N6247022R0006 RKB Solicitation.pdf
PDF 1 MB Posted
- Solicitation number
- N62470-22-R-0006
About this file
This solicitation seeks proposals for base operations support services at the Russell Knox Building, a secure facility on Marine Corps Base Quantico in Virginia. Services include facility management, facilities investment, custodial services, pest control, waste management, grounds maintenance, pavement clearance, utilities management, electrical services, wastewater management, steam services, water services, and transportation. The contract term is one base year with up to nine one-year option periods, for a total potential contract term of 102 months. The contract type is an indefinite-delivery/indefinite-quantity firm-fixed-price contract. The maximum contract value is the total of all contract line item numbers. Proposals are due by 2:00 p.m. on September 30, 2022. The solicitation is set aside for eligible 8(a) firms. The North American Industry Classification System code is 561210 for facility support services.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 30 Sep 2022
X
A X B X C
D
EX
X G F 188 - 197
198 - 209 X H 210 - 213 barkley.k.brown@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 213
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N62470 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
BARKLEY K BROWN 757-322-4111
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3 4 - 16
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
17 - 139 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
140 - 141 142 - 144
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 145 - 146 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 147 - 149 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
150 - 186
PART II - CONTRACT CLAUSES
COMNAVFACSYSCOM
ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
11 Aug 2022
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6247022R0006
Section A - Solicitation/Contract Form
SECTION A
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (NAVFAC), ATLANTIC
6506 HAMPTON BLVD
NORFOLK, VIRGINIA 23508-1278
NAVFAC RFP NUMBER: N62470-22-R-0006
BASE OPERATIONS SUPPORT (BOS) SERVICES AT THE RUSSELL KNOX BUILDING ALONG WITH
THE DSS ANNEX AND PARKING GARAGE AT MARINE CORPS BASE, QUANTICO, VIRGINIA.
NOTICE: PROPOSALS ARE DUE BY 2:00 P.M. NORFOLK, VA LOCAL TIME ON 30 SEPTEMBER 2022
Proposal is to be submitted to office listed below:
Naval Facilities Engineering Systems Command (NAVFAC), Atlantic Attn: Barkley Brown, Code ACQ36 6506 Hampton Blvd, Mail Room Norfolk, Virginia 23508-1278
PRE-PROPOSAL CONFERENCE/SITE VISIT:
A pre-proposal conference will be held. The pre-proposal conference and/or site visit time and location will be issued via amendment.
All prospective Offerors are urged to attend this conference.
A.1 Contract Title
Base Operations Support (BOS) Services at the Russell Knox Building (RKB) along with the DSS Annex and Parking Garage at Marine Corps Base (MCB), Quantico, Virginia.
A.2 Type of Contract
This acquisition will result in the award of an Indefinite-Delivery/Indefinite Quantity (IDIQ) Firm-Fixed Priced (FFP), performance-based type contract for BOS Services at the Russell Knox Building, Virginia that is comprised of both Recurring Work and Non-Recurring Work items.
A.3 COMPETITION REQUIREMENTS/SET-ASIDE
This procurement is a 100% set aside for eligible 8(a) firms in accordance with FAR 19.805(a)(1). The Small Business Administration (SBA) Requirement Number is LC1640002643O.
A.4 NAICS CODE
The NAICS code assigned to this procurement is 561210, Facility Support Services, having a small business size standard of $41.5 million. Refer to Section K, Representations, Certifications and Other Statements of Offerors.
A.5 REQUEST FOR PROPOSAL (RFP) FILES
It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from Contract Opportunities (www.sam.gov.) Unprotected editable electronic file copies of the RFP documents, including Word, Excel, and/or Adobe files will not be provided. Please plan accordingly.
Section B - Supplies or Services and Prices
SECTION B
B.1 MAXIMUM NOT TO EXCEED (NTE) AND MINIMUM GUARANTEE
The maximum NTE value of an ordering period is the total of all the CLINs in that ordering period. The maximum or NTE value of the contract is the total value of all CLINs in the Schedule. Orders shall not be made that exceed the maximum NTE value for any ordering period. The maximum NTE value of an ordering period and of the contract may be increased by written modification to the contract in conjunction with any modification that increases the value of an existing task order that is authorized by a contract clause. Orders in excess of the estimated quantity set forth for any particular CLIN shall not be exceeded without the Contractor’s agreement which shall be indicated by signing or beginning performance of the order.
Concurrently with the award of the basic contract, the Government intends to issue a task order to obligate the contract minimum guarantee for:
CLIN 0001 Base Period Recurring work;
Minimum guarantees do not apply to the option periods.
B.2. CONTRACT TERM
This contract contains provisions for one base period of twelve (12) months and includes up to six (6) one-year option periods and three (3) six-month option periods, for a proposed total contract term, if all options are exercised, not-to-exceed 102 months. As such, the contract includes FAR Clause 52.217-8—OPTION TO EXTEND SERVICES (NOV 1999). The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, FAR Clause 52.217-9, OPTION TO EXTEND THE TERM OF THE CONTRACT
(MAR 2000).
B.3 CONTRACT LINE ITEMS, CONTRACT EXHIBIT LINE ITEMS AND SUBCLINS
a. Offerors shall enter unit prices and amounts for Contract Line Items (CLINs) and Exhibit line items (ELINs) as indicated in the schedules and any accompanying exhibits. ELIN unit prices must be rounded to two (2) decimal places only, and each ELIN extended total price must be calculated based on the rounded unit price. If an offeror does not round ELIN unit prices to two (2) decimal places, then the Government will round the prices to two (2) decimal places and the rounded prices will be used for evaluation purposes. All ELIN unit prices may not be less than $0.01. If an offeror proposes unit price less than $0.01 but higher than “$0.00,” then the Government will round the unit price to $0.01 and that rounded price and resultant extended total price will be used for evaluation purposes.
(It is highly recommended that Offerors use cell format “currency” in the electronic Microsoft Excel ELIN spreadsheet).
b. In the event there is a difference between the unit price and the extended total amount, the unit price will be held to be the intended offer and the extended total of the CLIN and ELIN will be recomputed to take into account the change in the contract CLIN/ELINS. If the offeror provides a total amount for an ELIN but fails to enter the unit price, the extended total amount divided by the ELIN quantity will be held to be the intended unit price; however, if this calculation results in a unit price requiring more than two decimal places, then the unit price will be rounded to two decimal places, and the extended total price will be recalculated in accordance with the preceding paragraph. If an Offeror does not have a value (i.e.: $-.--) or has $0.00 listed in both the unit price field and the extended total field for that ELIN(s) within the Attachment J-0200000-09, and a total evaluated price could not be determined by the Government for that ELIN(s) or CLIN(s) based on pricing submitted, then the Offeror’s price proposal will be determined to be unawardable. In the event there is a discrepancy between the hard copy Attachment J-0200000-09 and electronic copy of the J-0200000-09, the hard copy Attachment J-0200000-09 pricing will be held to be the intended offer.
c. The Schedule of Recurring work (CLINs 0001, 0003, 0005, 0007, 0009, 0011, 0013, 0015, 0017, and 0019), and the Schedule of Non-Recurring work (CLIN 0002, 0004, 0006, 0008, 0010, 0012, 0014, 0016, 0018, and 0020), will be used as the basis for deductions in accordance with the FAR Clause 52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996), Section E.
d. Informational SubCLINs will be incorporated at the time of award with appropriate funding/lines of accounting by customer. These SubCLINS represent funding for each CLIN by customer. The contractor shall not submit totals for SubCLINs.
B.4 INDEFINITE QUANTITY INDIVIDUAL CONTRACT LINE ITEM QUANTITIES
Once the estimated quantities for individual line items shown in the Schedule and any accompanying exhibits have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
B.5 FULLY LOADED PRICING
Prices provided shall be fully loaded and no other allocations, fees, overheads, G&A, insurance, taxes, profits or any other markups shall be applied when an option is exercised or a Task Order is issued. Costs for technical specifications 0100000– General Information and 0200000– Management and Administration shall be considered overhead; therefore, those annexes’ shall be allocated and included throughout the prices proposed for all other annexes.
B.6 GOVERNMENT PURCHASE CARD
Non-Recurring work may be ordered at the prices offered by two ways:
1) By the issuing activity using a DD Form 1155 “Order for Supplies and Services”; or
2) By an authorized Government user via a Government Purchase Card (GPC).
When receiving GPC orders against Section B/Exhibits, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
B.7 UNIT PRICE ADJUSTMENTS IN OPTION PERIODS
This solicitation incorporates the Service Contract Labor Standards Statute (SCLSS), formerly known as the Service Contract Act (SCA), Wage Determinations and applicable Construction Wage Rate Requirements Statute (CWRRS), formerly known as the Davis-Bacon Act (DBA), Wage Decisions. The Wages are incorporated for the Base Period of performance only. If the Option year is exercised, the most current SCLSS Wage Determinations and CWRRS Wage Decisions for that option year will be incorporated into the contract and the CLIN/ELIN prices will be adjusted in accordance with FAR Clause 52.222-43, Fair Labor Standards Act And Service Contract Labor Standards - Price Adjustment (Multiple Year And Option Contracts) (Aug 2018), for the SCLSS Wage Determinations and FAR Clause 52.222-32, Construction Wage Rate Requirements – Price Adjustment (Actual Method) (Aug 2018) for the CWRRS Wage Decisions. The Contractor warrants, by submission of his proposal, that the price does not include any contingency for future wage increases.
Collective Bargaining Agreement (CBA) with International Union of Operating Engineers Local 99, AFL-CIO, Service Contract Labor Standards wages and applicable Wage Rate Requirements (Construction) (formerly Davis- Bacon Act (DBA)), are included in this Solicitation. Refer to Section Attachment, J-5.
B.8 BIDDING UNIT PRICES FOR LABOR
a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be included in the Recurring Work Items portion or as a Unit Price Task in the Non-Recurring Work Items portion of the contract. Labor for this work will be ordered under the “NON-RECURRING WORK/UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)” clause in Section C and paid for based on unit prices for labor bid by the Contractor listed in the Schedule of Non-Recurring work.
b. Estimated hours in the Schedule are a forecast of future requirementsbut the actual need may vary a substantial amount due to unforeseen conditions and contingencies. The forecast is not a minimum guarantee of work. These estimated hours are for performing "Non-Recurring Work” accomplished in the time period shown.
c. The Contractor shall enter, in the unit price bid space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards). The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.
B.9 PHASE-IN AND PHASE-OUT
Pricing shall include applicable Phase-In and Phase-Out costs, Phase-In shall be for a period of up to but no more than 45 days and Phase-Out to be for a period of up to but no more than thirty (30) days. There is no separately priced CLIN for Phase-In and Phase-Out and such costs can be distributed however the offeror chooses. The Government recognizes that offerors may choose to front load these costs into the base year.
B.10 CONTRACT PRICE INFORMATION
For administrative purposes of the U.S. Government, the price of this contract and all subsequent task orders and modifications issued under this contract will be expressed in U.S. dollars. Payment will also be made in U.S.
dollars.
B.11 CONTRACTOR SUPPORT OF ELECTRONIC FACILITIES SUPPORT CONTRACTING (E-FSC)
The Contracting Officer authorizes the following to issue orders against this contract: NAVFAC Atlantic AOR.
This procurement allows for and the Government fully intends to use FedMall for issuing orders under the Non- Recurring Work portion of the contract. Refer to Section H-4, CONTRACTOR SUPPORT OF ELECTRONIC
CONTRACTING (DOD EMALL).
B.12 PRIOR CONTRACT INFORMATION
This requirement is currently being satisfied under contract N40080-16-D-0311 for Facility Support Services (FSS) which was awarded to NCS/EML Joint Venture, LLC., a joint venture between National Contracting Services, LLC and Electronic Metrology Laboratory, LLC.
This information is provided for informational purposes only. Prospective offerors are cautioned that they should not rely on this information to determine workload as there is no assurance that workload and volume of future effort and costs will replicate past experience.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Each
BASE YEAR RECURRING WORK
FFP
The total price for this CLIN represents the total Base Period (twelve months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): A001 through A009 FOB: Destination
NET AMT
0002 Each
BASE YEAR NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Base Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): A700 through A827
0003 Each
OPTION OPTION PERIOD ONE RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (twelve months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): B001 through B009
0004 Each
OPTION OPTION PERIOD ONE NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): B700 through B827
0005 Each
OPTION OPTION PERIOD TWO RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (twelve months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): C001 through C009
0006 Each
OPTION OPTION PERIOD TWO NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): C700 through C827
0007 Each
OPTION OPTION PERIOD THREE RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (twelve months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): D001 through D009
0008 Each
OPTION OPTION PERIOD THREE NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): D700 through D827
0009 Each
OPTION OPTION PERIOD FOUR RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (twelve months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): E001 through E009
0010 Each
OPTION OPTION PERIOD FOUR NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): E700 through E827
0011 Each
OPTION OPTION PERIOD FIVE RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (twelve months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): F001 through F009
0012 Each
OPTION OPTION PERIOD FIVE NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): F700 through F827
0013 Each
OPTION OPTION PERIOD SIX RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (twelve months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): G001 through G009
0014 Each
OPTION OPTION PERIOD SIX NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): G700 through G827
0015 Each
OPTION OPTION PERIOD SEVEN RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (six months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): H001 through H009
0016 Each
OPTION OPTION PERIOD SEVEN NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): H700 through H827
0017 Each
OPTION OPTION PERIOD EIGHT RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (six months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): J001 through J009
0018 Each
OPTION OPION PERIOD EIGHT NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): J700 through J827
0019 Each
OPTION OPTION PERIOD NINE RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period (six months) for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): K001 through K009
0020 Each
OPTION OPTION PERIOD NINE NON-RECURRING WORK
FFP
The total price for this CLIN represents the total Option Period for BOS Services at the Russel Knox Building along with the DSS Annex and Parking Garage for non-recurring work in accordance with the PWS and all applicable attachments.
Exhibit Line Item Numbers (ELINs): K700 through K827
Section C - Descriptions and Specifications
SECTION C
C.1 PERFORMANCE WORK STATEMENT
All terms and conditions of the contract award, performance work statement, and all attachments are applicable.
The requirements of the performance work statement (PWS) must be met. Listed below are the PWS annexes provided in Section C.
Annex Specification Title 01 0100000 General Information 02 0200000 Management and Administration
1501000 Facility Management 1502000 Facilities Investment 1503010 Custodial 1503020 Pest Control 1503030 Integrated Solid Waste Management (ISWM) 1503050 Grounds Maintenance and Landscaping 1503060 Pavement Clearance
1601000 Utility Management 1602000 Electrical 1604000 Wastewater 1605000 Steam 1606000 Water
17 1700000 Transportation 18 1800000 Environmental
C.2 REPORTING REQUIREMENTS
A detailed report allocating value of work/quantities performed by Contract Line Items CLINs)/Sub-Line Items (SLINs) identified in the schedule and any accompanying Exhibits with Exhibit Line Items (ELINs) is to be submitted monthly, including all Recurring Work and Non-Recurring Work items completed. The Contractor shall notify the Contracting Officer when 75% of any Non-Recurring Work Line Item (CLIN/SLIN/ELIN) is reached.
ANNEX 0100000
0100000 – General Information
Table of Content Spec Item Title 1 General Information
1.1 Outline of Services
1.2 Acquisition of Additional Work
1.3 Background Information
1.4 Navy PBSA Approach
1.5 Standard Template
1.6 Related Information
1.7 Verification of Workload and Conditions
1.8 Contractor's Knowledge
1.9 Technical Proposal Certification
Spec Item Title Description 1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at the Russell Knox Building Complex, Quantico Marine Corps Base, Quantico, Virginia, and outlying areas supported by this installation performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff – N/A Annex 4 Public Safety– N/A Annex 5 Air Operations– N/A Annex 6 Port Operations– N/A Annex 7 Ordnance– N/A Annex 8 Range Operations– N/A Annex 9 Health Care Support– N/A Annex 10 Supply– N/A Annex 11 Personnel Support– N/A Annex 12 Morale, Welfare and Recreation Support– N/A Annex 13 Galley– N/A Annex 14 Housing– N/A Annex 15 Facilities Support
• 15010000 – Facility Management
• 1502000 – Facility Investment
• 1503010 – Custodial
• 1503020 – Pest Control
• 1503030 – Integrated Solid Waste Management (ISWM)
• 1503050 – Grounds Maintenance and Landscaping
• 1503060 – Pavement Clearance
Annex 16 Utilities– N/A Annex 17 Transportation Annex 18 Environmental
1.2 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.3 Background Information Named after two pioneers in modern naval counterintelligence, the
718,000 square foot Russell-Knox Building, a high-securing, high-tech office and training facility, sits on a 129 acre site and houses five military criminal investigative and counterintelligence agencies (approx. 3,000 personnel).
1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.
The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.
Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.
1.6 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.7 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.
All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.
As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.8 Contractor's Knowledge The Navy expects to receive insightful management from its contractors.
This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.9 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
ANNEX 0200000
0200000 – Management and Administration
Table of Contents
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Directives, Instructions, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.4 Government-Furnished Items
2.4.1 Government-Furnished Property (GFP)
2.4.2 Government-Furnished Facilities
2.4.3 Government-Furnished Vehicles and Equipment
2.4.4 Government-Furnished Utilities
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Safeguarding Information
2.6.2 Dissemination of Information
2.6.3 Work Reception
2.6.4 Work Control
2.6.5 Work Schedule
2.6.6 Deliverables
2.6.7 Service Interruptions
2.6.8 RKB Computerized Maintenance Management System (CMMS)
2.6.9 Quality Management System (QMS)
2.6.9.1 Quality Management (QM) Plan
2.6.9.2 Quality Inspection and Surveillance
2.6.9.3 Quality Inspection and Surveillance Report
2.6.10 Property Management Plan
2.6.11 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.2.1 Quality Control Personnel
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Service Contract Reporting (SCR)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Access to Controlled Unclassified Information
2.8.9 Access to Government Information Technology (IT), Operating Technology (OT), and Facility
Related Control Systems (FRCS)
2.8.10 Employee Status
2.9 Contractor Safety Program
2.9.1 Contractor Safety Requirements
2.9.1.1 Experience Modification Rate (EMR)
2.9.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate
2.9.2 Accident Prevention Plan (APP)
2.9.3 Activity Hazard Analysis (AHA)
2.9.4 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.4.1 Abrasive Blasting Plan
2.9.4.2 Access/Haul Road Plan
2.9.4.3 Alcohol and Drug Abuse Prevention Plan
2.9.4.4 Asbestos Abatement Plan
2.9.4.5 Chemical Hazard Communication Program
2.9.4.6 Confined Space Program
2.9.4.7 Critical Lift Plan
2.9.4.8 Demolition Plan
2.9.4.9 Emergency Response Plans
2.9.4.10 Excavation/ Trenching Plan
2.9.4.11 Fall Prevention and Protection Plan
2.9.4.12 Fire Prevention Program
2.9.4.13 Pathogen Exposure
2.9.4.14 Control of Hazardous Energy (lockout/tagout)
2.9.5 Crane Operations
2.9.5.1 Crane Inspections
2.9.5.2 Rigging Gear
2.9.5.3 Crane Operators
2.9.6 Accident and Damage Reporting
2.9.6.1 Accident Reporting and Notification Criteria
2.9.7 Fire Protection
2.9.8 Monthly On-Site Labor Report
2.9.9 OSHA Citations and Violations
2.9.10 Safety Inspections and Monitoring
2.9.11 Safety Certification
2.9.12 Safety Apparel on Jobsites
2.9.13 Emergency Medical Treatment
2.9.14 Excavations
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Sampling, Testing and Laboratory Services
2.10.2.2 ODS Requirements for Refrigerant Recycling
2.10.2.3 Solid Waste Management and Recycling
2.10.2.4 Non-Regulated Waste Disposal
2.10.2.5 Regulated Waste Disposal
2.10.2.6 Universal Waste
2.10.2.7 Spill Prevention, Containment, and Clean-up
2.10.2.8 Hazardous Material Management
2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.10 Noise Control
2.10.2.11 Salvage
2.10.2.12 Asbestos Containing Material (ACM)
2.10.2.13 Clean Air Act (CAA)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Recurring Work Preparation of Proposals
2.14.2 Notification to the Government for Work Above the Recurring Work Limitations
2.14.3 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Work Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Direct Material and Construction Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINS
2.16 Inventory Data Quantity Variation
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays.
Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the Contracting Officer (KO) prior to commencement of work.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
When holidays fall on a Saturday, the preceding Friday will be considered a holiday. When holidays fall on a Sunday, the succeeding Monday will be considered a holiday.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours to the KO per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor may be required to attend administrative and coordination meetings. The Contractor shall meet with the Government’s representative at least weekly throughout the life of the contract. A mutual effort will be made to resolve all problems identified. The written minutes of these meetings shall be prepared by the Government and signed by the Contractor.
Should the Contractor not concur with the minutes, the Contractor shall notify the Government in writing of any areas of disagreement within five
(5) working days of receipt of the minutes.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
The goal of Partnering is to develop a cohesive team with common purpose, commitment and established communication processes.
2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract Partnering
Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.
Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager Site Safety and Health Officer
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses to the KO before work commences and at other times as requested per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 15 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the Government.
2.3.7 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.8 Invoicing
Procedures
Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-04 for sample.
Invoices shall be submitted in a format compatible with the most recent Government installed Microsoft Office Version (currently 2010). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and ELIN/Sub-ELIN.
2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.4 Government-
Furnished Items
Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this Performance Work Statement (PWS).
Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.
The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the Government. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations.
At the completion of the contract, all Government-Furnished Items shall be returned to the Government in the same condition as received, except for reasonable wear and tear. Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by Contractor negligence or abuse.
The Government may inspect Government-Furnished Items at any time and without notice.
2.4.1 Government-
Furnished Property
(GFP)
The Government will not furnish or make available GFP to the Contractor for use in connection with this contract.
2.4.2 Government-
Furnished Facilities
The Government will make available to the Contractor certain facilities for use in connection with this contract. The use of these facilities for any other purposes is prohibited.
The Contractor shall be responsible and accountable for the facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin. Custodial and refuse collection services for the facilities shall be provided by the Contractor. The Contractor shall obtain written approval from the KO prior to making any modifications or alterations to the facilities.
A list of the facilities that will be made available to the Contractor is provided in J-0200000-07.
2.4.3 Government-
Furnished Vehicles and Equipment
No Government-Furnished Vehicles and Equipment provided.
2.4.4 Government-
Furnished Utilities
The Government will make available water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .