This amendment modifies a solicitation for an indefinite delivery indefinite quantity multiple award construction contract for airfield and heavy duty paving projects. The Navy seeks to establish multiple IDIQ contracts for new construction, repair, and renovation projects at various government installations located in California, Arizona, Nevada, Utah, Colorado, and New Mexico. The amendment incorporates frequently asked questions into the solicitation, revises the evaluation factors for offeror team composition and management, and adds an offeror's team consent form. It also reposts the original solicitation in response to a request for information. Responses to the solicitation are due as specified in the amended solicitation dated September 27, 2023. Relevant construction specialties, pricing terms, and period of performance will be established under any resulting IDIQ contracts.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
27-Sep-2023
4. REQUISITION/PURCHASE REQ. NO.
ACQR5971123
5. PROJECT NO.(If applicable)
6. ISSUED BY CODE N62473 7. ADMINISTERED BY (If other than item 6) CODE
NAVFAC SOUTHWEST
PLANNING, DESIGN & CONSTRUCTION REGIONAL
CODE: PDCCORE
750 PACIFIC HIGHWAY
SAN DIEGO CA 92132-0001
See Item 6
8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
N6247323R0408
X 9B. DATED (SEE ITEM 11)
12-Sep-2023
10A. MOD. OF CONT RACT /ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILIT Y CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to incorporate attachments into the solicitation and respond to RFIs.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACT ING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
27-Sep-2023
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6247323R0408
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
AMENDMENT 0002– DATED SEPTEMBER 27, 2023
Solicitation: N62473-23-R-0408 CS/Email: Britney Machado-Potestio, britney.l.machado-potestio.civ@us.navy.mil Solicitation/RFP Date: September 12, 2023 Subject: INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)
UNRESTRICTED MULTIPLE AWARD CONSTRUCTION CONTRACT
(MACC) FOR NEW CONSTRUCTION, REPAIR AND RENOVATION OF
AIRFIELD PAVING AND HEAVY DUTY PAVING CONSTRUCTION
PROJECTS AT VARIOUS LOCATIONS WITHIN THE NAVAL
FACILITIES ENGINEERING COMMAND SOUTHWEST AREA OF
RESPONSIBILITY, INCLUDING BUT NOT LIMITED TO, CALIFORNIA,
ARIZONA, NEVADA, UTAH, COLORADO AND NEW MEXICO
This is an amendment to the subject solicitation. The purpose of this amendment is:
1. To ADD “MACC Frequently Asked Questions” to the solicitation, Attachment (1). (RFI #4)
2. To revise Section 00 21 16 Instruction to Proposers, Basis of Award and Evaluation Factors, paragraph 4.
EVALUATION FACTORS: (RFI #9)
FROM:
(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a technical approach narrative describing the proposed primary construction firm(s) and primary design firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The technical approach narrative (Exhibit “A”) shall be limited to one
(1) double-sided page (or two (2) single-sided pages), excluding the organizational chart. The information requested in item (2) below is not included in this page limitation.
TO:
(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a technical approach narrative describing the proposed primary construction firm(s) and primary design firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The technical approach narrative (Exhibit “A”) shall be limited to one (1) double-sided page (or two (2) single-sided pages), excluding the organizational chart. The information requested in item (2) below is not included in this page limitation.
N6247323R0408
3. To ADD “Offeror's Team Consent Form” to the solicitation, Attachment (2). (RFI #10)
4. To repost the original solicitation in response to RFI # 14, Attachment (3).
Attachments:
(1) MACC Frequently Asked Questions_Amendment 0002
(2) Offeror's Team Consent Form_Amendment 0002
(3) Solicitation_N6247323R0408_Airfield Paving MACC_Amendment 0002
(End of Summary of Changes)
File details come from the government source that posted it. Updated .