This is a solicitation for an indefinite delivery indefinite quantity (IDIQ) multiple award construction contract for new construction, repair, and renovation of airfield paving and heavy duty paving projects at various government installations located in California, Arizona, Nevada, Utah, Colorado, and New Mexico. The solicitation is unrestricted with one award reserved for a highly qualified small business. The maximum dollar amount for all contracts combined is $495 million. The estimated task order range is $500,000 to $50 million. Offerors must demonstrate a minimum aggregate bonding capacity of $100 million. Proposals are due by November 10, 2023 at 2:00 PM local time and shall be submitted electronically through the Department of Defense Solicitation Module in the Procurement Integrated Enterprise Environment. The performance period for basic contracts will be one base period of two years with three one-year option periods for a maximum of 60 months. Evaluation will result in determination of the most highly qualified offerors for potential multiple award of indefinite delivery indefinite quantity contracts.

View the file

Other files

File Type Posted
Revised SF 1442 _ 3.25.2024.pdf PDF
Amendment 0008_3.25.2024.pdf PDF
Amendment 0007_11.15.2023.pdf PDF
RFI Log_Airfield Paving MACC 11.15.2023.xlsx XLSX spreadsheet
RFI Log_Airfield Paving MACC 11.14.2023.xlsx XLSX spreadsheet
Amendment 0006_ 11.9.23.pdf PDF
Specification 02 41 00 Demolition_Amendment 0006.pdf PDF
Specification 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements_Amendment 0006.pdf PDF
Specification 31 00 00 Earthwork_Amendment 0006.pdf PDF
Exhibit F_SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD)_Amendment 0006.docx DOCX document
Planset Amendment 0006.pdf PDF
RFI Log_Airfield Paving MACC 11.8.2023.xlsx XLSX spreadsheet
RFI Log_Airfield Paving MACC 11.7.2023.xlsx XLSX spreadsheet
Exhibit A_ OFFEROR TEAM COMPOSITION AND MANAGEMENT rev 1 _Amendment 0005.docx DOCX document
RFI Log_Airfield Paving MACC 11.2.23.xlsx XLSX spreadsheet
Specification 01 45 00.00 20_Quality Control_ Amendment 0005.pdf PDF
Amendment 0005 _ 11.2.23.pdf PDF
Planset_Amendment 0005.pdf PDF
RFI Log_Airfield Paving MACC 10.30.23.xlsx XLSX spreadsheet
Amendment 0004 _ 10.25.2023.pdf PDF
RFI Log_Airfield Paving MACC 10.16.23.xlsx XLSX spreadsheet
RFI Log_Airfield Paving MACC 10.4.23.xlsx XLSX spreadsheet
Amendment 0003 _ 10.4.2023.pdf PDF
MACC Frequently Asked Questions_ Amendment 0002.pdf PDF
Amendment 0002_9.27.2023.pdf PDF
Offerors Team Consent Form_ Amendment 0002.doc DOC document
RFI Log_Airfield Paving MACC 9.26.23.xlsx XLSX spreadsheet
Wage Determination 9.15.2023 Amendment 0001.pdf PDF
Repair Flightline Apron Final Specification 06.12.23.pdf PDF
Repair Flightline Apron Planset 06.12.23.pdf PDF
RFP Part 1_ AIRFIELD MACC AIRFIELD.pdf PDF
Amendment 0001 _ 9.19.2023.pdf PDF
Section 00 45 00 - Representations and Certifications.docx DOCX document
RFI Log_Airfield Paving MACC 9.12.23.xlsx XLSX spreadsheet
Exhibit D_ SAFETY DATA SHEET.docx DOCX document
Surety Form_Airfield Paving MACC.doc DOC document
Exhibit A_ OFFEROR TEAM COMPOSITION AND MANAGEMENT.docx DOCX document
Exhibit F_SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD).docx DOCX document
Exhibit C_Past Performance Questionnaire.docx DOCX document
Exhibit E _HISTORICAL SMALL BUSINESS UTILIZATION.docx DOCX document
Instructions for Viewing Interested Vendors List.pdf PDF
Solicitation_N6247323R0408_Airfield Paving MACC_20230912.pdf PDF
Financial Questionnaire_Airfield Paving MACC.doc DOC document
Exhibit B_ CONSTRUCTION EXPERIENCE DATA SHEET _OFFEROR.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5971123

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) UNRESTRICTED MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, REPAIR, AND/OR RENOVATION OF AIRFIELD PAVING AND HEAVY DUTY PAVING PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CALIFORNIA, ARIZONA, NEVADA, UTAH, COLORADO, AND NEW MEXICO

This is an unrestricted procurement w ith one aw ard reserved for a most highly qualif ied small business. Price evaluation preference w ill be given to HUBZone firms, in accordance w ith FAR 52.219-4.

NAICS: 237310 Size Standard: $45 Million Maximum dollar amount for all contracts combined is $495,000,000.

Estimated Task Order range is $500,000 to $50,000,000

Construction Contract – Net 14 days for payment (FAR 52.232-27) Minimum Guarantee is $5,000 Offerors must demonstrate a minimum aggregate bonding capacity of $100 million to allow for the management of multiple, concurrent projects at the higher dollar magnitude w ithin the task order price range.

BRITNEY MACHADO-POTESTIO 619-705-4665

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

12-Sep-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________10 Nov 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC SOUTHWEST

PLANNING, DESIGN & CONSTRUCTION REGIONAL

CODE: PDCCORE

750 PACIFIC HIGHWAY

SAN DIEGO CA 92132-0001

N62473

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N6247323R0408 126

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N6247323R0408

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 495,000,000 Each Airfield Paving MACC

FFP

This is an indefinite delivery indefinite quantity (IDIQ) contract with no pre-established fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer or his/her properly authorized representative, who will issue written task orders to the Contractor. Award of the task order will be on a firm-fixed price basis. Maximum of $495,000,000 is for all contracts combined and will serve as the maximum/NTE amount of the entire contract period. The performance period for the basic contracts will be for a one (1) base period of two-years with three (3) one-year option periods. The Government has the option to extend the term of the contract for a term of up to three (3) one-year option periods for a maximum of 60 months, by written notice, to the Contractor within the performance period specified in the Schedule.

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR5971123

PSC CD: Y1BD

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Each Proposed Task Order (PTO) 0001

FFP

Repair Flightline Apron at Naval Air Station Point Mugu, Naval Base Ventura County, CA FOB: Destination

PURCHASE REQUEST NUMBER: ACQR5971123

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

Section 00 21 16 - Instructions to Proposers

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

1. Inquiries

Inquiries regarding the Request for Proposal (RFP) shall be submitted electronically using the Request for Information (RFI) form provided as an attachment. The Point of Contacts (POC) for inquiries is Britney Machado- Potestio at 619-705-4665 or via email at britney.l.machado-potestio.civ@us.navy.mil and Christina Laudick at 619- 571-4442 or via email at christina.d.laudick.civ@us.navy.mil. The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date.

2. Proposal Submittal Requirements

Proposals submitted in response to this solicitation shall be formatted as follows and furnished in the number of copies stated herein. A cover letter shall accompany the proposal.

The cover letter shall include—

(a) The solicitation number;

(b) The name, address, telephone and facsimile numbers, and email address of the Offeror and Lead

Design Firm(s);

(c) The Unique Entity Identifier (UEI) Number, CAGE Code, and Tax Identification Number

(TIN) of the Offeror;

(d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(e) Names, titles, phone numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation and;

(f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

In addition to the cover letter, the Offeror shall submit an Offeror’s Team Consent Form for each major subcontractor/teaming partner (e.g., team member, subcontractor (i.e., Lead Design Firm(s)), parent company, subsidiary, or other affiliated company, etc.) identified in the Offeror’s proposal.

Proposals submitted in response to this solicitation shall be formatted as follows:

Cover Letter Offeror’s Team Consent Form(s) First two pages of SF1442 - with blocks 14 through 20c completed Financial Questionnaire (to be completed and submitted by financial institution) Surety Form Section 00 45 00 – Representations and Certifications VETS-4212 Report Submission Confirmation (or Statement of Non-applicability) Tab 1 - Factor 1, Technical Approach (Exhibit “A,” Offeror Team Composition and Management) Tab 2 - Factor 2, Experience (Exhibits “B” Construction Experience Project Data Sheet – Offeror)

- Factor 3, Past Performance (Exhibits “C” NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0)) (Evaluations should immediately follow the project shown on Exhibits “B” to which they pertain)

Tab 3 - Address any adverse past performance issues, if applicable Tab 4 - Factor 4, Safety (Exhibit “D” Safety Data Sheet/Safety Narrative)

Tab 5 - Factor 5, Small Business Participation (Exhibit “E” Past Performance – Small Business Participation), Tab 6 - Factor 6, Price - Based on Proposed Task Order 0001 (SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Pricing Schedule for PTO #0001; Bid Bond (in the amount of 20% of the proposal price for PTO #0001 or $3,000,000, whichever is less))

Representations and Certifications, Financial Questionnaires, and Surety Forms will not be rated. However, they will be considered in assessing the Offeror’s responsibility.

Offerors are asked to submit only the information/exhibits required. Do not submit any additional information such as brochures, CDs, or other pre-printed materials.

Instructions for electronic submission of proposals are provided below:

Proposals shall be submitted electronically using the Department of Defense (DoD) Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE) located at https://piee.eb.mil/.

Offerors are instructed to electronically submit their complete proposal in one (1) single file, formatted in Portable Document Format (PDF) with a .pdf file extension.

Additional information regarding the PIEE Solicitation Module:

In order to submit a proposal through the PIEE Solicitation Module, you must be registered as a Proposal Manager in the DoD PIEE Suite located at https://piee.eb.mil/. The PIEE Solicitation Module Vendor Registration Guide is provided as an attachment to the RFP.

The PIEE Solicitation Module is the only electronic commerce method authorized for the submission of proposals in response to this solicitation. Submissions outside of the PIEE Solicitation Module will not be considered.

The PIEE Solicitation Module will record the date and time of proposal submission. The date and time of proposal submission recorded in the PIEE Solicitation Module shall govern the timeliness of any proposal submission.

The maximum allowable file size for the PIEE Solicitation Module is 1.9GB.

Late submissions may not be considered.

It is an Offeror’s responsibility, when transmitting its proposal electronically, to ensure the proposal’s timely delivery by transmitting the proposal sufficiently in advance of the time set for receipt of proposals to allow for timely receipt by the Government no later than the date and time stated in Block 13 of the

SF1442.

Offerors shall allow adequate time to upload files, which may be slower for non-DoD users, and to avoid other technical difficulties that may be encountered. An Offeror risks the late receipt and rejection of a proposal where it delays transmitting its proposal until the last few minutes before the time set for receipt of proposals. Proposals that are received after the stated date and time in Block 13 of the SF1442 may not be considered.

Offerors are responsible for submitting their proposal in the format specified, consistent with requirements stated elsewhere in this solicitation. Offerors are asked to submit only the information/exhibits required.

Page limits, if stipulated, must be adhered to. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

3. Pre-Proposal Conference

(a) A pre-proposal conference and site visit will not be conducted at this time.

(b) A list of Frequently-Asked-Questions (FAQ) with appropriate responses is provided as an attachment to the RFP. All firms are encouraged to review the FAQ. The FAQ should be viewed prior to submitting any questions regarding the RFP.

(c) Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands all requirements of the solicitation.

(d) All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. Amendments will be posted on the website at https://www.SAM.gov.

However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.

4. Financial Questionnaire

Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should send the completed questionnaire via email directly to Britney Machado-Potestio at britney.l.machado-potestio.civ@us.navy.mil and Christina Laudick at christina.d.laudick.civ@us.navy.mil. Please ensure the financial institution utilizes the form provided in order to submit the requested information. Links to websites and/or files with .zip file extensions may not be accepted. Additionally, please ensure financial questionnaires are submitted by the Phase One proposal due date.

If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.

5. Surety Form

Offerors shall submit the Surety Form to report their surety bonding information, verifying aggregate bonding capacity, current available bonding, as well as single project limit. Ensure the name of the Offeror’s surety, including the name and phone number of the Offeror’s agent within the surety, is shown on the form.

If the Offeror is a joint venture, one Surety Form shall be submitted for the joint venture, not the individual partners.

6. System for Award Management

Contractors must be registered in the System for Award Management (SAM) prior to award of a DoD contract. In order to participate on this solicitation, contractors must also complete electronic representations and certifications.

For more information and to complete the electronic Reps & Certs, see the SAM website at http://www.sam.gov. A contract cannot be awarded to a contractor not registered in SAM. Remember to review the NAICS codes listed in your SAM record to ensure that you have listed the NAICS code for this procurement.

Note: Offerors must complete and submit Section 00 45 00 of the RFP as part of their proposal even if the Offeror is registered in SAM. Section 00 45 00 of the RFP contains clauses which are not found in the electronic

Reps & Certs in SAM; therefore, we require them to be completed and submitted as part of your proposal. The clauses found in Section 00 45 00 of the RFP are also broken out as a separate form titled “Section 00 45 00 – Representations and Certifications” which can be found with the other RFP Exhibits.

7. Federal Contractor Reporting

In accordance with Federal Acquisition Regulation (FAR) 22.13, any contractor or subcontractor with a contract or subcontract with the Federal Government of $150,000 or more that was entered into on or after October 1, 2015 (or $100,000 or more that was entered prior to October 1, 2015) must take affirmative action to hire and promote qualified covered veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.

If subject to the reporting requirements, companies must file an annual VETS-4212 Report, which shows the number of covered veterans in their workforce and number of new hires, including covered veterans hired during the reporting period. Instructions, information, and follow-up assistance is provided at VETS-4212 Internet site at http://www.dol.gov/vets/vets4212.htm or employers may contact the VETS-4212 customer support at (866) 237- 0275 or e-mail at VETS4212-customersupport@dol.gov.

VETS-4212 Reports must be filed between August 1 and September 30 of each year following a calendar year in which a contractor or subcontractor held a covered contract or subcontract.

Upon the successful submission of a VETS-4212 report, federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission for the current reporting period. DO NOT SUBMIT A COPY OF THE REPORT ITSELF. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.

A contract cannot be awarded to a contractor that has not submitted a required annual form VETS-4212, Federal Contractor Veterans’ Employment Report (VETS-4212 Report) if subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.

8. Incurred Expenses

The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

9. No Alternate or Multiple Proposals

Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

10. Mentor Protégé Agreements

Only Mentor Protégé Agreements formally approved by the SBA will be considered for this procurement. Mentor Protégé Agreements approved by other agencies will not be considered. The proposal shall contain both the Joint Venture Agreement and the SBA letter of approval for the Mentor Protégé Agreement, showing the approval is valid as of the date of the proposal submission.

BASIS OF AWARD AND FACTORS

BASIS OF AWARD AND EVALUATION FACTORS

1. BASIS OF AWARD

Selection of contractor(s) will be accomplished using Source Selection Procedures on the basis of Best Value to the Government, using the tradeoff process as described in FAR 15.101-1. This process allows for a tradeoff between non-price factors and price and allows the Government to accept other than the lowest priced proposal or other than the highest technically rated proposal to achieve a best-value contract award. Interested firms are expected to review the RFP and participate in a pre-proposal conference and site visit (if conducted), provide proposed prices for the initial project, and provide proposal information requested to evaluate their technical and past performance factors.

The One Phase Design Build procedures per FAR 36.303-1 will be used for this procurement. The solicitation is in accordance with FAR Part 36.3. Evaluation will result in a determination of the most highly qualified Offerors.

The Government anticipates three (3) or more multiple award construction contracts. Offerors are advised that those Offerors who are selected to proceed are not guaranteed receipt of a contract award. Award of the basic multiple award construction contracts will be made to those responsible Offerors whose proposals conforming to the solicitation are determined to be the most advantageous to the Government considering past performance, technical, and price factors. The Government reserves the right to award three (3) or more contracts under this solicitation or to award only the initial project (Proposed Task Order 0001) identified in the RFP as a single-action contract. The Government reserves the right not to award the Proposed Task Order 0001. The Government reserves the right to substitute or add other design-build projects that meet the scope of the MACC. Subject to the availability of funds, the Government reserves the right to delay or cancel the award of PTO 0001 at time of the basic contract award. If the task order is not awarded with the basic award, the guaranteed minimum will be awarded.

The Government reserves the right to reject any or all basic contract offers at any time prior to award; to negotiate with any one or all Offerors; to award the contract to other than the Offeror submitting the lowest total price; and to award contracts to three or more Offerors submitting proposals determined by the Source Selection Authority to be the most advantageous to the Government.

OFFERORS ARE ADVISED THAT IT IS POSSIBLE THAT AN AWARD MAY BE MADE WITHOUT

DISCUSSIONS OR ANY CONTACT CONCERNING THE PROPOSALS RECEIVED. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they would be contacted or afforded the opportunity to qualify, discuss, or revise their proposal. Firms participating in the pre-proposal conference and site visit (if conducted) will not be compensated for their participation.

Successful Offerors will receive the following contract awards:

The Offeror submitting the proposal, conforming to the RFP, determined to represent the Best Value receives award with a minimum guarantee and the initial project, if the Government chooses to award it. Second, third, and any additional selected contractor will each receive award with a minimum guarantee, and selection will be based on the same criteria as the first selection.

2. DEFINITIONS

100% COMPLETE: For construction projects: The facility is completely constructed and ready for the intended use. For design projects: 100% plans and specifications signed off by an Architect-Engineer and ready for construction with final cost estimate. Does not include any Post Construction Award Support (PCAS).

ACCEPTABLE FEATURES: A proposed method or technique in the proposal that addresses solicitation requirements such that no further explanation or documentation is necessary.

BEST VALUE: The expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement. See FAR 2.101.

CLARIFICATIONS: Limited exchanges between the Government and offerors that may occur when award without discussion is contemplated. See FAR 15.306(a)(1).

COMMUNICATIONS: Exchanges between the Government and offerors after receipt of proposals, leading to establishment of the competitive range. See FAR 15.306(b).

COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one (1) task/delivery order.

COMPETITIVE RANGE: The most highly rated proposals (based on the rating of each proposal against all evaluation criteria), unless the range is further reduced for purposes of efficiency. FAR 15.306(c).

CONTRACTOR TEAMING ARRANGEMENT: An arrangement in which two (2) or more companies form a partnership or joint venture to act as a potential prime contractor, or a potential prime contractor agrees with one (1) or more companies to have them act as its subcontractor(s), under a specified Government contract or acquisition program. A proposed contractor teaming arrangement will be recognized by the Government, provided the Offeror identifies, in its proposal, the type of arrangement, fully discloses company relationships, and includes a copy of the partnership, joint venture agreement, or teaming agreement with the proposal package.

DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. A deficiency results in a proposal being unawardable unless corrected through discussions.

See FAR 15.001.

DESIGN-BID-BUILD: Refers to the traditional delivery method where design and construction are sequential and contracted for separately with two (2) separate contracts and contractors; one (1) for an A-E contract and one (1) for a construction contract. For purposes of this solicitation, early contractor involvement and construction manager at risk, will be considered Design-Bid-Build.

DESIGN-BUILD: Refers to combining design and construction in a single contract with one (1) contractor.

Design-build projects require design of the project by a licensed professional (i.e. engineer, architect). Projects that only require shop drawing level effort are not design-build projects.

DISCUSSIONS: Exchanges (i.e., negotiations) in a competitive environment that are undertaken with the intent of allowing the offeror to revise its proposal. Discussions take place after establishment of the competitive range.

EVALUATION NOTICE (EN): PCO’s written notification to the offeror for purposes of clarifications, communications, or discussions.

EXPERIENCE: Work performed by an Offeror and Offeror’s Team within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity. Experience is distinct from past performance (how well an Offeror has performed).

FIVE-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience or past performance. The five-year period is calculated by counting back five (5) years from the initial RFP issuance date.

JOINT VENTURE (JV): An arrangement of two (2) or more businesses (parties) to compete and perform as prime contractor for a contract.

LEAD DESIGN FIRM / DESIGN TEAM: The Offeror’s primary proposed design firm(s) and any in-house lead designer(s).

MEANINGFUL INVOLVEMENT: Provision of, or reliance upon, the workforce, management, facilities, or other resources of an affiliate/subsidiary/parent/LLC/LTD, such that the affiliate/subsidiary/parent/LLC/LTD will be involved in the contract effort with the Offeror, and thereby affect the performance of the Offeror.

NEW CONSTRUCTION: Projects creating entirely new facilities (or new expansions/additions to existing facilities where a new structure and/or foundation are provided as part of the expansion/addition).

Modifications to an existing building just to accommodate a new expansion/addition will be considered new construction.

OFFEROR: The Contractor submitting the proposal as Offeror, including joint ventures, whose name appears in Block 14 of Standard Form (SF) 1442 (Solicitation, Offer and Award). In the event of a conflict or inconsistency between the Offeror's name cited on the SF 1442 and any other part of the proposal, the SF 1442 is the conclusive document in determining the Offeror that is submitting the proposal.

OFFEROR’S TEAM: The Offeror (see definition), the Offeror's outside Lead Design Firm, and/or in-house Lead Designer(s) only.

PAGE: One (1) printed side of a piece of paper (e.g., five (5) pieces of paper printed on both sides would result in 10 pages of narrative). Font size and font style shall be clearly legible.

PAST PERFORMANCE: How well an Offeror and Offeror’s Team has performed (e.g., the quality of work accomplished, schedule compliance, customer satisfaction).

PERFORMANCE CONFIDENCE ASSESSMENT: An evaluation of the likelihood (or Government’s confidence) that the Offeror will successfully perform the solicitation’s requirements; the evaluation is based upon past performance information.

PROJECT: A construction activity or task, with a single starting point and a single ending point.

QUALITY: The composite of material attributes including performance features and characteristics of a production or service to satisfy a customer’s given need.

RECENCY: As it pertains to past performance information, recency is a measure of the elapsed time since the past performance reference occurred. For purposes of the past performance factor, recency means the five-year period prior to the initial RFP issuance date, during which past performance references are considered relevant.

RELEVANCY: As it pertains to past performance information, relevancy is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the solicitation requirements; and a measure of the likelihood the past performance is an indicator of future performance.

RENOVATION AND REPAIR PROJECT TYPES: Projects where the work modifies existing structures.

Projects that only modify supporting facilities (including, but not limited to electrical, exterior utilities, sidewalks, roofing, HVAC repairs/replacements, and equipment replacements) will not be considered relevant.

REQUIREMENTS DOCUMENTS: All aspects of the RFP that convey the needs of the Government to offerors, including the Statement of Objectives (SOO), Statement of Work (SOW), Performance Work Statement (PWS), technical requirements documents, and system requirement documents.

REQUIREMENTS OWNER: The entity (for example, a program management office or other organization entity) responsible for providing requirements documents within the RFP that communicate those requirements to offerors.

RISK: As it pertains to source selection, risk is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance. (For firm- fixed price contracts, the reference to increased cost may be removed from the risk definition.)

SELF-PERFORMED: Performed relevant and major construction trade work in-house without subcontractors. This does not include project administration or management functions (such as quality control or safety program) and miscellaneous work (such as housekeeping or cleanup). Relevant and major construction trade work is that which is the same or similar to the work that may be ordered under this contract.

SIGNIFICANT STRENGTH: An aspect of an Offeror’s proposal with appreciable merit or will exceed specified performance or capability requirements to the considerable advantage of the Government during contract performance.

SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

STRENGTH: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

UNCERTAINTY: Is any aspect of a non-cost/price factor proposal for which the intent of the offer is unclear (e.g. more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).

WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.

3. RELATIVE IMPORTANCE OF THE EVALUATION FACTORS

The relative importance of the evaluation factors is as follows:

Proposal shall consist of Factors 1, 2, 3, 4, 5 and 6. Factors 1 (Technical Approach) and 5 (Small Business Participation will be rated as either Acceptable or Unacceptable. If an Offeror is rated Unacceptable for Factor(s) 1 and/or 5 they will not be eligible for award. In making the best value tradeoff award decision, only Factors 2 through 4 and price will be considered. Factor 2 (Experience) and 4 (Safety) are of equal importance, and when combined, are of equal importance to the performance confidence assessment, Factor 3 (Past Performance). The following combined non-price factors, 2 (Experience), 3 (Past Performance), and 4 (Safety) are significantly more important than price. An Unacceptable or No Confidence rating in any of the non-price factors will result in an overall rating of “Unacceptable” for the non-price factors, and ineligibility for award, unless corrected through discussions.

The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

According to FAR 15.304, the evaluation factors that apply to this acquisition are a part of this RFP and are evaluated individually. The applicable evaluation factors and submission requirements are identified below.

4. EVALUATION FACTORS

The evaluation factors for this procurement are:

Factor 1, Technical Approach Factor 2, Experience Factor 3, Past Performance Factor 4, Safety Factor 5, Small Business Participation Factor 6, Price - Based on Proposed Task Order 0001 (SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Pricing Schedule for PTO #0001; Bid Bond (in the amount of 20% of the proposal price for PTO #0001 or $3,000,000, whichever is less))

FACTOR 1: TECHNICAL APPROACH

a. Solicitation Submittal Requirements:

The composition and management of the firms proposed as the team for this contract will be evaluated in this factor.

(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a technical approach narrative describing the proposed primary construction firm(s) and primary design firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The technical approach narrative (Exhibit “A”) shall be limited to one (1) double-sided page (or two (2) single-sided pages), excluding the organizational chart.

The information requested in item (2) below is not included in this page limitation.

(2) In addition to the narrative, the Offeror shall submit a signed copy of any joint venture agreement, partnership agreement, teaming agreement, SBA approved mentor-protégé agreement (MPA), or letter of commitment for each member of the Offeror’s Team identified above (e.g., joint venture member, partner, team member, first-tier Small Business subcontractor, parent company, subsidiary, or other affiliated company, etc.). If the Offeror is proposing as a Mentor-Protégé joint venture, the Offeror shall submit the SBA approved mentor protégé joint venture agreement with the SBA approval letter of the mentor protégé agreement and any subsequent extensions.

b. Basis of Evaluation:

The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure, roles and responsibilities, and teaming relationships (if any) proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis. Failure to submit all required information for the solicitation shall be considered a deficiency and rated Unacceptable. If rated Unacceptable, the Offeror will be ineligible for award.

FACTOR 2: EXPERIENCE (See definition)

Submit Exhibit “B” (Construction Experience Project Data Sheet):

Submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrate your self-performed (see definition) experience on projects that are similar in size, scope, and complexity to the projects that may be ordered under this contract. For purposes of this evaluation, relevant projects are further defined as follows:

(1) Government or commercial airfield/airport paving projects of rigid or flexible pavement intended to support winged aircraft.

(2) Project must demonstrate self-performed (see definition) experience in construction of airport/airfield pavement.

(3) Project cost must be $500,000 or greater.

Examples of airfield/airport paving projects may include, but are not limited to: runway, taxiway, apron, and support areas for use by aircraft. Projects involving installation of only the subbase materials, crack repair, patching, overlays, seal coats, or non-pavement items will not be considered relevant. The relevant scope of work shall have been self-performed by the Offeror.

Additional minimum submission requirements:

(1) Submit at least two (2) relevant projects that demonstrate self-performed experience with a construction cost of $5,000,000 or greater.

(2) Submit at least one (1) relevant project that demonstrates self-performed experience in construction of rigid airfield pavement with a minimum of 10,000 cubic yards and a minimum thickness of eight (8) inches.

(3) Submit at least one (1) relevant project that demonstrates experience in construction with projects that involve flexible airfield pavement with a minimum of 5,000 tons.

Exhibit “B” must clearly address and fully explain how the project meets the above requirements.

Projects submitted for the Offeror shall be 100% complete (see definition) within the past five (5) years of the date of issuance of this RFP. Projects which are not 100% complete as of the date of issuance of this RFP shall not be considered.

A project is defined as a construction project with a single starting point and single ending point, performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (how the project meets the requirements listed above).

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the JV entity. If the JV does not have shared experience, projects shall be submitted for each of the Joint Venture members. If a project was performed by a JV, and not all members from that JV are members of the JV proposed for this contract, the Offeror shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract and shall not include work performed by the JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percentage of employees provided for the overall contract by the JV members as well as the overall percentage of work performed by the JV member. The Offeror shall also submit a SIGNED copy of the Joint Venture agreement indicating the proposed participation of each Joint Venture member. An SBA approved Mentor-Protégé Offeror shall submit the SBA approved Mentor Protégé agreement with the SBA approval letter of the Mentor Protégé agreement and any subsequent extensions.

In accordance with 13 C.F.R. 125.8(e), if the joint venture is an SBA approved Mentor-Protégé joint venture, the partners of the joint venture in aggregate must demonstrate the relevant project experience necessary to perform the contract. With the exception of firms formed under SBA approved Mentor- Protégé agreements, Joint Venture Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent/LLC/LTD firm will have meaningful involvement in the performance of this contract. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. Regarding any such submitted project, if the Offeror fails to demonstrate the affiliate/subsidiary/parent/LLC/LTD firm’s meaningful involvement in the performance of this contract, the project will not be considered relevant and will not be evaluated.

The Offeror may NOT utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor unless the following applies:

If a Small Business Offeror or Small Business JV (two small businesses forming a small business JV) cannot independently demonstrate its own experience, the Small Business Offeror or Small Business JV may utilize the experience of a first-tier Small Business subcontractor that will perform major or critical aspects of the requirement in order to demonstrate relevant construction experience under this evaluation factor. The Government will consider the submitted relevant experience of each first-tier Small Business subcontractor as the experience of the Small Business Offeror or Small Business JV, provided that:

1) The Small Business Offeror or Small Business JV submits a supporting partnership or teaming agreement for each first-tier Small Business subcontractor; and the Small Business Offeror or Small Business JV provides an explanation of the meaningful involvement that each first-tier Small Business subcontractor will have in performance of this contract on Exhibit A and B.

Regarding any such submitted project(s), if the Small Business Offeror or Small Business JV fails to include a supporting partnership or teaming agreement and/or fails to demonstrate the first-tier Small Business subcontractor’s meaningful involvement in the performance of this contract on Exhibits A and B, the project(s) will not be considered relevant and will not be evaluated. Small Business Offerors or Small Business JVs are still limited to a total of five (5) projects combined.

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction; any projects submitted in excess of the five (5) will not be considered.

Relevant projects that demonstrate that demonstrates self-performed experience in construction of both rigid airfield pavement with a minimum of 10,000 cubic yards and a minimum thickness of eight (8) inches, and flexible airfield pavement with a minimum of 5,000 tons may be rated higher.

Relevant projects that demonstrate self-performed experience with a construction cost of $10,000,000 or greater may be rated higher.

Relevant projects that demonstrate experience self-performing airfield paving construction of a Department of Defense airfield may be rated higher.

FACTOR 3: PAST PERFORMANCE

Submit Past Performance Questionnaires (Exhibit “C”) and CPARS evaluations immediately following each of the project data sheets to which they pertain.

If a Final CPARS evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. If there is not a Final CPARS evaluation, then a Past Performance Questionnaire (PPQ) (Exhibit “C”) should be provided. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information;

however, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. A PPQ will not be considered if a Final CPARS is available. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Britney Machado- Potestio at britney.l.machado-potestio.civ@us.navy.mil prior to the proposal closing date.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed one (1) double-sided pages (or two (2) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror.

Performance award or additional information submitted will not be considered.

This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through CPARS using all CAGE/UEI numbers of the Offeror’s Team, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.

Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive a Neutral Confidence rating.

Past performance ratings of “Substantial Confidence” or “Satisfactory Confidence” hold more value than a “Neutral Confidence” rating and will be considered more favorably in the evaluation of past performance.

A past performance rating of “No Confidence” will be ineligible for award.

FACTOR 4: SAFETY

Submit Exhibit “D” (Safety Data Sheet / Safety Narrative. Individual blocks on this form may be expanded.

The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .