This amendment modifies a solicitation for base operation support services at Naval Air Weapons Station China Lake, California. The services required include facilities investment, custodial, pest control, grounds maintenance, pavement clearance, solid waste, vehicle support, and environmental services. The amendment extends the proposal due date to January 17, 2019 and provides responses to industry questions, revised specifications and attachments, and an updated pricing schedule. The solicitation is for fixed-price contracts awarded by the Naval Facilities Engineering Command to provide recurring and non-recurring base operation support services at the installation.

Amendment_0005.pdf

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N62473-18-R-5011 Naval Air Weapons Station China Lake, Base Operation Support Services

Description of this amendment begins on page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Dec-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247318R5011

X 9B. DATED (SEE ITEM 11)

02-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Dec-2018

CODE

NAVFAC SOUTHWEST

PW CONTRACTS CORE - PPV

CODE RAQ10-PPV

1220 PACIFIC HWY

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247318R5011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to:

1. Extend the proposal due date.

2. Provide revised Section C Annex 1503050 – Grounds Maintenance and Landscaping and Annex 1800000 – Environmental. Please note that revisions are noted in red font.

3.Provide the following attachment: J-1502000-06 EMERGENCY STANDBY GENERATOR INVENTORY.

4. Provide the revised Unpopulated Exhibit Lin Item Number (ELIN) Pricing Schedule dated 20 December 2018.

5. Respond to Requests for Information (RFIs).

PROPOSAL DUE DATE:

The proposal due date has been extended with proposals due on 17 JAN 2019 at 1400 Pacific Standard Time. The RFI cutoff date will not be extended. The Government intends to provide all outstanding RFI responses no later than close of business on 10 JAN 2019.

RFIs:

Question 144: Unpopulated ELINs dated 30 Nov 2018, TAB : Enter Each Elin Price Here : Columns N-Q, Row 1, Column Headings in Row 1, Columns N to Q have been removed from the Amendment 0003 version of this file.

However, provided they will be added back, can it be assumed the Offeror may edit the columns to comply with their Company specific application of indirect rates, escalation and profit?

Response 144: Yes.

Question 145: 1700000 C BSVE, Spec. Item 3.2.3, pages 14 & 15. 3.2.3 States, “The Contractor shall operate the Governments fuel dispensing facility to ensure fuel, lubricating oil, air, and water are provided to all activity and tenant activity equipment during operating hours.” Then, under related information it states, “Ensure that the fuel station is manned during non-working hours when the automation is under repair.” In one case we man the fuel station during operating hours only and in the other case during non-working hours. Please clarify non-working hours’ responsibilities.

Response 145: Non-working hours’ responsibilities are in reference to when or if stations are under repair.

Contractor would need to provide temporary fueling during working and non-working hours because the requirement is to have fuel available 24 hours per day seven days per week. Also under related information this requirement should not exceed 15 days per year.

Question 146: 18000000 C Environmental, Spec. Item 2.3.1, page 3. The paragraph states, “Only laboratories that have appropriate credentials can perform testing. In the absence of certification requirements, laboratories must be accredited for each applicable test method by a nationally recognized laboratory accreditation body, an accrediting authority approved by the National Environmental Laboratory Accreditation Program (NELAP) or the American Association for Laboratory Accreditation (A2LA) operating in accordance with ISO/IEC 17011:2004.” 1. Please clarify, must the contractor use only a certified lab, even when highly accurate field tests exist which could be used by our technicians and inspectors (e.g. coliforms)? 2. Please identify what tests and analysis are required to be performed by certified labs

Response 146: 1. As stated in the requirements, only laboratories that have appropriate credentials or accredited for each applicable test method by a nationally recognized laboratory accreditation body can perform required testing.

2. For tests and analysis required to be performed -- refer to Section J of Environmental annex.

Question 147: Amendment 3, RFIs, Question and Answer # 112, page 3 of 22. 1.Will J Attachment 15020000-09 Para 4 ELIN Breakout be update to add in MRTFB? 2. Will the percentages be updated as currently to show all 3 funding areas? 3. Please confirm the linear feet for NAVAIR is 959,597 and not 46976?

Response 147: 1. MRTFB is funded by NAVAIR, therefore, included in NAVAIR's total linear feet. 2. Refer to #1 response above. No update is needed. 3. Refer to #1 response above. No update is needed. According to Attachment J-1502000-09 Page 62 of 122 Notice to Contractors NAVAIR total linear feet of 959,597 also included MRTFB.

Question 148: Amendment 3, RFIs, Question and Answer # 139 and 140, page 7 of 22. Other than the incumbent, all other bidders do not know which building belong to which Funding agency which gives the Incumbent an unfair advantage. We cannot develop our pricing unless the government identifies the workload for Janitorial Services by the funding Agencies. Request again the Workload be broken out by each Funding agency, I.E. NAVFAC, NAVAIR, REGION, BMC, DLA, NCIS, NEX, GEOTHERMAL and EOD? IF not this is ground for a protest since all other bidders do not have on site knowledge as the incumbent.

Response 148: See Excel file named "Custodial-04 2of2.xlsx", which identifies by building, room, SF, COL, floor surface type, as well as funding Commands. This file was previously provided as a separate attachment.

Question 149: Amendment 3, RFIs, Question and Answer # 114, page 3 of 22. Since these are new requirement and no history, will the Government provide a plug number of calls for each bidder to bid against since this is FFP contract? If not why not, how are we to price a new requirement without some information to go against?

Response 149: Attachment 1502000-03 is historical information. The number of service calls per discipline cannot be predicted to the exact number.

Question 150: Attachment J-1503050-04, page 3 of 6. Request square footage for buildings 20251, 20252, the Airfield magazine and Magazine 6. Square footage is not listed in J-1503050-08 or J-1503050-05.

Response 150: Magazine 6 square footage is 300,000 Airfield Magazines includes bldgs 20251,20252 at 118,500 square feet.

Question 151: Grounds, Attachment J-1503050-05, Tabs. There are 3 customer tabs listed but 5 customer tabs in the ELIN price submittal. Please clarify which buildings belong to which ELIN line items

Response 151: Tab labeled TENANTS include remaining three tenants MAD (Marine Aviation Detachment), Dispensary (BMC Branch Medical Clinic), and PW Compound (NAVFAC).

Question 152: Attachment 1503050-03, page 6 of 18. Under COL 3, the requirement is to provide annual pre-emergent weed control and fertilization. Does this only apply to Lawn Care or does this include Rock areas also? If yes, please provide the approximate square footage of rock to be maintained.

Response 152: The attachment referenced refers to lawn care, shrub, hedge and plant maintenance, and plant bed maintenance. If a rock area is within these areas, it would pertain to the appropriate COL levels listed.

Question 153: Attachment 1503050-03, page 8 of 18. Reference Shrub, Hedge and Plant Maintenance, trees in COL 1, 2, 3 and 4, in particular COL3. In COL 3, there is a requirement that trees are trimmed and maintained a maximum of twice annually for appearance purposes, etc. Is it the government’s expectation that all trees identified in J-1503050-06 be trimmed up to two times a year by a certified arborist? Or does the government expect that ALL trees on base be trimmed up to two times annually, as referenced in 3.1.8 Tree Maintenance?

Response 153: 3.1.8 Tree maintenance would include all trees at the appropriate COL level requirements 3.1.8.1 references the tree inventory for trimming and pruning with a certified arborist.

Question 154: Grounds, Attachment 1503050-03, page 5 of 18. Vegetation control and removal stated an annual requirement for COL 3 Improved Grounds – however 3.2.3 cites that historically quarterly grounds care has been sufficient to maintain vegetation control locations. Please advise.

Response 154: Attachment J-1503050-08 Operational Vegetation Control areas will require quarterly care as listed.

Question 155: Pavement Clearance, Spec Item 3, page 5 of 16. “Street Sweeping and magnetic sweeping operations shall be accomplished outside of peak working hours on the scheduled workdays”. Is it the government’s intention that work shall be performed only after hours (except as noted in 3.1.2 for the Airfield)? Is the contractor limited to only performing work after hours on work days or is the contractor able to perform work on the weekends?

Response 155: It is the Governments intent that work shall be performed as per spec item 3 outside of peak working hours on the scheduled workdays.

Question 156: Pest Control, Spec 3.1.3, Page 8 of 13. Termites are referenced in the spec and referred to J- 1503020-17 for requirements which lists 100% control within 30 days. Attachment J-1503020-05 (page 15 of 88) and J-1503020-06 (page 36 of 88) also reference termites. Please provide limits as they relate to termite control and financial liability for work performed under the Recurring workload. Will a task order be awarded for any work that require treatments like tenting?

Response 156: Termites are serviced as per the specifications. Control is stated within the specifications.

Question 157: BSVE, Spec. Item 3.1.4, page 11 of 28. “Contractor may be required to complete WHE service at up to 2 sites at the same time on any given day”. Please confirm that this requirement is performed by two complete and separate crane crews on the same day.

Response 157: Yes.

Question 158: BSVE, spec. item 3.3.1.4, page 23 of 28. “Repairs in excess of 16 estimated flat rate hours and $250 of total direct materials cost may be ordered under the non-recurring portion of the contract”. Please identify the vehicles this spec applies to.

Response 158: Navy owned B Pool Fleet.

Question 159: BSVE, Spec Item 3.3.1.8, page 24 of 28. Is the contractor required to purchase all of the parts and materials? Is the contractor required to use government computer for parts locator?

Response 159: 1. The Government is responsible for purchase of parts and material. Refer to Attachment J- 1700000-18 paragraph 7 for Contractor furnished material, equipment, and certification requirements. 2. Yes.

Question 160: BSVE, Attachment J – 1700000-06, 1700000-06. “All contractor furnished equipment must be on site and readily available”. Is it the government’s expectation that each item on this list will be available on site including a tow truck large enough to tow a fire truck?

Response 160: Yes.

Question 161: Management and administration, spec. item 2.8.1 Access to Installation, page 18. “All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS). Does this include the people who have security clearances or the appropriate NACI Investigation?

Response 161: Yes.

Question 162: Management and administration, 2.8, page 18. We do not see the level of clearance required, please provide DD254 or other document that provides level of clearance needed.

Response 162: Refer to 0200000 Spec Item 2.8.7 for Security Clearances requirements. DD254 can be accessed online.

Question 163: J-0200000-11 UNPOPULATED ELINS, ELIN A058AD, TABS ‘ENTER EACH ELIN PRICE HERE ‘, ‘SUMMARY’, ‘ELINS NONRECURRING BASE’. ELIN A058AD BSVE Bus Service (Regular Work Hours) states, “Provide bus service during regular work hours to support BSVE operations.” Is the bus government owned and Contractor operated?

Response 163: Yes, buses are government owned and Contractor operated.

Question 164: J-0200000-11 UNPOPULATED ELINS, ELIN A058AE, TABS ‘ENTER EACH ELIN PRICE HERE ‘, ‘SUMMARY’, ‘ELINS NONRECURRING BASE’. ELIN A058AE BSVE Bus Service (After Hours) states, Provide afterhours bus service to support BSVE operations during weekdays, weekends and holidays. 1. Is the bus government owned and Contractor operated?

Response 164: Yes.

Question 165: J-0200000-11 UNPOPULATED ELINS, ELIN A058AF, TABS ‘ENTER EACH ELIN PRICE HERE ‘, ‘SUMMARY’, ‘ELINS NONRECURRING BASE’. ELIN A058AF BSVE Unscheduled Bus Services without per diem states, “The government will provide 24 hours advance notice for unscheduled bus service without per diem.” 1. Is the bus government owned and Contractor operated?

Response 165: Yes.

Question 166: Section C – Annex 1800000 C Environmental, Spec. item 3.3.4.2, page 1 of 15. 3.3.4.2 Transportation of Discarded Waste Tires Specification is missing

Response 166: See revised Section C – Annex 1800000 C Environmental, Spec. item 3.3.4.2, Transfer of Discarded Waste Tires.

Question 167: Management and administration, 2.8.8 Access to Sensitive Unclassified Information, page 21. “The request shall be renewed annually or for the duration of the contract if less than one year.” Is it a requirement that the eQUIP process be completed yearly? Please clarify.

Response 167: Yes. See Annex 0200000, Spec Item 2.8.8.

Question 168: Facility Investment, Spec Item 3.2.11, page 19 of 40. The spec and the related attachment J- 1502000-06 list various fire/water pumps. The technical exhibit details the generator maintenance requirements, run time, load tests, etc., but does not provide maintenance requirements run up times, etc. for the pump engines, controls and related accessories. Is the fire/water pumps work specific only to the fire/water pump engines themselves?

Response 168: No it will be the same as the requirements for generators.

Question 169: Facility Investment, Attachment J – 1502000-11, page 65 of 123. Attachment does not define which customers are funding each line item. Please provide to correctly enter costs on ELIN spreadsheet.

Response 169: Portable toilets and hand wash rental and services are funded/allocated according to the following percentages: NAVFAC (NWCF) = 1%; NAVAIR=60%; REGION=9%; EOD=20%; and Naval Construction Group = 10%.

Question 170: Facility Investment, Attachment J – 1502000-16, page 112 of 123. Please provide the capacity of grease traps identified in attachment J-1502000-16

Response 170: Average capacity is 20 pounds and Contractor shall schedule grease trap cleaning service of every 8 weeks to clean and dispose of the waste in accordance with current UFC requirements, (UFC 3-240-03) this UFC supersedes MIL-HDBK-1138.

Question 171: Facility Investment, Section J – J-1502000-06, page 45 of 123. Attachment J-1502000-06 does not identify the type or size of generator/pump being maintained. Please provide.

Response 171: See separate attached file named Attachment J-1502000-06 Facilities Investment - Generator Types.pdf for a list with known generator types, note not all generators are known.

Question 172: Facility Investment, Attachment J – 1502000-06, 1502000-06. Please provide the type and size of generator(s) to be maintained.

Response 172: See RFI response 171.

Question 173: Section C – Annex 1503050 Grounds Maintenance and Landscaping, spec. item 2.3.2, page 3 of 16.

2.3.2 is identified Equipment Restrictions as in the Table of Contents.

2.3.2 is identified as Resource Efficiency Manager (REM) Person responsible for the water conservation at military facilities in the body of the text. Please clarify.

Response 173: Annex 1503050 C Table of Contents Spec Item 2.3.2 Should be labeled Resource Efficiency Manager (REM) and changed accordingly. See revised Annex 1503050 C (1503050 C Grounds Maintenance r1.docx).

Question 174: Section C – Annex 1503050 Grounds Maintenance and Landscaping, spec. item 2.3.3, page 3 of 16.

2.3.3 is identified as Safety in the Table of Contents. 2.3.3 is identified as Records and Reports in the body of the text. Please clarify.

Response 174: Annex 1503050 C Table of Contents Spec Item 2.3.2 Should be labeled Records and Reports, and changed accordingly. See revised Annex 1503050 C (1503050 C Grounds Maintenance r1.docx).

Question 175: Grounds, Spec Item 2.3.7.1, page 3 of 16. Will contractor have full access to the irrigation system and able to regulate the water?

Response 175: The contractor will have full access to irrigation and the ability to regulate water In compliance with Spec Item 2.3.7, water management and water conservation plan, the contractor may interface with the DGR and the Government’s Energy Program Manager to coordinate and implement energy efficient water conservation programs that reduce energy and water consumption. Should water restrictions become mandatory the DGR will set or impose irrigation limitations. Thereafter the Contractor is restricted from making any adjustments unless directed by the Government.

Question 176: Grounds, Spec Item 3.1.1, page 6 of 16. How does the government define a rich natural color?

Response 176: Well supplied with desirable qualities having a form or appearance found in nature

Question 177: Grounds, Spec Item 3.1.3, page 8 of 16. “The Contractor shall operate, maintain and repair the irrigation system starting at the first valve on the water service line to the main control valves and all automatic and manual irrigation systems that include valves, vacuum breakers, backflow preventers, pressure regulators, pressure pumps, flow meters, radio transmitters, irrigation controllers and all their components, including all CALSENSE components and all types of water emitting devices connected to the irrigation system. Please identify what CALSENSE Components consist of.

Response 177: CALSENSE components consist of all items that are required to make the CALSENSE system work such as but not limited to controllers, circuit boards, pressure regulators, pressure pumps, flow meters, radio transmitters.

Question 178: Grounds, Spec Item 3.1.3, page 8 of 16. Please provide an inventory of CALSENSE locations.

Response 178: Bldgs 00001, 00005, 00010, 00012,00016, 00017, 00033, 00054, 00451, 00500, 00663, 00670, 00671, 00874, 00880, 01091, 01384,01385,01400, 01403, 02187, 02242, 02243, 02244, 02298, 02308, 02334, 02349, 02492, 02601, 02644, 02733, 11010, 11030.

Question 179: Grounds, Spec Item 3.1.3, page 7 of 16. “The contractor shall operate, maintain and repair the irrigation system starting at the first valve on the water service line to the main control valves … etc”. Is the system controlled at each site or is there a main computer control system? If through a computer – does the government provide training?

Response 179: The irrigation systems can be controlled at each site and CALSENSE systems have a main control site. Training material will be available from the Government and CALSENSE representatives and website.

Question 180: Grounds, Spec Item 3.1.3, page 8 of 16. Will the government make available blueprints for the irrigation lines to include wiring and piping?

Response 180: There are limited blueprints available due to the age of irrigation systems, any that are available will be accessible.

Question 181: Grounds, Spec Item 3.1.3, page 8 of 16. Is control of the CALSENSE system independent on the base or does it require equipment and manufacturer participation? Will the government provide operations manuals for the system?

Response 181: 1. The CALSENSE system can work independently. 2. Government will provide operation manuals for the systems.

Question 182: Grounds, Spec Item 3.1.3, page 8 of 16. Is the contractor responsible for OEM repair parts for the CALSENSE system?

Response 182: Yes.

Question 183: Grounds, Spec. Items 3.1.6, page 10 of 16. Spec 3.1.5 states that the contractor is responsible for plant, shrub and hedge replacement up to $75 a plant not to exceed 30 plants annually, however it does not list this same language in 3.1.6 “Plant Maintenance”. Please clarify.

Response 183: Replacement if for shrubs and hedges covered in Spec Item 3.1.5.

Question 184: Grounds, Spec Item 3.1.8, page 10 of 16. “All Trees are included in Tree Maintenance”.

Approximately how many trees are on base? Is the contractor responsible for any tree on the base regardless of distance or size?

Response 184: Refer to Attachment J-1503050-06, which provides tree inventory and site map.

Question 185: Grounds, Spec Item 3.1.8, page 11 of 16. “Maintenance shall include: staking, adjustment of ties and supports, removal of stakes, maintaining water berms for existing plantings, fertilization, pruning for health and safety, etc. Per the language in 2.2.1 is a certified arborist required to perform this work? Approximately how many trees are on base? Is the contractor responsible for any tree on the base regardless of distance or size?

Response 185: 1. Pruning shall be accomplished by or under guidance of a certified arborist. 2. Attachment J- 1503050-06 provides tree inventory and site map. Certified Arborist is needed for tree trimming under attachment 1503050-06 Contractor is responsible for all tree sizes within the improved and semi improved grounds locations

Question 186: Grounds, Spec Item 3.1.9, page 11 of 16. Will the government provide the manufacturing guidelines for the specific type of turf that has been installed? What is the approximate square footage of turf?

Response 186: There is only a small square footage of artificial turf of approximately 500 s.f. best practices for maintenance should be used as there is no manufacture information regarding this turf.

Question 187: Grounds, Spec. Item 3.1.10, page 12 of 16. There is no COL specification for Xeriscape in J- 1503050-03 as indicated in the spec. Please provide standards and indicate whether weed control and pre-emergent are requirements for these areas.

Response 187: Weed control and pre-emergents are required within these areas.

Question 188: Grounds, Spec Item 3.1.10, page 12 of 16. What is the approximate square footage of rock to be maintained on the base?

Response 188: Attachment 1503050-05 square footage is covered under the ground cover column.

Question 189: Grounds, Spec Item 3, page 5 of 16. he CBA for this contract does not allow for seasonal/temporary employees, Will the Contractor be allowed to identify its own schedule of performance as long as the quarterly, bi-annually and annually requirements are met?

Response 189: The Contractor might be allowed to identify its own PM schedule provides schedule is pre-approved by DGR/FSCM.

Question 190: Grounds, Attachment J-1503050-04, page 4 of 6. Request square footage for PW Compound.

Square footage is not listed in J-1503050-08 or J-1503050-05

Response 190: Attachment J-1503050-05 square footage is covered under the Tenants tab PW Compound row.

Question 191: Grounds, Attachment J-1503050-04, page 5 of 6. Request square footage for Building 11510.

Square footage is not listed in J-1503050-08 or J-1503050-05

Response 191: Square footage for Building 11510 is listed in attachment J-1503050-05.

Question 192: RFP, Factor 1 Recent, Relevant Experience of the Firm, (5) Key Personnel, page 95. Discussion:

The Government will consider otherwise relevant projects that were performed by the offeror’s proposed key personnel; however, experience of proposed subcontractor employees, key or otherwise, will not be considered.

Question: (a) If the Offeror references the past experience of an individual being proposed as Key Personnel and that individual performed work on the same referenced relevant project submitted with this proposal, will the past experience of the Key Personnel and the referenced relevant project be counted as two separate relevant projects?

Response 192: No, it will be counted as one project.

Question 193: RFP, (1) Factor 1 Recent, Relevant Experience of the Firm, page 95. i) Solicitation Submittal Requirements: The offeror shall provide the following for evaluation under Tab #1 of the Technical Proposal Volume 1 on Exhibit “A” for each project. The attached offeror Recent, Relevant Experience of Firm Project Data Sheets, Exhibit A, is MANDATORY and SHALL be used to submit project information. The Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total page limit for each project data sheet shall not exceed three single-sided pages. Question: Is it allowable to remove instructions from the J-L-02 form in order to stay within the 3 page limit.

Response 193: No.

Question 194: J-L-02, paragraph 3.1.4, page 11 of 28. Block #8 requires Key Personnel to “describe their involvement in this project”.

Block #9 requires the Offeror to “provide a detailed explanation how this person will participate in this contract.”

Is it the Government’s intention to provide a discussion of personnel involvement (i.e., duties and responsibilities) within the page limitation of the J-L-02?

Response 194: Yes.

Question 195: RFP, (4) Factor 4 Safety, page 99. Is the J-L-05 only to be used to respond to this factor?

Response 195: Yes.

Question 196: Proposal Submission, Volume #1 – Technical Proposal, pages 90 and 94. On page 90 - (a) General:

Proposals submitted in response to the solicitation shall be formatted as follows and furnished in the number of copies stated herein. Firms shall submit proposals in paper format and via electronic format on editable CD-ROM.

CD’s shall be placed in binder sleeves in the 3-ring binder. However, on page 94 - it says TAB 2 of pricing should be in a CD as well. The submission for each Volume is stated as: one original and four hard copies; Does this mean a total of 10 binders and 10 CDs? Please clarify the number of submissions (originals, hard copies, binders and CDs).

Response 196: See Amendment 0003, page 10, Section L, paragraph 6(d)(c)(2)&(3).

Question 197: RFP, Factor 1 Recent, Relevant Experience of the Firm, (5) Key Personnel, page 95. Discussion:

The Government will consider otherwise relevant projects that were performed by the offeror’s proposed key personnel; however, experience of proposed subcontractor employees, key or otherwise, will not be considered.

Question: (a) Since form J-L-02 is designed specifically to capture information about a contract and not the work experience of Key Personnel, should Form J-L-02 be utilized for Key Personnel or is a narrative description and/or resume sufficient?

Response 197: Form J-L-02 shall be used.

Question 198: J-L-02 - Recent, Relevant Experiences of the Firm Project Data Sheet, Tab 1, Factor 1 – Recent, Relevant Experiences of the Firm. Volume #1 – Technical, page 91 of 101. Would the Government define “Total Annual Value”? Is it the average of the total annual values (Example: Base plus Option Year(s)) or annual value of each period of performance?

Response 198: Total Annual Value shall be the average of all periods of performance assuming a 12-month period of performance.