch showing each location of each UTM reading, original material thickness, existing material thickness, and percentage of material thickness reduction.
5.6 Accomplish the following repairs reported in 5.2.3, 5.4.2 and 5.5.1, listed in 1.3.1, located in 1.2.1 as designated by the SUPERVISOR, using 2.4 and 2.5 for guidance. See 5.9.5 and 5.9.6.
5.6.1 Base metal buildup, a total of 30 square inches.
5.6.1.1 Ensure each base metal buildup area does not exceed 2 inches in diameter.
5.6.1.2 Estimate the base metal buildup to be one quarter inch thick for pricing purposes.
5.6.1.3 Fill each local pit and groove with metal prior to the application of each principal build-up layer.
5.6.1.4 Each surface must be ground smooth to metal.
5.6.2 Remove existing and install new, a total of 10 square feet of deck, overhead, and bulkhead.
5.6.3 Remove existing and install new, a total of 5 linear feet of longitudinal, vertical, and transverse stiffener.
5.6.4 Vee out and weld a total of 2 linear feet of cracked, split, broken or damaged intake weld.
5.6.5 Chip and grind each surface flush in way of each repair.
5.6.6 Template exact size, configuration, and location from each existing shipboard condition.
5.6.7 Accomplish the requirements of 009-012 of 2.1, including Table 2, Columns A and D, Lines One through 7.
5.6.8 Accomplish the requirements of 009-025 of 2.1 for an air hose test of each new weld seam. Allowable leakage:
None.
5.7 Accomplish the requirements of 009-032 of 2.1, including Table 3, Line(s) 20, located in 1.2.1, for coating removed in 5.3.
5.7.1 Power tool clean to bare metal for each area. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.6.
5.8 Accomplish the requirements of 009-032 of 2.1 for new and disturbed surface.
5.9 Notes:
5.9.1 Planner: Code 231A M. Kanehira, 243-9883
Planner: Code 231A R. Nanba, 243-6141
5.9.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560.
5.9.3 This TGI meets the intent of DDG CSWT File No. 251-044.
5.9.4 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkhead normally used to control air flow in the event of a shipboard fire. A non- flammable closure is required in accordance with COMNAVDEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
FOUO
SHIP: DDG-76 CHG/VER: 1/1
5.9.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.9.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.9.7 WPC will copy the following pages in reference.
REF. 2.4: Sheets 7-1, 3-11, 3A-11, 3B-11, 4-11, 5-11, and 6-11.
5.9.8 JCNs EM02-ZBY2, EM02-ZBY3, EM02-ZBY4, EM02-ZBY5, and EM04-ZAL8 are related to this TGI.
5.10 Government Furnished Material (GFM): None
5.11 SRF-JRMC will provide the following service work: (TGI No. 38KB312389S02)
5.11.1 [C740] Provide crane and crane rigging service.
5.11.2 [X99E] Provide utility service, electrical.
5.11.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.
5.11.4 [C106.1] Provide safety inspection for SRF-JRMC employees.
5.11.5 [C106.2] Provide gas free inspection for SRF-JRMC employees.
5.11.6 [C133] Provide QA inspection for (G) symbol(s).
5.11.7 [C250] Provide on-site engineering support for front loading.
5.11.8 [C285] Provide inspection for (G) symbol(s).
FOUO
J-1
SHIP: DDG-76 CHG/VER: 1/1
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
AFT INTAKE AY A 0 1
CU PHASE TITLE:
F/O – INSPECT, REPAIR, AND PRESERVE IN SSGTG NO. 3 INTAKE
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CMPT 1-378-0-Q MS #3 SSGTG INTAKE IT
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
FUJINO ,YUUKI
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
38KB312389 A03
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to inspect, repair, and preserve in ship service gas turbine generator (SSGTG) No. 3 dirty side intake
Location of Work:
SSGTG Intake Trunk (Dirty Side) (1-378-0-Q) SSGTG Intake Trunk (Clean Side) (1-378-0-Q)
FOUO
J-2
SHIP: DDG-76 CHG/VER: 1/1
FOUO
M-1
SHIP: DDG-76 CHG/VER: 1/1
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
AFT INTAKE AY A 0 1
CU PHASE TITLE:
F/O – INSPECT, REPAIR, AND PRESERVE IN SSGTG NO. 3 INTAKE
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38KB312389 A03
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-76 AFT INTAKE AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38KB312389 A03
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-76 AFT INTAKE AY A 0