Amendment 0007_11.15.2023.pdf
PDF 149 KB Posted
- Solicitation number
- N62473-23-R-0408
About this file
This amendment modifies a solicitation for an indefinite delivery indefinite quantity multiple award construction contract. The Navy seeks to establish multiple IDIQ contracts for new construction, repair, and renovation of airfield paving and heavy duty paving projects at various government installations located within the Naval Facilities Engineering Command Southwest area of responsibility, including locations in California, Arizona, Nevada, Utah, Colorado, and New Mexico.
The purpose of this amendment is to revise the instructions to proposers by removing the page limit for the technical approach narrative in Exhibit A, which describes the proposed primary construction firm(s) and the rationale for the team composition. The amendment also responds to request for information questions submitted by interested offerors. The solicitation release date was September 12, 2023, with proposals due by November 15, 2023 as amended.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5971123
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate attachments into the solicitation and respond to RFIs.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Nov-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247323R0408
X 9B. DATED (SEE ITEM 11)
12-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Nov-2023
CODE
NAVFAC SOUTHWEST
PLANNING, DESIGN & CONSTRUCTION REGIONAL
CODE: PDCCORE
750 PACIFIC HIGHWAY
SAN DIEGO CA 92132-0001
N62473 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247323R0408
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY CHANGES (REVISED)
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0007
AMENDMENT 0007 – DATED NOVEMBER 15, 2023
Solicitation: N62473-23-R-0408 CS/Email: Britney Machado-Potestio, britney.l.machado-potestio.civ@us.navy.mil Solicitation/RFP Date: September 12, 2023 Subject: INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)
UNRESTRICTED MULTIPLE AWARD CONSTRUCTION CONTRACT
(MACC) FOR NEW CONSTRUCTION, REPAIR AND RENOVATION OF
AIRFIELD PAVING AND HEAVY DUTY PAVING CONSTRUCTION
PROJECTS AT VARIOUS LOCATIONS WITHIN THE NAVAL
FACILITIES ENGINEERING COMMAND SOUTHWEST AREA OF
RESPONSIBILITY, INCLUDING BUT NOT LIMITED TO, CALIFORNIA,
ARIZONA, NEVADA, UTAH, COLORADO AND NEW MEXICO
This is an amendment to the subject RFP. The purpose of this amendment is:
1. To revise Section 00 21 16 Instruction to Proposers, Basis of Award and Evaluation Factors, paragraph 4.
EVALUATION FACTORS: (RFI #124)
FROM:
(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a technical approach narrative describing the proposed primary construction firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The technical approach narrative (Exhibit “A”) shall be limited to one (1) double-sided page (or two (2) single-sided pages), excluding the organizational chart. The information requested in item
(2) below is not included in this page limitation.
TO:
(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a technical approach narrative describing the proposed primary construction firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The technical approach narrative (Exhibit “A”) shall be limited to one (1) double-sided page (or two (2) single-sided pages). The information requested in item (2) below is not included in this page limitation.
N6247323R0408
Enclosures:
N/A
(End of Summary of Changes)
File details come from the government source that posted it. Updated .