This is a solicitation for base operations support services at Naval Air Weapons Station China Lake, California. The Navy is seeking to award a single contract to provide custodial, facilities management, pest control, waste management, vehicle fleet maintenance, and environmental services. The period of performance is one base year with four one-year options. Key services required include facilities investment and repair, custodial services, pest control, grounds maintenance, waste collection and recycling, and vehicle and equipment fleet management. The total contract value is estimated at $200 million over the five-year period. The solicitation includes pricing tables to be completed by offerors and requires submissions for corporate experience, technical approach, management plan, safety record, and past performance references. The response due date is December 3, 2018.
Amendment_0006.pdf
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62473-18-R-5011 Naval Air Weapons Station China Lake, Base Operation Support Services
Description of this amendment begins on page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 56
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247318R5011
X 9B. DATED (SEE ITEM 11)
02-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jan-2019
CODE
NAVFAC SOUTHWEST
PW CONTRACTS CORE - PPV
CODE RAQ10-PPV
1220 PACIFIC HWY
SAN DIEGO CA 92132-5190
N62473 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247318R5011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
The purpose of this amendment is to:
1. Respond to Requests for Information (RFIs)
2. Change the points of contact for this solicitation.
3. Revise Section M, which is provided below (see red color font).
4. Provide revised SCA and DBA Wage Determinations.
5. Provide revised Section J Annex 1002000 Supply Services, Section J 1502000 Facilities Investment, Section J 1503020 Pest Control, Section J 1503030 Refuse and Recycling, Section C 1700000 Base Support Vehicles and Equipment, and J-L-02 Recent, Relevant Experience of Firm Project Data Sheet.
6. Provide the revised Unpopulated Exhibit Lin Item Number (ELIN) Pricing Schedule dated 10 January 2019.
7. The proposal due date remains unchanged.
RFIs:
Question 199: D. EVALUATION FACTORS FOR AWARD, (2) Factor 2, Technical Approach, (1) Work to be Performed by Offeror Under the Basic Contract Paragraph: (2)(i)(1)] and (2)(ii)(4). Page 97 of 101. The FAR referenced in this paragraph outlining the “Work to be Performed by Offeror under the Basic Contract” defines “not more than 49% of subcontract work” as the subcontract work does not exceed 49% of the total contract value in accordance with FAR 52.219-14 Limitations on Subcontracting (Nov2011). FAR 52.219-4 (Nov-2011) and (Jan 2017) (referenced Page 19 of 101 of solicitation) are currently included in the Solicitation. (Reference 1). It appears the requirement of 49% of total contract value conflicts with FAR requirement identified in solicitation.
Would the government consider incorporating the newest addition to FAR 52.219-14 Class Deviation 2019-O0003 conflict with the verbiage associated? (Reference 2)
Reference 1 Limitations on Subcontracting (Jan 2017)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to--
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants; and
(3) Orders set aside for small business or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for --
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
Reference 2 Class Deviation 2019-O0003 (dtd 12/3/18)—Limitations on Subcontracting for Small Business. Effective immediately this deviation remains in effect until it is incorporated into the FAR and DFARS, or otherwise rescinded Insert the following clause in solicitations and contracts for supplies, services, and construction, if any portion of the requirement is to be set aside for small business and the contract amount is expected to exceed the simplified acquisition threshold. This includes multiple-award contracts when orders may be set aside for small business concerns, as described in 8.405-5 and 16.505(b)(2)(i)(F):
Limitations on Subcontracting (DEVIATION 2019-O0003)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. As used in this clause— “Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that has the same small business program status as that which qualified the prime contractor for the award and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. An example of a similarly situated entity is a first-tier subcontractor that is a HUBZone small business concern for a HUBZone set-aside or sole source award under the HUBZone Program.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants; and
(3) Orders set aside for small business or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Agreement. By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract in the case of a contract for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(2) Supplies (other than procurement from a non-manufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded.
(f) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph
(e) of this clause will be performed by the aggregate of the joint venture participants.
Response 199: The Government will be using the FAR and DFAR clauses that were in effect at the time of the posting of the solicitation.
Question 200: 1503010 C Custodial_Spec Item 3.1.2.6, Page 11 of 16: 1. Will the government provide manufacturer guidelines for each specific unique floor types? 2. Will the Contractor be notified of changes in flooring types prior to services being provided?
Response 200: The Contractor is responsible for identifying the various unique flooring types, and providing maintenance and care for the flooring types pursuant to the manufacturers specifications.
Question 201: 1503010 C Custodial_Spec Item 3.1.2, Page 9 of 16: 1. Define furniture in terms of weight and sizes the Contractor is required to move. 2. Will the government provide manufacturing recommendations for unique floor types? 3. Will the Contractor be notified of flooring changes prior to providing services?
Response 201: Furniture will be of typical office furniture that is easily moved, such as chairs, waste containers, carpet chair mats, etc. The Government will not provide manufacturer recommendations for unique floor types. The Contractor is expected to obtain and service to manufacturer recommendations.
Question 202: 1503010 C Custodial_Spec Item 3.1.3.1, Page 12 of 16: For equipment not to be used in areas outside of the restroom, is equipment defined as the entire piece of Equipment such as an extractor or disposable parts such as brushes and pads? Will the government provide manufacturing recommendations for unique floor types? Will the Contractor be notified of flooring changes prior to providing services?
Response 202: Equipment defined as disposable items. Referring to not using the same disposable items to clean restrooms and office spaces. The Contractor is expected to obtain and service to manufacturer recommendations.
Question 203: 1503010 C Custodial_Spec Item Spec Item Spec Item Spec Item 3, Page 4 of 16: Unable to open attached Excel documents in J-1503010-04 to show buildings to be serviced.
Also unable to open the Facility Map Book as referenced in J-1503010-18.
Response 203: The originally embedded files have been separated from Attachment J and provided as: Custodial-04 1of2, Custodial-04 2of2, and Custodial-18 Facilities Map Book. See Amendment 0002 of this solicitation.
Question 204: 1700000 BSVE, Spec Item 3.1, Page 3: Are permits reimbursable? Is there historical data on how often oversized loads are transported on public highways? Is there historical data on how often oversized loads are transported on public highways?
Response 204: Permit fees are NOT cost reimbursable; all costs should be included in the Offeror's proposal.
Permits are issued on a yearly basis. Historical information for the frequency of oversized loads transported on public highways is not available.
Question 205: 1503010 C Custodial_Spec Item 2.3.1, Page 3 of 16: What testing is required for Medical Facilities and Childcare centers, and who administers these tests? Does the Contractor or government cover these costs?
Response 205: For custodians work in a Medical Facility, the Contractor shall comply with 29 CFR-1910.1030 at all times and Exposure Control Plan been established and accessible to employees. No tests administered. The Contractor is responsible for establishment of Exposure Control Plan to enforce in compliance of CFR-1910.1030.
Question 206: Facility Investment_Spec Item 3.5.3, Page 30 and 31 of 40: Is Contractor expected to shut down building air conditioning systems or does the reference to “Air Conditioning Systems” refer to a Chiller system only?
Response 206: Spec Item 3.5.3 of Facilities Investment annex refers to seasonal startup and shutdown of chiller systems only.
Question 207: 0200000 C Management and Administration, Spec Item 2.6.5, 12 of 38: Second paragraph states 7 calendar days’ notice, the third paragraph states 10 working days.
Please clarify.
Response 207: 10 working days will be recognized. Annex 0200000 Spec Item 2.6.5 has been revised accordingly.
See Amendment 0001 to the solicitation.
Question 208: 0700000 – Ordnance Operations, Spec Item 2.2.1, 4 of 21: Please provide a DD 254
Response 208: The DD254 will be addressed post award.
Question 209: 1502000 C Facilities, section 3.5.2, page 30 of 40. What ELIN in x003 are Other Recurring Service for Exhaust Hoods and Ducts staffed and priced associated with J-1502000-08? No specific ELIN is provided between x003BW thru x003CP. Will an ELIN be added?
Response 209: Revised ELIN schedule has been provided.
Question 210: 1502000 C Facilities, section 3.5.3, page 30 of 40. What ELIN in x003 are Other Recurring Service for Chiller Seasonal Start UP and Shut down to be staffed and priced? No specific ELIN is provided between x003BW thru x003CP. Will an ELIN be added? What Chillers are to be Shut Down and Started up? Will a « J Attachment be added with list of Chillers that require this support?
Response 210: Revised ELIN schedule has been provided.
Question 211: 1502000 C Facilities, section 3.5.4, page 31 of 40. What ELIN in x003 are Other Recurring Service for Chiller Water Testing and Treatment Services to be staffed and priced? No specific ELIN is provided between x003BW thru x003CP. Will an ELIN be added?
Response 211: Revised ELIN schedule has been provided.
Question 212: 1502000 C Facilities, section 3.5.5, page 32 of 40. What ELIN in x003 are Other Recurring Service for Boiler Seasonal Start up and shutdown to be staffed and priced? No specific ELIN is provided between x003BW thru x003CP. Will an ELIN be added?
Response 212: Revised ELIN schedule has been provided.
Question 213: 1502000 C Facilities, section 3.5.6, page 32 of 40. What ELIN in x003 are Other Recurring Service for Boiler Water Testing and Treatment Services to be staffed and priced? No specific ELIN is provided between x003BW thru x003CP. Will an ELIN be added? What is the associated J Attachment for this PWS Spec Item?
Will the reference be added to the PWS Spec Item and 1502000 J Document as needed?
Response 213: Revised ELIN schedule has been provided.
Question 214: The PWS attachments did not include requirements for pest control or ground maintenance operations. Are these functions no longer included in this effort? If they are, would the Government please send those sections so that the offeror can properly staff and supply material for those functions.
Response 214: These annexes were provided in Amendment 0001 to the solicitation.
Question 215: 1502000 J Facilities, Attachment 15020000-16, page 114 of 123. The following statement is listed on the page but none of the tables above show the quantity or frequency the work had been done historically « FEAD China Lake reserves the right to request pump–out/clean out service as needed.”
Will the Government provide this data or delete the reference to FEAD China Lake? Please Clarify If FEAD China Lake is kept, What ELIN is it associated with in ELIN Class x003?
Response 215: The Government reserves the right to request grease trap pump-out/clean services as needed, no more than 4 times a year. The government anticipates to request pump-out/clean services outside the scheduled times and execute by service order request as such in recurring work in ELINS.
Question 216: 1502000 J Facilities, Attachment 15020000-14, page 69 of 123. Boiler Plant 2 has two #2 Cleaver Brooks, is this correct or should one be deleted or renumbered? Please clarify.
Response 216: List should read as follows for serial numbers #1 T3755-1-3, #2 T3755-1-2, and #3 T5107-1-1.
Question 217: 1502000 J Facilities, Attachment 15020000-06, page 42 of 123. Will the Government add Workload to cover work for ELIN x003BC under PWS Spec 3.2.11 as there are no workload associated in J-1502000-06?
Response 217: Emergency generator line items are in revised ELINS. See attached unpopulated ELIN schedule.
Question 218: 1502000 J Facilities, Attachment 15020000-08, page 52 of 123. Will the Government add ELINS to cover work under PWS Spec 3.4.7 for Exhaust Hood and Vent as there are no ELNS for NEX or EOD in J-1502000- 08 ?
Response 218: Exhaust Hoods and Duct are in revised ELINS under Inspection, Testing, & Certification; and Other Recurring Services. The fire alarm suppression systems are nonrecurring work only.
Question 219: 1503030 J Integrated Solid Waste Management, Attachment 1503030-03, page 5 of 22. Will the Government provide ELINS for DRMO, FEAD and VX-9 as currently none are provided in ELIN Class x006?
IF not will this attachment be updated and percentages adjusted ?
Response 219: FEAD gets paid by NAVFAC, VX-9 by Region, DRMO is longer has refuse collection requirements.
Question 220: Attachment 1503020-10 para b, page 55 of 88. States that average inspection per facility is 2 per year. How can this be as equal number is only done once a year and none are done more than twice a year?
How did the Government come to this conclusion? Suggest this be deleted or the table below updated to justify the statement in Para b.
Response 220: The contactor is to perform inspections as per attachment 1503020-10. In this attachment "b. states the average number of pest control service performed at each facility is 2-per year" services would refer to pest control performed in addition to inspections. Not every inspection will constitute a need for Pest control services to be performed per the Integrated Pest Control Plan.
Question 221: 1503020 J Pest Control, Attachment 1503020-11, page 57 of 88. What is frequency for NAVAir – MRTFB buildings listed here? What does the 1st 2 columns mean? There is no explanation of the letters used there.
Response 221: 1. The work requirements for all of these areas will be accomplished via unscheduled service orders. Section J has been revised. 2. Refer to page 64 of 86 for Key Legend.
Question 222: Amendment 2, RFIs, Question and Answer # 33, page 3 of 13. Will the Government provide a copy of Navy OP 5 for our review?
Response 222: A copy of Navy OP 5 can be found via the following URL:
https://doni.documentservices.dla.mil/Directives/08000%20Ordnance%20Material%20Management%20and%20Su pport/08-00%20General%20Ordnance%20Material%20Support/8020.14A%20W%20CH-1.PDF
Question 223: Amendment 2, RFIs, Question and Answer # 72, page 9 of 13. Will the Government provide data for ELIN x008AA as it did for ELIN x008AB thru x008AG? Request workload for the NAVAIR part, as other Funding agencies have provided workload.
Response 223: Funding source for Airfield (Runway) Sweeping and Snow Removal is REGION's responsibility and listed as such in ELINS.
Question 224: Amendment 2, RFIs, Question and Answer # 93, page 11 of 13. When will exhaust hoods and duct fire suppression systems be added to the ELINs? Will it be in Amend 3, and if so, when is Amend 3 expected to come out?
Response 224: See RFI response 218.
Question 225: Amendment 2, RFIs, Question and Answer # 99, 101, 102 and 103, page 13 of 13. The current copy of J-0200000-11 Unpopulated ELINs posted with Amendment 2, does not now have a tab for Non-Recurring ELINs. Will this be added back in? Please clarify since the answer says there is a TAB.
Response 225: Nonrecurring base year tab line items are samples of work requirements and listed for reference purposes only. This has been added back to the ELIN schedule.
Question 226: Amendment 2, Custodial -02 2 0f 2, Summary Page. The government is providing workload for VX- 9, DRMO and MRTFB. Currently in J-0200000-11 Unpopulated ELINS there are no corresponding ELINS for these 3 activities. Which ELIN are they to price against or will the Government add ELINs in the next Amendment to they can be staffed and priced?
Response 226: See RFI response 225.
Question 227: Amendment 3, RFIs, Question and Answer # 105, page 2 of 22. Will the government provide the rest of the data requested, I.E. Manufacture, Model No, Serial No, and Year?
Response 227: This information is not available. The average capacity is 100 pounds.
Question 228: RFP, (3) Factor 3, Management Approach, page 98. (9) Contractor Furnished Property: Offerors shall identify equipment, materials, vehicles and facilities that are considered necessary for performance of this contract that are not Government Furnished. Offeror shall provide a table showing this information broken down by
Annex, and indicate if equipment is a new purchase, owned but used, or leased/rented by the offeror; Question:
Please clarify what is meant by materials.
Response 228: Contracts responsible for response/action. Materials can be gasoline to operate Contractor owned vehicles and equipment, for example.
Question 229: Pest Control, Spec 1.1, Page 2 of 13. Under Vertebrate pests, lists “other nuisance mammals”. Please define.
Response 229: Nuisance mammals are any mammal, excluding humans, that adversely affect the readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.
Question 230: Environmental, Attachment J-1800000-06 - Bulk Liquid Pumping – SWPL Tanks, page 21 of 27.
What type of waste is to be included in the management of up to 12,100 pounds of IWW Is it oily, flammable, etc.? Should the cost be included in A010AA?
Response 230: Waste is trace spent solvents and energetics in water F002 and F005 Non explosive. Cost will be
ELIN A010AA.
Question 231: Environmental, Attachment J-1800000-07, page 27 of 27. What is the waste code/classification (i.e.
RCRA waste code and / or DOT Hazard classification) of the materials within this requirement? What is the max capacity of each type of item, i.e., no more than 10% flammable, etc.?
Response 231: Resource Conservation and Recovery Act (RCRA) Generate F, P, and U waste code no K codes.
Various amounts and mixtures from R&D activities.
Question 232: RFP, (3) Factor 3, Management Approach, page 98. (9) Contractor Furnished Property: Offerors shall identify equipment, materials, vehicles and facilities that are considered necessary for performance of this contract that are not Government Furnished. Offeror shall provide a table showing this information broken down by Annex, and indicate if equipment is a new purchase, owned but used, or leased/rented by the offeror; Question:
Please clarify what is meant by materials.
Response 232: Materials are goods used or consumed in the performance of services/ work described in this contract. Goods may include raw materials and non-equipment tools that assist in the performance of specific services (i.e. fuel, cleaning supplies, etc.)
Question 233: 1502000 J Facilities, Attachment 15020000-11, page 65 of 123. Will the Government break out the table by Funding Activity (NAFAC, NAVAIR, REGION, & EOD) so this can be correctly staffed and priced?
Response 233: See revised Attachment 15020000-11.
Question 234: 17000000 C BSVE, Para 3.2.1, page 13 of 28. Will the « Informational Note » be updated with the correct J Reference?
Response 234: See attached revised Section C 1700000.
Question 235: 1002000J Supply, paragraph J-1002000-04 VX-9 Historical Cleaning Quantities, page 6 of 11.
There is blank table inserted, is this supposed to be populated? If so will the information be provided? If not will it be deleted?
Response 235: See revised Section J 102000.
Question 236: 1002000J Supply, paragraph J-1002000-04 VX-9 Historical Cleaning Quantities, page 6 of 11.
There is blank table inserted, is this supposed to be populated? If so will the information be provided? If not will it be deleted?
Response 236: See RFI response 235.
Question 237: Section of the Request for Proposal: N6247318R50110003J-0200000- 11_UNPOPULATED_ELINS_dated_30_NOV_2018 (1) and Refuse Attachment J 1503030-03. Notice to Contractors. Page 5. Notice to Contractors on Page 5 states, “when completing the ELIN cost breakout, overall costs for this Annex will need to be divided based on the following historical percentages...”
ELIN pricing sheet commands do not match historical table. Pricing requests NMC-Ordnance, NCIS, EOD, and Naval Construction Group, whereas Annex requests DRMO, NEX, FEAD, and VX-9. Please clarify.
Response 237: Attached revised 1503030 J Refuse and Recycling r1a.docx shows corrected Command Sponsor percentages.
Question 238: Section of the Request for Proposal: N6247318R50110003J-0200000- 11_UNPOPULATED_ELINS_dated_30_NOV_2018 (1) and Custodial data spreadsheets. Custodial Sheets reference square footage for MRTFB, VX-9, and DRMO however there are no ELINs to price the square footage.
Please clarify.
Response 238: Revised ELINS shows these activities. For base year, Item numbers 93 for DRMO; likewise, 94 for VX-9, and 95 for MRTFB.
Question 239: File: N62473/N6247318R5011000J-0200000-11 UNPOPULATED ELINS dated 30 Nov 2018 Price line for Total Recurring Work does not include all ELINS for each contract year: For example, Cell A6, Base Year ELINS shows only “ELINS A001”; however, it is our assumption all ELINS should be included (X001 to X009).
Will the Summary Tab be updated to include all ELINS for the Total Recurring Work in each contract year?
Response 239: All ELINS included all annexes. For example, for base year, A001AA to A010AF, for last option period 8 (6-month), J001AA to J010AF. NAWSCL consists of 10 major annexes. Total dollar amount for each contract period for recurring work should be linked by Offeror to the Summary Tab, for example, cell C6 for base year, cell C11 for first option period, and so on for ensuing option periods.
Question 240: Section L, 11 of 22 and 18 or 22, Amendment 3, In Section L it states, “(g) In order to maximize efficiency and minimize the time for proposal evaluation, it is required that the Offeror submit their proposal in accordance with the format and content specified. The electronic proposal shall be prepared so that if an evaluator prints the proposal it meets the following format requirements: 8.5 x 11 inch paper; single-spaced typed lines;
graphics or pictures not allowed; 1 inch margins, 10 or 12-point font text, no hyperlinks; Microsoft Word software all files named with the file extension .doc. Supporting Cost Data may contain spreadsheets in Microsoft Excel software, with all files named with the file extension .xls. Only one Technical proposal file should be submitted. (4) Organization Chart: Offerors shall provide an organization chart of the home office and the office responsible for execution and administration of the contract performance requirements. Is the Organization Chart considered a graphic? If yes, please describe how to submit this chart.
Response 240: See Amendment 0001, Question and Response 14.
Question 241: Section M, paragraph c.2, page 13 of 22, Amendment 3. In Section M it states, “For purposes of this evaluation, a relevant project is further defined as projects or task orders that are a government or commercial contract/project or task order that were at least 51% performed by the offeror as the prime contractor, at least 50% complete within the last five (5) years prior to the RFP issuance date, On the J-L-02 it states, “Projects submitted shall have been completed within the last 5 years prior to the proposal due date.” Please clarify.
Response 241: Attachment J-L-02 has been revised (see red color font), and is provided as an attachment to this amendment.
This concludes all RFI responses.
Points of Contact:
The primary point of contact is changed from Jennifer Reece to Eley DeCuba. Eley can be contacted via e-mail at eley.decuba@navy.mil. The alternate point of contact is changed from Eley DeCuba to Amanda Jo. Amanda can be contact at amanda.jo@navy.mil.
SECTION M
A. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, cost/price and other factors considered.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(es). This assessment must provide the rationale for proceeding to award without discussions.
B. SAFETY EVALUATION
1. Per NFAS 15.304(d), solicitations utilizing source selection procedures for procurements within the 50 United States, the District of Columbia, and outlying areas shall contain a standard “Safety” technical evaluation factor. This factor shall be included as a stand-alone evaluation factor and not as a sub-factor or an element of the Past Performance evaluation factor. This action will result in the selection of contractors that have consistently demonstrated a commitment to safety and the ability to properly manage and implement safety procedures for themselves and all tiers of subcontractors under their purview.
2. The safety evaluation has three elements: Experience Modification Rate (EMR); Occupational Safety and Health Association (OSHA) Days Away from Work, Job Restriction, or Transfer (DART); and Technical Approach to Safety.
3. The three elements of safety identified above are not sub-factors. The evaluators should collectively consider all elements of safety when assigning an overall adjectival rating for this factor. The SSEB will need to make a qualitative determination of the rating for this factor, taking into account the risk ratings for EMR and DART and the subjective evaluation of the narrative.
4. Evaluators will not average the rating from the three previous complete calendar years (2015, 2016, and 2017) for the EMR and DART and should consider data trends.
C. PAST PERFORMANCE EVALUATION
1. The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. The recency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each offeror.
2. There are three aspects to the past performance evaluation: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information).
The first is to evaluate the recency of the offeror’s past performance. The second is to determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection. The third is to establish the overall quality of the offeror’s past performance. Recency is generally expressed as a time period during which past performance references are considered relevant, and is critical to establishing the relevancy of past performance information. In establishing what is relevant for the acquisition, consideration should be given to those aspects of an offeror’s contract history that would give the greatest ability to measure whether the offeror will satisfy the current procurement. Common aspects of relevancy include, but are not limited to, the following:
similarity of service/support, complexity, dollar value, contract type, use of key personnel (for services) and extent of subcontract/teaming. The past performance evaluation conducted in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts;
rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts.
For purposes of this evaluation, a relevant project is further defined as projects or task orders that are a government or commercial contract/project or task order that were at least 51% performed by the offeror as the prime contractor, at least 50% complete within the last five (5) years prior to the RFP issuance date, with an annual award value of $9 million or more, for services similar to the services described in the solicitation technical annexes:
1502000 Facilities Investment, 1503010 Custodial (Janitorial) Services, 1503020 Pest Control, 1503050 Grounds Maintenance and Landscaping, to include Xeriscaping, 1503060 Pavement Clearance (Street Sweeping/snow removal), and 1503030 Integrated Solid Waste Management.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or for whom information on past performance is so sparse that no meaningful past performance rating can be reasonable assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
3. The SSEB will review all past performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment. A separate quality assessment rating is not required;
rather, the past performance confidence assessment rating is based on the offeror’s overall record of recency, relevancy and quality of performance.
In the case of offerors for which there is no information on past contract performance or where past contract performance is not available, the offeror may not be evaluated favorably or unfavorably on the factor of past contract performance. In this case, the offeror’s past performance is unknown and assigned a confidence rating of “neutral.” Although the SSEB may not rate an offeror that lacks recent, relevant past performance favorably or unfavorably with regard to past performance, the SSAC may recommend and the SSA may determine, that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated selection criteria.
D. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-cost/price factors:
Factor 1 – Recent, Relevant Experience of the Firm Factor 2 – Technical Approach Factor 3 – Management Approach Factor 4 – Safety Factor 5 – Past Performance on Recent, Relevant Projects
The distinction between experience and past performance is experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-cost/price evaluation factors is the technical factors Factors 1, 2, 3 and 4 are of equal importance to each other and, when combined, are equal in importance to Factor 5the Past Performance evaluation/performance confidence assessment factor Factor 5 on recent, relevant projects. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-cost/price factors considered.
3. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price:
(1) Solicitation Submittal Requirements: The offeror shall complete and submit (in a sealed envelope) the following: Price proposal shall be submitted in separate binders from the Technical Proposal, and clearly marked “Volume 2 – Price Proposal.” Include a separate tab for each item shown below:
TAB #1: Cover Letter, and Standard Form (SF) 33 Solicitation, Offer and Award (offeror to complete blocks 12 through 18). Include Telephone Number, Fax Number, Email Address, Tax Identification Number (TIN), DUNs Number, and Cage Code on the SF 33, in block 15a. With regard to the price shown on the SF 33, only Contract Line Item Numbers (CLIN) 0001 through 0018 are to be completed.
TAB #2: Exhibit Line Item Number (ELIN) Pricing: Complete a paper copy of Exhibit Line Item Number (ELIN) Pricing, and an electronic version on a CD-ROM using Excel worksheets posted online at the following website: https://www.neco.navy.mil/ and/or http://www.fbo.gov. Electronic version must be compatible with Microsoft Office 2010. Leave all excel formulas in the spreadsheet.
TAB #3: Completed Exhibit D, “Financial Questionnaire” from banking institution.
TAB #4: If offeror is proposing as a joint venture and/or mentor-protégé, offeror shall provide a copy of the joint venture agreement and, if the joint venture is with a mentor-protégé, a copy of the relevant mentor-protégé agreement approved by the Small Business Administration.
TAB #5: Copy of the Online Representations and Certifications from the System for Award Management, at the following website: www.sam.gov, including all completed applicable sections of the FAR Clause 52.212-3, offeror Representations and Certifications – Commercial Items (Mar 2015).
(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). To ensure balanced pricing, the total proposed price per annex may be compared to the IGCE for that annex. For proposed prices for technical annexes that have a total value with a +/-30% or higher differential compared to the IGCE, the proposed prices for those technical annexes will may appear to be unreasonable.
Proposed prices for individual technical annexes that are determined to be statistical outliers may be considered unreasonable. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Non-cost/price Factors:
(1) Factor 1 Recent, Relevant Experience of the Firm:
(i) Solicitation Submittal Requirements: The offeror shall provide the following for evaluation under Tab #1 of the Technical Proposal Volume 1 on Exhibit “A” for each project. The attached offeror Recent, Relevant Experience of Firm Project Data Sheets, Exhibit A, is MANDATORY and SHALL be used to submit project information. The Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total page limit for each project data sheet shall not exceed three single-sided pages.
NOTE: Projects submitted under Factor 1 - Recent, Relevant Experience of the Firm must be the same projects submitted for Factor 5 - Past Performance on Recent, Relevant Projects.
(1) Submit a minimum of two (2) projects and a maximum of five (5) projects, performed by the offeror as the prime contractor that best describes your experience on projects that are similar in size, scope, and complexity to the solicited contract.
(2) Project experience is defined as a project performed under a single contract or task order. For multiple award contracts and Indefinite Delivery/Indefinite Quantity (IDIQ) type contracts, the contract as a whole shall not be submitted as a project; rather offeror shall submit the work performed under a task order project.
(3) For purposes of this evaluation, a relevant project is further defined as follows:
(i) A government or commercial contract/project or task order that was at least 51% self-performed by the offeror as the prime contractor. “Self-performed” is defined as the Offeror who performs relevant work that is the same or similar in size, scope and complexity of the work requirements in the solicitation, by in-house workforce and not by subcontractor(s). This does not include administrative or management functions.;
(ii) At least 50% complete within the last five (5) years prior to the proposal due solicitation issuance date;
(iii) A total annual award value of $9 million or more;
(iv) This BOS contract consists of 10 technical annexes. At a minimum, the offeror shall demonstrate experience in the following six technical annexes: 1502000 Facilities Investment, 1503010 Custodial (Janitorial) Services, 1503020 Pest Control, 1503050 Grounds Maintenance and Landscaping, to include Xeriscaping, 1503060 Pavement Clearance (Street Sweeping/snow removal), and 1503030 Integrated Solid Waste Management.
(4) The Government will not consider any project submitted for experience that was performed by a firm other than the offeror, except that if the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the JV entity. If the JV does not have shared experience, relevant projects shall be submitted for each JV member. Offerors are still limited to a total of five (5) projects;
(5) The Government will consider otherwise relevant projects that were performed by the offeror’s proposed key personnel; however, experience of proposed subcontractor employees, key or otherwise, will not be considered; and,
(6) The Government will consider otherwise relevant projects performed by parent or subsidiary companies, predecessor companies, or satellite offices (i.e. any office(s) of the offeror other than the one submitting the current proposal) of the offeror, provided the offeror’s proposal clearly explains how the offered experience will be effectively utilized in the performance of the solicited contract. Notwithstanding any of the foregoing, if it is unclear how experience gained under a particular project will be utilized in or benefit the performance of the proposed contract, that project experience may not be considered in the evaluation. The Government will not consider the experience of proposed subcontractors.
(7) Exhibit A, offeror Recent, Relevant Experience of Firm Project Data Sheets submitted that exceed the maximum, three single-sided page limit will be removed prior to evaluation. Project Data Sheets submitted that exceed the maximum five (5) projects allowed for consideration will be removed prior to evaluation.
Exhibit A, Project Data Sheets submitted for entire multiple award contracts and/or Indefinite Delivery/Indefinite Quantity (IDIQ) type contracts as a whole will be removed prior to evaluation. Exhibit A, Project Data Sheets submitted for projects that are not at least 50% complete within five (5) years prior to the proposal due solicitation issuance date will be removed prior to evaluation. Exhibit A, Project Data Sheets submitted for evaluation that are not for services similar to the services described in the solicitation technical annexes in paragraph three (3) above will be removed prior to evaluation.
(ii) Basis of Evaluation: The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing relevant projects as defined in the solicitation submittal requirements. The assessment of the offeror’s relevant experience will be used as a means of evaluating the ability of the offeror to successfully meet the requirements of the solicitation.
(1) In addition to the minimum requirements, offerors that demonstrate experience in all of the following technical annexes: 0700000 Ordnance, 1700000 Base Support Vehicles and Equipment Fleet Management and Maintenance, 1800000 Environmental Services, may be rated higher.
(2) Relevant projects where the offeror as a prime contractor self-performed at least 75% of the work (as defined by dollar value) may be rated higher.
(3) Projects submitted with an annual award value of $21 million or more (i.e. contract price), may be rated higher.
(4) Projects submitted with an annual award value (i.e. contract price) of less than $9 million will not be evaluated.
(5) Projects submitted using other than the mandatory Exhibit A, Project Data Sheets will not be evaluated.
(6) Information submitted that exceed the three-page limitation on the mandatory Exhibit A, Project Data Sheets will be removed and will not be evaluated.
(7) Offerors that fail to properly complete Exhibit A, Project Data Sheets and do not provide all requested data, a point of contact that is accessible, and a correct current phone number and email address, may be rated lower. (Note: the Government may contact references for the submitted projects to verify information presented in Exhibit A, Project Data Sheets).
(8) For JV offerors – Proposals that fail to provide relevant experience for the JV entity or relevant experience for each JV member will not be evaluated.
(2) Factor 2, Technical Approach:
(i) Solicitation Submittal Requirements: Offerors shall be prepared to perform maintenance, minor repairs, and support services for the requirements listed in the technical sections of the basic solicitation.
Submit a narrative describing each of the following under Tab #2 of the Technical Proposal Volume I:
(1) Work to be Performed by Offeror under the Basic Contract: Offerors shall identify the type of work that will be self-performed and work that will be performed by subcontract for each of the following solicitation technical annexes: Annex 0700000 Ordnance, Annex 1002000 Supply Services,…