This solicitation is for an indefinite delivery indefinite quantity (IDIQ) multiple award construction contract (MACC) to provide new construction, repair, and renovation of airfield paving and heavy duty paving projects at various government installations located within the Naval Facilities Engineering Command. The solicitation seeks to award multiple IDIQ contracts for a one year base period and four one-year options. Work will involve tasks such as replacing deteriorated airfield pavement, earthwork, demolition, and incidental related activities. The Naval Facilities Engineering Command will issue individual task orders against the IDIQ contracts. Pricing will be on a firm fixed price basis for each task order. Responses are due within 30 days and awards will be made based on the criteria in the original MACC RFP. The Department of the Navy is the contracting agency.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ AIRFIELD PAVING MULTIPLE AWARD CONTRACT CONSTRUCTION (MACC)
SCOPE OF WORK AND GENERAL CONDITIONS
N62473-23-R-0408, PTO 0001,
REPAIR FLIGHTLINE APRON AT NAVAL AIR STATION POINT MUGU,
NAVAL BASE VENTURA COUNTY, CA
ATTACHMENTS:
A. Wage Determination B. Repair Flightline Apron Final Specification 06.12.23 C. Repair Flightline Apron Planset 06.12.23
1. DESCRIPTION OF WORK
The work includes: Replace deteriorated airfield apron pavement to serviceable condition for air operations. The airfield pavement work primarily consists of Portland cement concrete (PCC) reconstruction. Minor AC replacement will also occur. Existing utility lines and structures shall be protected in place. Work shall include earthwork, demolition and all other incidental related activities. All work shall be complete and ready to use as required by the specifications and drawings provided in this Request for Proposal (RFP).
2. LOCATION
The work is located at Naval Base Ventura County, California as indicated.
3. RFP- TECHNICAL PACKAGE
This RFP includes the following technical documents:
SPECIFICATIONS:
Attachment B: Repair Flightline Apron Final Specification 06.12.23
DRAWINGS:
Attachment C: Repair Flightline Apron Planset 06.12.23
4. INQUIRIES
All inquiries concerning this task order shall be made to Britney Machado-Potestio at (619) 705-4665 or britney.l.machado-potestio.civ@us.navy.mil. The Government does not intend to respond to inquiries submitted less than 10 days before the proposal due date.
5. SITE VISITATION
No site visit is scheduled for this task order.
6. NOTICE TO PROPOSERS
Under the items furnished on Standard Form 1442 (Solicitation, Offer, and Award) the offeror shall state the price for each item given hereinafter as a fixed price lump sum on CLIN 0002 of the SF 1442 (Enclosure 1).
CLIN 0002 (PTO #0001) shall be the entire work complete in accordance with the drawings and specifications, but not including work indicated or specified to be provided under any of the other items.
7. INFORMATION CONCERNING COST LIMITATIONS
The Magnitude of Construction for CLIN 0002 (PTO #0001) is between $10,000,000 and $25,000,000.
8. BASIS OF AWARD
The Basis of Award is specified in the MACC RFP.
9. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
In accordance with FAR clause 52.211-10 “Commencement, Prosecution, and Completion of Work (Apr 1984),” the Contractor shall be required to:
(a) commence work under the contract within 15 calendar days after the date the contractor receives notice of award,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 380 calendar days after the required commencement of work.
The time slated for completion shall include final cleanup of the premises.
10. LIQUIDATED DAMAGES
In accordance with FAR clause 52.211-12 “Liquidated Damages -- Construction (Sept 2000),” the following applies:
(a) If the Contractor fails to complete the work within the time specified in the task order, or any extension, the Contractor shall pay to the Government as liquidated damages, the sum of $7,000.00 for each day of delay.
(b) If the Government terminates the Contractor's right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work together with any increased costs occasioned the Government in completing the work.
(c) If the Government does not terminate the Contractor's right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted.
11. WAGE RATE REQUIREMENTS
The minimum wages, required to be paid for work under this task order, are in accordance with U.S.
Department of Labor, General Decision No. CA20230015 Modification #11, dated 09/15/2023 and are hereby made part of this task order. The General Wage Decision can be found at the following website: www.sam.gov.
12. NOTICE OF BONDING REQUIREMENTS
Within 15 days after receipt of award of a task order, the bidder/offeror to whom the award is made shall furnish the bonds required by FAR clause 52.228-15.
Bidders/offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
(End of NAVFAC language)
13. EVIDENCE OF REQUIRED INSURANCE
Within fifteen days after award of this task order, the contractor(s) shall furnish the Administrative Contracting Officer a Certificate of Insurance as evidence of the existence of the following insurance coverage amounts not less than the amount specified below in accordance with FAR clause 52.228-5 “Insurance -- Work on a Government Installation (Jan 1997).”
COVERAGE:
a. Comprehensive General Liability: $500,000 per occurrence
b. Automobile Liability: $200,000 per person, $500,000 per occurrence for bodily injury; $20,000 per occurrence for property damage
c. Workmen’s Compensation: As required by Federal and State Worker’s compensation and occupational disease laws
d. Employer’s Liability Coverage: $100,000 except in states where worker’s compensation may not be written by private carriers
e. Others as required by state law
Above insurance coverages are to extend to contractor personnel operating Government owned equipment and vehicles.
The Certificate of Insurance shall provide for thirty (30) calendar days written notice to the Contracting Officer by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned FAR clause.
The Certificate of Insurance shall be submitted to the Administrative Contracting Officer listed in the award letter.
14. DEFINITIONS
Where “as shown,” “as indicated,” “as detailed,” or words of similar importance are used, it shall be understood that reference to the drawings accompanying this specification is made unless stated otherwise. Where “as directed,” “as required,” “as permitted,” “approved,” “acceptance,” or words of similar importance are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the Contracting Officer is intended unless stated otherwise. As used herein, “provided” shall be understood to mean “provided complete in place,” that is “furnished and installed.”
15. ORAL MODIFICATIONS / CHANGES
No oral statement or direction by any person other than the Contracting Officer or his/her representative, whether or not acting within the limits of his authority, or any other representative of the Government shall constitute a change order under the contract clause FAR 52.243-4 “Changes (Jun 2007),” nor in any manner or degree modify or otherwise affect the terms of this task order or entitle the Contractor to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.
16. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
The COR for the task order functions as the technical representative of the Contracting Officer in the administration of the task order, providing technical direction and discussion as necessary, with respect to the specifications or statement of work, and monitoring the performance of work under the task order.
The Contracting Officer hereby designates the following individual as COR for this Planned Task Order 0001:
Name: TBD Phone Number: TBD Email Address: TBD
The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the pricing, quantity, quality, place of performance, delivery schedule, or other terms and conditions of the task order, or to direct the accomplishment of efforts which would exceed the scope of the task order.
17. BUY AMERICAN PROVISIONS
The requirement contained herein is subject to FAR clause 52.225-11 “Buy American--Construction Materials under Trade Agreements (DEC 2022)” and provision 52.225-12 “Notice of Buy American Requirement--Construction Materials Under Trade Agreements (MAY 2014).”
18. CODES AND STANDARDS
The design and construction shall comply with all applicable federal, state and local codes, standards, regulations, and ordinances, except where specifically stated herein, including, but not limited to, the latest edition of applicable codes published by the following organizations:
a. ADADG – Americans with Disabilities Act Design Guide
b. ANSI – American National Standards Institute
c. ASTM – American Society of Testing and Materials
d. NEC – National Electric Code
e. NEMA – National Electrical Manufactures Association
f. NFPA – National Fire Protection Association
g. UL – Underwriter’s Laboratories
Additional code and regulation requirements are listed throughout the RFP.
19. CONTRACT PROVISIONS IN FULL TEXT
FAR 52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be [ ] DX rated order; [X] DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
FAR 52.222-23 -- NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade Goals for female participation for each trade 21.5% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from
Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Ventura County
(End of provision)
FAR 52.225-12 -- NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
FAR 52.228-1 -- BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
20. CONTRACT CLAUSES
All contract clauses in the Basic Contract by reference or full text remain in effect unless superseded by this task order.
THE FOLLOWING CLAUSES ARE INCORPORATED BY REFERENCE:
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021)
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)
52.222-38 Compliance with Veterans' Employment Reporting Requirements (FEB 2016)
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026
(JAN 2022)
52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022)
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Representation and Certifications (JUN 2020)
252.203-7000 Requirements Relating to Compensation of Former DoD Officials (SEP 2011)
252.204-7000 Disclosure of Information (OCT 2016)
252.204-7008 Compliance with Safeguarding Covered Defense Information Controls (OCT 2016)
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information (JAN 2023)
252.204-7012 Safeguarding Covered Defense Information And Cyber Incident Reporting (JAN 2023)
252.204-7016 Covered Defense Telecommunications Equipment or Services – Representations (DEC 2019)
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services – Representation (MAY 2021)
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
(JAN 2023)
252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten (JAN 2023)
252.225-7057 Preaward Disclosure of Individuals Who Work in the People’s Republic of China (AUG 2022)
252.225-7058 Post award Disclosure of Employment of Individuals Who Work in the People’s Republic of China (JAN 2023)
252.225–7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region– Certification (JUN 2023)
252.225–7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region (JUN 2023)
252.225-7061 Restriction on the Acquisition of Personal Protective Equipment and Certain Other Items from Non-Allied Foreign Nations (JAN 2023)
252.225-7055 Representation Regarding Business Operations with the Maduro Regime (MAY 2022)
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime (JAN 2023)
252.239-7098, Prohibition on Contracting to Maintain or Establish a Computer Network Unless Such Network is Designed to Block Access to Certain Websites - Representation (DEVIATION 2021-O0003) (APR 2021)
252.251-7000 Ordering From Government Supply Sources (AUG 2012)
THE FOLLOWING CLAUSES ARE INCORPORATED BY FULL TEXT:
FAR 52.204-2 -- SECURITY REQUIREMENTS (MAR 2021) - ALTERNATE II (APR 1984)
(a) This clause applies to the extent that this contract involves access to information classified "Confidential," "Secret," or "Top Secret."
(b) The Contractor shall comply with-
(1) The Security Agreement DD Form441), including the National Industrial Security Program Operating Manual (32 CFR part 117); and
(2) Any revisions to that manual, notice of which has been furnished to the Contractor.
(c) If, subsequent to the date of this contract, the security classification or security requirements under this contract are changed by the Government and if the changes cause an increase or decrease in security costs or otherwise affect any other term or condition of this contract, the contract shall be subject to an equitable adjustment as if the changes were directed under the Changes clause of this contract.
(d) The Contractor agrees to insert terms that conform substantially to the language of this clause, including this paragraph (d) but excluding any reference to the Changes clause of this contract, in all subcontracts under this contract that involve access to classified information.
(End of clause)
FAR 52.211-15 -- DEFENSE PRIORITY AND ALLOCATION REQUIREMENT (APR 2008)
This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
(End of clause)
FAR 52.222-54 -- EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply that is—
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products. Per 46 CFR 525.1 (c)(2), "bulk cargo" means cargo that is loaded and carried in bulk onboard ship without mark or count, in a loose unpackaged form, having homogenous characteristics. Bulk cargo loaded into intermodal equipment, except LASH or Seabee barges, is subject to mark and count and, therefore, ceases to be bulk cargo.
Employee assigned to the contract means an employee who was hired after November 6, 1986 (after November 27, 2009 in the Commonwealth of the Northern Mariana Islands), who is directly performing work, in the United States, under a contract that is required to include the clause prescribed at 22.1803. An employee is not considered to be directly performing work under a contract if the employee-
(1) Normally performs support work, such as indirect or overhead functions; and
(2) Does not perform any substantial duties applicable to the contract.
Subcontract means any contract, as defined in 2.101, entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.
Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime Contractor or another subcontractor.
United States, as defined in 8 U.S.C. 1101(a)(38), means the 50 States, the District of Columbia, Puerto Rico, Guam, the Commonwealth of the Northern Mariana Islands, and the U.S. Virgin Islands.
(b) Enrollment and verification requirements. (1) If the Contractor is not enrolled as a Federal Contractor in E- Verify at time of contract award, the Contractor shall-
(i) Enroll. Enroll as a Federal Contractor in the E-Verify program within 30 calendar days of contract award;
(ii) Verify all new employees. Within 90 calendar days of enrollment in the E-Verify program, begin to use E-Verify to initiate verification of employment eligibility of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); and
(iii) Verify employees assigned to the contract. For each employee assigned to the contract, initiate verification within 90 calendar days after date of enrollment or within 30 calendar days of the employee’s assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).
(2) If the Contractor is enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall use E-Verify to initiate verification of employment eligibility of-
(i) All new employees. (A) Enrolled 90 calendar days or more. The Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or
(B) Enrolled less than 90 calendar days. Within 90 calendar days after enrollment as a Federal Contractor in E- Verify, the Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or
(ii) Employees assigned to the contract. For each employee assigned to the contract, the Contractor shall initiate verification within 90 calendar days after date of contract award or within 30 days after assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).
(3) If the Contractor is an institution of higher education (as defined at 20 U.S.C. 1001(a)); a State or local government or the government of a Federally recognized Indian tribe; or a surety performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond, the Contractor may choose to verify only employees assigned to the contract, whether existing employees or new hires. The Contractor shall follow the applicable verification requirements at (b)(1) or (b)(2) respectively, except that any requirement for verification of new employees applies only to new employees assigned to the contract.
(4) Option to verify employment eligibility of all employees. The Contractor may elect to verify all existing employees hired after November 6, 1986 (after November 27, 2009, in the Commonwealth of the Northern Mariana Islands), rather than just those employees assigned to the contract. The Contractor shall initiate verification for each existing employee working in the United States who was hired after November 6, 1986 (after November 27, 2009, in the Commonwealth of the Northern Mariana Islands), within 180 calendar days of-
(i) Enrollment in the E-Verify program; or
(ii) Notification to E-Verify Operations of the Contractor’s decision to exercise this option, using the contact information provided in the E-Verify program Memorandum of Understanding (MOU).
(5) The Contractor shall comply, for the period of performance of this contract, with the requirements of the E- Verify program MOU.
(i) The Department of Homeland Security (DHS) or the Social Security Administration (SSA) may terminate the Contractor’s MOU and deny access to the E-Verify system in accordance with the terms of the MOU. In such case, the Contractor will be referred to a suspension or debarment official.
(ii) During the period between termination of the MOU and a decision by the suspension or debarment official whether to suspend or debar, the Contractor is excused from its obligations under paragraph (b) of this clause. If the suspension or debarment official determines not to suspend or debar the Contractor, then the Contractor must reenroll in E-Verify.
(c) Web site. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: https://www.e-Verify.gov.
(d) Individuals previously verified. The Contractor is not required by this clause to perform additional employment verification using E-Verify for any employee-
(1) Whose employment eligibility was previously verified by the Contractor through the E-Verify program;
(2) Who has been granted and holds an active U.S. Government security clearance for access to confidential, secret, or top secret information in accordance with the National Industrial Security Program Operating Manual; or
(3) Who has undergone a completed background investigation and been issued credentials pursuant to Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors.
(e) Subcontracts. The Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for identification of the parties), in each subcontract that-
(1) Is for— (i) Services (except for commercial services that are part of the purchase of a COTS item (or an item that would be a COTS item, but for minor modifications), performed by the COTS provider, and are normally provided for that COTS item); or
(ii) Construction;
(2) Has a value of more than $3,500; and
(3) Includes work performed in the United States.
(End of clause)
FAR 52.223-2 -- AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless--
(1) The product cannot be acquired--
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)).
For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall--
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than--
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
FAR 52.223-9 -- ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause--
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall--
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to the Administrative Contracting Officer listed in the award letter.
FAR 52.223-15 -- ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (MAY 2020)
(a) Definition. As used in this clause—
Energy-efficient product
(1) Means a product that–
(i) Meets Department of Energy and Environmental Protection Agency criteria for use of the Energy Star trademark label; or
(ii) Is in the upper 25 percent of efficiency for all similar products as designated by the Department of Energy’s Federal Energy Management Program.
(2) The term “product” does not include any energy-consuming product or system designed or procured for combat or combat-related missions (42 U.S.C. 8259b).
(b) The Contractor shall ensure that energy-consuming products are energy efficient products (i.e., ENERGY STAR® products or FEMP-designated products) at the time of contract award, for products that are—
(1) Delivered;
(2) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(3) Furnished by the Contractor for use by the Government; or
(4) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.
(c) The requirements of paragraph (b) apply to the Contractor (including any subcontractor) unless—
(1) The energy-consuming product is not listed in the ENERGY STAR® Program or FEMP; or
(2) Otherwise approved in writing by the Contracting Officer.
(d) Information about these products is available for—
(1) ENERGY STAR® at http://www.energystar.gov/products; and
(2) FEMP at https://www.energy.gov/eere/femp/energy-efficient-products-and-energy-saving-technologies.
FAR 52.225-11 -- BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS
(DEC 2022)
(a) Definitions. As used in this clause—
Caribbean Basin country construction material means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C.40102(4), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if—
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029.
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Free Trade Agreement country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
Least developed country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C.1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction material, excluding COTS fasteners. (See FAR 12.505(a)(2)).
In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.
(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
None
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(4)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components. (1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(4)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction Material Description Unit of Measure Quantity Price (Dollars)* Item1
Foreign construction material
Domestic construction material
Item1
Foreign construction material
Domestic construction material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[ List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. ]
[ Include other applicable supporting information. ]
(End of clause)
FAR 52.228-5 -- INSURANCE--WORK ON A GOVERNMENT INSTALLATION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .